ATT 6 Price Breakdown Sample - 1 JULY.xlsx

XLSX spreadsheet 459 KB Posted

Attached to
Amendment - 51 CES GROUND MAINTENANCE SERVIE IN OSAN AIRBASE, REPUBLIC OF KOREA
Solicitation number
W90VN6-25-R-A00500001
Issued by

About this file

This is an Independent Government Cost Estimate (IGCE) spreadsheet for Grounds Maintenance Services at Osan Air Base in the Republic of Korea. The document details a comprehensive grounds maintenance contract covering a base year and four option years, from November 2025 to March 2031, with services including airfield maintenance, vegetation management, tree trimming and removal, debris removal, and snow removal across various area types.

The contract encompasses multiple Contract Line Item Numbers (CLINs) categorized by seasonal maintenance (growing and non-growing seasons) and specific area types such as Airfield BASH Area, Maintenance Support Area (MSA), Improved Area, Semi-Improved Area, and Un-Improved Area. Specific services include maintaining 417.06 acres of airfield, tree trimming and removal for trees ranging from 0-10 inches to 80+ inches in circumference, ditch/drainage maintenance, vegetative and flower bed maintenance, and snow removal along main thoroughfares. The document provides a detailed breakdown of estimated costs, though the actual dollar amounts are placeholder values (marked as "W0" or "W"). The solicitation is issued by the Department of the Army Materiel Command Army Contracting Command, with the solicitation number W90VN6-25-R-A00500001.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Sheet

SUMMARY OF PRICE BREAKDOWN (SAMPLE)
DATE: 25 Apr 2025
PeriodPerformance PeriodFFPREQTotal [KRW]Remarks
Base Year11 Nov 2025 - 10 Sep 2026₩0₩0₩0TRUE
1st Option Year11 Sep 2026 - 10 Sep 2027₩0₩0₩0% EscalationTRUE
2nd Option Year11 Sep 2027 - 10 Sep 2028₩0₩0₩0% EscalationTRUE
3rd Option Year11 Sep 2028 - 10 Sep 2029₩0₩0₩0% EscalationTRUE
4th Option Year11 Sep 2029 - 10 Sep 2030₩0₩0₩0% EscalationTRUE
FAR 52.217-811 Sep 2030 - 10 Mar 2031₩0₩0₩0No EscalationTRUE
Grand Total11 Nov 2025 - 10 Mar 2031₩0₩0₩0

Base Yr

Grounds Maintenance Service Osan AB
COST ESTIMATE BREAKDOWN
DATE: 25 Apr 2025
CLINLINE ITEMUNIT

OF

MEASUREMATERIAL COSTLABOR COSTSOVERHEAD COSTSTOTAL
QuantityUnit PricePriceQuantityUnit PricePriceQuantityUnit PricePrice
Base Year (11 Nov 2025 - 10 Sep 2026)
FFP
0001Maintain Airfield BASH Area (Growing Season)Month
FFP417.06 Acres6
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Tractor---₩ -
Riding lawn mower---₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 8 months---₩ - 0
0002Maintain Airfield BASH Area (Non-Growing Season)Month
FFP417.06 Acres4
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 4 months---₩ - 0
0003AAMaintain MSA (Growing Season) - Except Alpha SiteMonth
FFP138.02 Acres6
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Tractor---₩ -
Riding lawn mower---₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 8 months---₩ - 0
0003ABMaintain MSA (Growing Season) - Alpha SiteMonth
FFP54.10 Acres6
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Tractor---₩ -
Riding lawn mower---₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 8 months---₩ - 0
0004AAMaintain MSA (Non-Growing Season) - Except Alpha SiteMonth
FFP138.02 Acres4
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 4 months---₩ - 0
0004ABMaintain MSA (Non-Growing Season) - Alpha SiteMonth
FFP54.10 Acres4
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 4 months---₩ - 0
0005Maintain Improved Area (Growing Season)Month
FFP272.14 Acres6
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Tractor---₩ -
Riding lawn mower---₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 8 months---₩ - 0
0006Maintain Improved Area (Non-Growing Season)Month
FFP272.14 Acres4
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 4 months---₩ - 0
0007Maintain Semi-Improved Area (Growing Season)Month
FFP296.67 Acres6
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Tractor---₩ -
Riding lawn mower---₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 8 months---₩ - 0
0008Maintain Semi-Improved Area (Non-Growing Season)Month
FFP296.67 Acres4
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 4 months---₩ - 0
0009Maintain Un-Improved Area (Jul, Sep)Month
FFP108.29 Acres2
1Transportation-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Tractor---₩ -
Riding lawn mower---₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Subtotal for 2 months---₩ - 0
0010Remove Debris/Police Grounds on Improved areaMonth
FFP272.14 Acres10
1Transportation-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0011Prune/Trim Shrubs, Hedges and other Plants (Growing Season)Month
FFP6
1Transportation-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 8 months---₩ - 0
0012Maintain Vegetative, Flower BedsMonth
FFP1.5 Acres10
1Transportation-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0013Maintain Ditch/Drainage (Growing Season)Month
FFPCleaning ditch/drainage with/without cover (256,172 ft)6
1Transportation-₩ -
Labor(normal) - blower/shovel/rake/garden fork-₩ -
Tools and Equipments-₩ -
2Disposal--₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
REQ
0014AATree Trimming/Pruning of Circumfrence of 0-10 in.EA
Req.Circumfrence of 0-10 inches (4.5 ft above ground)360
1TransportationEA-₩ -
Labor(skilled) - trimmer-₩ -
Labor(normal) - blower & traffic controller-₩ -
Tools and Equipments-₩ -
Bucket Truck (3 ton)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0014ABTree Trimming/Pruning of Circumfrence of 10-20 in.EA
Req.Circumfrence of 10-20 inches (4.5 ft above ground)240
1TransportationEA-₩ -
Labor(skilled) - trimmer-₩ -
Labor(normal) - blower & traffic controller-₩ -
Tools and Equipments-₩ -
Bucket Truck (3 ton)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0014ACTree Trimming/Pruning of Circumfrence of 20-30 in.EA
Req.Circumfrence of 20-30 inches (4.5 ft above ground)120
1TransportationEA-₩ -
Labor(skilled) - trimmer-₩ -
Labor(normal) - blower & traffic controller-₩ -
Tools and Equipments-₩ -
Bucket Truck (3 ton)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0014ADTree Trimming/Pruning of Circumfrence of 30-40 in.EA
Req.Circumfrence of 30-40 inches (4.5 ft above ground)60
1TransportationEA-₩ -
Labor(skilled) - trimmer-₩ -
Labor(normal) - blower & traffic controller-₩ -
Tools and Equipments-₩ -
Bucket Truck (3 ton)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0014AETree Trimming/Pruning of Circumfrence of 40-60 in.EA
Req.Circumfrence of 40-60 inches (4.5 ft above ground)36
1TransportationEA-₩ -
Labor(skilled) - trimmer-₩ -
Labor(normal) - blower & traffic controller-₩ -
Tools and Equipments-₩ -
Bucket Truck (3 ton)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0014AFTree Trimming/Pruning of Circumfrence of 60-80 in.EA
Req.Circumfrence of 60-80 inches (4.5 ft above ground)24
1TransportationEA-₩ -
Labor(skilled) - trimmer-₩ -
Labor(normal) - blower & traffic controller-₩ -
Tools and Equipments-₩ -
Bucket Truck (3 ton)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0014AGTree Trimming/Pruning of Circumfrence of 80 in. or aboveEA
Req.Circumfrence of 80 inches or above (4.5 ft above ground)12
1TransportationEA-₩ -
Labor(skilled) - trimmer-₩ -
Labor(normal) - blower & traffic controller-₩ -
Tools and Equipments-₩ -
Bucket Truck (3 ton)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0015AATree Removal of Circumfrence of 0-10 in.EA
Req.Circumfrence of 0-10 inches (4.5 ft above ground)120
1TransportationEA-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Excavator (W06)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0015ABTree Removal of Circumfrence of 10-20 in.EA
Req.Circumfrence of 10-20 inches (4.5 ft above ground)100
1TransportationEA-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Excavator (W06)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0015ACTree Removal of Circumfrence of 20-30 in.EA
Req.Circumfrence of 20-30 inches (4.5 ft above ground)80
1TransportationEA-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Excavator (W06)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0015ADTree Removal of Circumfrence of 30-40 in.EA
Req.Circumfrence of 30-40 inches (4.5 ft above ground)50
1TransportationEA-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Excavator (W06)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0015AETree Removal of Circumfrence of 40-60 in.EA
Req.Circumfrence of 40-60 inches (4.5 ft above ground)40
1TransportationEA-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Excavator (W06)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0015AFTree Removal of Circumfrence of 60-80 in.EA
Req.Circumfrence of 60-80 inches (4.5 ft above ground)30
1TransportationEA-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Excavator (W10)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0015AGTree Removal of Circumfrence of 80 in. or aboveEA
Req.Circumfrence of 80 inches or above (4.5 ft above ground)20
1TransportationEA-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Excavator (W10)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0016Disposal of VegetatioinEA
Req.Collect/Transportation/Disposal of Removed Vegetation24
1TransportationEA-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Excavator (W06)---₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0
0017Snow Removal along Main ThroughfareJob
Req.2653.2 meters for both sides
1TransportationEA-₩ -
Labor(skilled)-₩ -
Labor(normal)-₩ -
Tools and Equipments-₩ -
Snow Blower and Salt Spreader--₩ -
2Disposal-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 10 Jobs---₩ - 0
0018Phase inMonth
Req.Phase in2
1Phase in-₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Subtotal for 12 months---₩ - 0

SUM - 0 - 0 - 0 ₩ -

Independent Government Cost Estimate
Grounds Maintenance, Osan AB
Base Year (11 Nov 2025 - 10 Sep 2026)
Growing Season (Mar.-Oct.), Non-growing season(Nov.-Feb.)
CLINDescriptionReferenceUnit of MeasureQuantityUnit PriceAmount
FFP- 0
0001Maintain Airfield BASH Area (Growing Season)Sec. 5.1.Month6- 0- 0
0002Maintain Airfield BASH Area (Non-Growing Season)Sec. 5.1.Month4- 0- 0
0003AAMaintain MSA (Growing Season) - Except Alpha SiteSec. 5.3.Month6- 0- 0
0003ABMaintain MSA (Growing Season) - Alpha SiteSec. 5.3.Month6- 0- 0
0004AAMaintain MSA (Non-Growing Season) - Except Alpha SiteSec. 5.3.Month4- 0- 0
0004ABMaintain MSA (Non-Growing Season) - Alpha SiteSec. 5.3.Month4- 0- 0
0005Maintain Improved Area (Growing Season)Sec. 5.2.Month6- 0- 0
0006Maintain Improved Area (Non-Growing Season)Sec. 5.2.Month4- 0- 0
0007Maintain Semi-Improved Area (Growing Season)Sec. 5.5.Month6- 0- 0
0008Maintain Semi-Improved Area (Non-Growing Season)Sec. 5.5.Month4- 0- 0
0009Maintain Un-Improved Area (Jul, Sep)Sec. 5.8.Month2- 0- 0
0010Remove Debris/Police Grounds on Improved areaSec. 5.7.Month10- 0- 0
0011Prune/Trim Shrubs, Hedges and other Plants (Growing Season)Sec. 5.9.Month6- 0- 0
0012Maintain Vegetative, Flower BedsSec. 5.10.Month10- 0- 0
0013Maintain Ditch/Drainage (Growing Season)Sec. 5.12.Month6- 0- 0
Req.- 0
0014AATree Trimming/Pruning of Circumfrence of 0-10 in.Sec. 5.11.EA360- 0- 0
0014ABTree Trimming/Pruning of Circumfrence of 10-20 in.Sec. 5.11.EA240- 0- 0
0014ACTree Trimming/Pruning of Circumfrence of 20-30 in.Sec. 5.11.EA120- 0- 0
0014ADTree Trimming/Pruning of Circumfrence of 30-40 in.Sec. 5.11.EA60- 0- 0
0014AETree Trimming/Pruning of Circumfrence of 40-60 in.Sec. 5.11.EA36- 0- 0
0014AFTree Trimming/Pruning of Circumfrence of 60-80 in.Sec. 5.11.EA24- 0- 0
0014AGTree Trimming/Pruning of Circumfrence of 80 in. or aboveSec. 5.11.EA12- 0- 0
0015AATree Removal of Circumfrence of 0-10 in.Sec. 5.11.EA120- 0- 0
0015ABTree Removal of Circumfrence of 10-20 in.Sec. 5.11.EA100- 0- 0
0015ACTree Removal of Circumfrence of 20-30 in.Sec. 5.11.EA80- 0- 0
0015ADTree Removal of Circumfrence of 30-40 in.Sec. 5.11.EA50- 0- 0
0015AETree Removal of Circumfrence of 40-60 in.Sec. 5.11.EA40- 0- 0
0015AFTree Removal of Circumfrence of 60-80 in.Sec. 5.11.EA30- 0- 0
0015AGTree Removal of Circumfrence of 80 in. or aboveSec. 5.11.EA20- 0- 0
0016Disposal of VegetatioinSec. 5.14.EA24- 0- 0
0018Phase in-Month2- 0- 0
Base Year Total Amount- 0
TRUE

1st Op Yr

Grounds Maintenance Service Osan AB1Option yr
COST ESTIMATE BREAKDOWN
DATE: 25 Apr 2025
CLINLINE ITEMUNIT

OF

MEASUREMATERIAL COSTLABOR COSTSOVERHEAD COSTSTOTAL
QuantityUnit PricePriceQuantityUnit PricePriceQuantityUnit PricePrice
1st Option Year (11 Sep 2026 - 10 Sep 2027)
FFP
1001Maintain Airfield BASH Area (Growing Season)Month
FFP417.06 Acres8
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Tractor---------₩ -
Riding lawn mower---------₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 8 months---₩ - 0
1002Maintain Airfield BASH Area (Non-Growing Season)Month
FFP417.06 Acres4
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 4 months---₩ - 0
1003AAMaintain MSA (Growing Season) - Except Alpha SiteMonth
FFP138.02 Acres8
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Tractor---------₩ -
Riding lawn mower---------₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 8 months---₩ - 0
1003ABMaintain MSA (Growing Season) - Alpha SiteMonth
FFP54.10 Acres8
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Tractor---------₩ -
Riding lawn mower---------₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 8 months---₩ - 0
1004AAMaintain MSA (Non-Growing Season) - Except Alpha SiteMonth
FFP138.02 Acres4
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 4 months---₩ - 0
1004ABMaintain MSA (Non-Growing Season) - Alpha SiteMonth
FFP54.10 Acres4
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 4 months---₩ - 0
1005Maintain Improved Area (Growing Season)Month
FFP272.14 Acres8
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Tractor---------₩ -
Riding lawn mower---------₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 8 months---₩ - 0
1006Maintain Improved Area (Non-Growing Season)Month
FFP272.14 Acres4
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 4 months---₩ - 0
1007Maintain Semi-Improved Area (Growing Season)Month
FFP296.67 Acres8
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Tractor---------₩ -
Riding lawn mower---------₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 8 months---₩ - 0
1008Maintain Semi-Improved Area (Non-Growing Season)Month
FFP296.67 Acres4
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 4 months---₩ - 0
1009Maintain Un-Improved Area (Jul, Sep)Month
FFP108.29 Acres2
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Tractor---------₩ -
Riding lawn mower---------₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 2 months---₩ - 0
1010Remove Debris/Police Grounds on Improved areaMonth
FFP272.14 Acres12
1Transportation---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1011Prune/Trim Shrubs, Hedges and other Plants (Growing Season)Month
FFP8
1Transportation---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 8 months---₩ - 0
1012Maintain Vegetative, Flower BedsMonth
FFP1.5 Acres12
1Transportation---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1013Maintain Ditch/Drainage (Growing Season)Month
FFPCleaning ditch/drainage with/without cover (256,172 ft)8
1Transportation---₩ -
Labor(normal) - blower/shovel/rake/garden fork---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 8 months---₩ - 0
REQ
1014AATree Trimming/Pruning of Circumfrence of 0-10 in.EA
Req.Circumfrence of 0-10 inches (4.5 ft above ground)360
1TransportationEA---₩ -
Labor(skilled) - trimmer---₩ -
Labor(normal) - blower & traffic controller---₩ -
Tools and Equipments---₩ -
Bucket Truck (3 ton)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1014ABTree Trimming/Pruning of Circumfrence of 10-20 in.EA
Req.Circumfrence of 10-20 inches (4.5 ft above ground)240
1TransportationEA---₩ -
Labor(skilled) - trimmer---₩ -
Labor(normal) - blower & traffic controller---₩ -
Tools and Equipments---₩ -
Bucket Truck (3 ton)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1014ACTree Trimming/Pruning of Circumfrence of 20-30 in.EA
Req.Circumfrence of 20-30 inches (4.5 ft above ground)120
1TransportationEA---₩ -
Labor(skilled) - trimmer---₩ -
Labor(normal) - blower & traffic controller---₩ -
Tools and Equipments---₩ -
Bucket Truck (3 ton)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1014ADTree Trimming/Pruning of Circumfrence of 30-40 in.EA
Req.Circumfrence of 30-40 inches (4.5 ft above ground)60
1TransportationEA---₩ -
Labor(skilled) - trimmer---₩ -
Labor(normal) - blower & traffic controller---₩ -
Tools and Equipments---₩ -
Bucket Truck (3 ton)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1014AETree Trimming/Pruning of Circumfrence of 40-60 in.EA
Req.Circumfrence of 40-60 inches (4.5 ft above ground)36
1TransportationEA---₩ -
Labor(skilled) - trimmer---₩ -
Labor(normal) - blower & traffic controller---₩ -
Tools and Equipments---₩ -
Bucket Truck (3 ton)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1014AFTree Trimming/Pruning of Circumfrence of 60-80 in.EA
Req.Circumfrence of 60-80 inches (4.5 ft above ground)24
1TransportationEA---₩ -
Labor(skilled) - trimmer---₩ -
Labor(normal) - blower & traffic controller---₩ -
Tools and Equipments---₩ -
Bucket Truck (3 ton)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1014AGTree Trimming/Pruning of Circumfrence of 80 in. or aboveEA
Req.Circumfrence of 80 inches or above (4.5 ft above ground)12
1TransportationEA---₩ -
Labor(skilled) - trimmer---₩ -
Labor(normal) - blower & traffic controller---₩ -
Tools and Equipments---₩ -
Bucket Truck (3 ton)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1015AATree Removal of Circumfrence of 0-10 in.EA
Req.Circumfrence of 0-10 inches (4.5 ft above ground)120
1TransportationEA---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Excavator (W06)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1015ABTree Removal of Circumfrence of 10-20 in.EA
Req.Circumfrence of 10-20 inches (4.5 ft above ground)100
1TransportationEA---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Excavator (W06)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1015ACTree Removal of Circumfrence of 20-30 in.EA
Req.Circumfrence of 20-30 inches (4.5 ft above ground)80
1TransportationEA---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Excavator (W06)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1015ADTree Removal of Circumfrence of 30-40 in.EA
Req.Circumfrence of 30-40 inches (4.5 ft above ground)50
1TransportationEA---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Excavator (W06)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1015AETree Removal of Circumfrence of 40-60 in.EA
Req.Circumfrence of 40-60 inches (4.5 ft above ground)40
1TransportationEA---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Excavator (W06)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1015AFTree Removal of Circumfrence of 60-80 in.EA
Req.Circumfrence of 60-80 inches (4.5 ft above ground)30
1TransportationEA---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Excavator (W10)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1015AGTree Removal of Circumfrence of 80 in. or aboveEA
Req.Circumfrence of 80 inches or above (4.5 ft above ground)20
1TransportationEA---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Excavator (W10)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1016Disposal of VegetatioinEA
Req.Collect/Transportation/Disposal of Removed Vegetation24
1TransportationEA---₩ -
Labor(skilled)-₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Excavator (W06)---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 12 months---₩ - 0
1017Snow Removal along Main ThroughfareJob
Req.2653.2 meters for both sides
1TransportationEA---₩ -
Labor(skilled)-₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Snow Blower and Salt Spreader---------₩ -
2Disposal---₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal---₩ -
Escalation Adjusted---₩ -
Subtotal for 10 Jobs---₩ - 0

SUM - 0 - 0 - 0 ₩ -

Independent Government Cost Estimate
Grounds Maintenance, Osan AB
1st Option Year (11 Sep 2026 - 10 Sep 2027)
Growing Season (Mar.-Oct.), Non-growing season(Nov.-Feb.)
CLINDescriptionReferenceUnit of MeasureQuantityUnit PriceAmount
FFP- 0
1001Maintain Airfield BASH Area (Growing Season)Sec. 5.1.Month8- 0- 0
1002Maintain Airfield BASH Area (Non-Growing Season)Sec. 5.1.Month4- 0- 0
1003AAMaintain MSA (Growing Season) - Except Alpha SiteSec. 5.3.Month8- 0- 0
1003ABMaintain MSA (Growing Season) - Alpha SiteSec. 5.3.Month8- 0- 0
1004AAMaintain MSA (Non-Growing Season) - Except Alpha SiteSec. 5.3.Month4- 0- 0
1004ABMaintain MSA (Non-Growing Season) - Alpha SiteSec. 5.3.Month4- 0- 0
1005Maintain Improved Area (Growing Season)Sec. 5.2.Month8- 0- 0
1006Maintain Improved Area (Non-Growing Season)Sec. 5.2.Month4- 0- 0
1007Maintain Semi-Improved Area (Growing Season)Sec. 5.5.Month8- 0- 0
1008Maintain Semi-Improved Area (Non-Growing Season)Sec. 5.5.Month4- 0- 0
1009Maintain Un-Improved Area (Jul, Sep)Sec. 5.8.Month2- 0- 0
1010Remove Debris/Police Grounds on Improved areaSec. 5.7.Month12- 0- 0
1011Prune/Trim Shrubs, Hedges and other Plants (Growing Season)Sec. 5.9.Month8- 0- 0
1012Maintain Vegetative, Flower BedsSec. 5.10.Month12- 0- 0
1013Maintain Ditch/Drainage (Growing Season)Sec. 5.12.Month8- 0- 0
Req.- 0
1014AATree Trimming/Pruning of Circumfrence of 0-10 in.Sec. 5.11.EA360- 0- 0
1014ABTree Trimming/Pruning of Circumfrence of 10-20 in.Sec. 5.11.EA240- 0- 0
1014ACTree Trimming/Pruning of Circumfrence of 20-30 in.Sec. 5.11.EA120- 0- 0
1014ADTree Trimming/Pruning of Circumfrence of 30-40 in.Sec. 5.11.EA60- 0- 0
1014AETree Trimming/Pruning of Circumfrence of 40-60 in.Sec. 5.11.EA36- 0- 0
1014AFTree Trimming/Pruning of Circumfrence of 60-80 in.Sec. 5.11.EA24- 0- 0
1014AGTree Trimming/Pruning of Circumfrence of 80 in. or aboveSec. 5.11.EA12- 0- 0
1015AATree Removal of Circumfrence of 0-10 in.Sec. 5.11.EA120- 0- 0
1015ABTree Removal of Circumfrence of 10-20 in.Sec. 5.11.EA100- 0- 0
1015ACTree Removal of Circumfrence of 20-30 in.Sec. 5.11.EA80- 0- 0
1015ADTree Removal of Circumfrence of 30-40 in.Sec. 5.11.EA50- 0- 0
1015AETree Removal of Circumfrence of 40-60 in.Sec. 5.11.EA40- 0- 0
1015AFTree Removal of Circumfrence of 60-80 in.Sec. 5.11.EA30- 0- 0
1015AGTree Removal of Circumfrence of 80 in. or aboveSec. 5.11.EA20- 0- 0
1016Disposal of VegetatioinSec. 5.14.EA24- 0- 0
1st Option Year Total Amount- 0
TRUE

2nd Op Yr

Grounds Maintenance Service Osan AB2Option yr
COST ESTIMATE BREAKDOWN
DATE: 25 Apr 2025
CLINLINE ITEMUNIT

OF

MEASUREMATERIAL COSTLABOR COSTSOVERHEAD COSTSTOTAL
QuantityUnit PricePriceQuantityUnit PricePriceQuantityUnit PricePrice
2nd Option Year (11 Sep 2027 - 10 Sep 2028)
FFP
2001Maintain Airfield BASH Area (Growing Season)Month
FFP417.06 Acres8
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
Tractor---------₩ -
Riding lawn mower---------₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-
Industrial Safety and Health Cost-
Administration Cost-
Profit-
Indirect Cost Sum---₩ -
Subtotal per month---₩ -
Escalation Adjusted---₩ -
Subtotal for 8 months---₩ - 0
2002Maintain Airfield BASH Area (Non-Growing Season)Month
FFP417.06 Acres4
1Transportation---₩ -
Labor(skilled)---₩ -
Labor(normal)---₩ -
Tools and Equipments---₩ -
2Disposal------₩ -

Direct Cost Sum - - - ₩ -

Indirect Labor Cost-
Industrial accident Insurance-
Unemployment Insurance-
Health insurance-
National Pension-
Long-Term Care Insurance-
Retirement Deduction Fee-

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .