1. Drawings SMYU 24-1056.pdf
PDF 691 KB Posted
- Solicitation number
- W90VN6-24-R-0023
About this file
This document contains project drawings for a federal contract opportunity to repair sanitary sewer lines and grease traps at several buildings on Osan Air Force Base in South Korea under Solicitation W90VN6-24-R-0023. The drawings provide details on the specific tasks required at each building, including replacing grease traps, flushing out grease lines, connecting to existing sewer manholes, and capping or removing unused lines. The contract is limited to MATOC work plan contractors in the Suwon and Osan areas. The contracting agency is the Department of the Army Materiel Command Army Contracting Command. The drawings do not provide information on the solicitation schedule, pricing, or set-asides.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W90VN6-24-R-0023-0001.pdf | ||
| 5. B975 As-built.pdf | ||
| 3. B828 95_ Drawings.pdf | ||
| 2. B828 Sketch.pdf | ||
| Submittal Register.pdf | ||
| 4. B975 Sketch.pdf | ||
| W90VN6-24-R-0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT TO SCALE
NORTH
CIVIL ENGINEERING/
SHT. NO. REF. NO.
DESCRIPTION
DRAWING SCHEDULE
ENVIRONMENTAL COORDINATION
THIS FACILITY CONTAINS NO ASBESTOS
THIS FACILITY CONTAINS ASBESTOS, AREAS WILL NOT BE DISTURBED BY THIS PROJECT
THIS FACILITY CONTAINS ASBESTOS, GOVERNMENT WILL ABATE PRIOR TO CONTRACT AWARD
THIS FACILITY CONTAINS ASBESTOS, CONTRACTOR IS RESPONSIBLE FOR ABATEMENT
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DEPARTMENT OF THE AIR FORCE
51st CIVIL ENGINEER SQUADRON (PACAF)
APO AP 96266
OSAN AB, REPUBLIC OF KOREA
DRAWING NO:
PROJECT NO:
REF. NO:
CHIEF, CONSTRUCTION MANAGEMENT
CHIEF OF DESIGN
CHIEF OF CONTRACTS
ENVIRONMENTAL FLIGHT
FIRE DEPARTMENT
CORROSION ENGINEER
COMMUNICATIONS
BIOENVIRONMENTAL ENGINEERING
SAFETY
SECURITY FORCE
USING AGENCY
CHIEF, OPERATIONS FLIGHT
CHIEF, PROGRAMS FLIGHT
BASE CIVIL ENGINEER
MAIN GATE
AS SHOWN
OSAN AB, KOREA
SHEET 1 OF 5
T-01
MORIN GATE
CONTRACTING OFFICE, B600
SMYU 24-1056
REPAIR SANITARY SEWER LINES AND
TITLE SHEET
REPAIR SANITARY SEWER LINES AND GREASE TRAP FOR B828, 965 AND B975
SMYU 24-1056
T-01
FIRE DEPARTMENT, B671
GREASE TRAP FOR B828, 965 AND B975
TITLE SHEET
X
C-001
C-002
THIS PROJECT
CAPT. FOSTER, MATTHEW
HONG, CHIN HO
CUI
B975 B965
B828
CAPT. FOSTER, MATTHEW
SITE PLAN, PROJECT NOTES
ENLARGED SITE PLAN, B828 TASKS
C-0034 OF 5
ENLARGED SITE PLAN, B965 TASKS
C-0045 OF 5
ENLARGED SITE PLAN, B975 TASKS
S o n g t a n
B l v d
S a b e r
R o a d
Colorado Road
821828
S o n g t a n l v d
S a b e r
R o a d
B ro a d w a y B lv d
Colorado Road
821828
C-001
D
2 3
C
4 5
B
SHEET
IDENTIFICATION
SHEET OF
A
2 5
R E
P A
I R
A N
I T
A R
Y
S
E W
E
L
N
N D
M
Y U
G R
E A
T
A
P
F
O
A
S I T
E
P
L A
N
P
R O
J E
C
T
E S
P R
O J E
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
S I Z
E
P L
A
L E
P
L O
T
D
A T
E
D A
T E
C E
S C
E N
M P
A P
O
A
P
U n i t
S
E
C
I V
G
I N
E E
R S
K O
R E
A
O S
F
R
S
E
S T
D R
A W
I N
G
N
O
SITE PLAN
1:500
1. THIS DRAWING DOES NOT SHOW EVERY EXISTING SITE CONDITION. CONTRACTOR SHALL VERIFY
SITE CONDITIONS BASED ON SITE SURVEY.
2. ANY PAVEMENT, FLOORING, OR FACILITY DEMOLITION INCIDENTAL TO WORK SHALL BE REPAIRED
BY CONTRACTOR.
PROJECT NOTES
A N
S I
D
S M
D
W G
C A
P T
F
O S
T E
R
M
A T
T H
E W
C A
P T
F
O S
T E
R
M
A T
T H
E W
S M
H O
N G
C
H
H
CLEANOUT
6" GW
6" D
EXISTING GREASE TRAP
EXISTING
SEWAGE
LIFT STATION
CUI
SEE SHEET C-003
SEE SHEET C-002
SEE SHEET C-004
EXISTING GREASE TRAP
EXISTING GREASE TRAP
975975
C-002
D
2 3
C
4 5
B
SHEET
IDENTIFICATION
SHEET OF
A
3 5
R E
P A
N
I T
A R
Y
S
E W
N
G R
E A
A
P
F
A
E N
L A
R G
T
E
P
L A
N
B
T
A S
K
P
O J E
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
S I Z
E
P L
A
L E
P
L O
T
D
A T
E
D A
T E
C E
S C
E N
M P
A P
O
A
P
U n i t
S
E
C
I V
G
I N
E E
R S
K O
R E
A
O S
R
S
E
S T
D R
A W
I N
G
N
O
ENLARGED SITE PLAN, B975 TASKS
1:100
A N
S I
D
S M
D
W G
C A
P T
F
O S
T E
R
M
A T
T H
E W
C A
P T
F
O S
T E
R
M
A T
T H
E W
S M
H O
N G
C
H
4" GW
4" D
REPLACE 35 GPM GREASE TRAP WITH 50 GPM GREASE
TRAP AND 4" WASTE LINE.
CONNECT TO EXISTING SEWER MANHOLE.
CUI
1. THIS DRAWING DOES NOT SHOW EVERY EXISTING SITE CONDITION. CONTRACTOR SHALL VERIFY
SITE CONDITIONS BASED ON SITE SURVEY.
2. ANY PAVEMENT, FLOORING, OR FACILITY DEMOLITION INCIDENTAL TO WORK SHALL BE REPAIRED
BY CONTRACTOR.
PROJECT NOTES
EXISTING SEWER MANHOLE
SEE AS-BUILT FOR INTERIOR DETAILS.
FLUSH OUT GREASE LINE AND CLEAN OUT DRAINS.
GW REPLACEMENT TO FIRST
CLEANOUT INSIDE BUILDING
EXISTING MANHOLE
826833
C-003
D
2 3
C
4 5
B
SHEET
IDENTIFICATION
SHEET OF
A
4 5
R E
P A
N
I T
A R
Y
S
E W
N
G R
E A
A
P
F
A
E N
L A
R G
T
E
P
L A
N
B
T
A S
O J E
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
S I Z
E
P L
A
L E
P
L O
T
D
A T
E
D A
T E
C E
S C
E N
M P
A P
O
A
P
U n i t
S
E
C
I V
G
I N
E E
R S
K O
R E
A
O S
R
S
E
S T
D R
A W
I N
G
N
O
ENLARGED SITE PLAN, B828 TASKS
1:100
A N
S I
D
S M
D
W G
C A
P T
F
O S
T E
R
M
A T
T H
E W
C A
P T
F
O S
T E
R
M
A T
T H
E W
S M
H O
N G
C
H
EXISTING CLEANOUT
6" GW
6" D
EXISTING
SEWAGE
LIFT STATION
REMOVE GREASE TRAP, AND CLEANOUT
AND GREASE WASTE LINE.
CUI
1. THIS DRAWING DOES NOT SHOW EVERY EXISTING SITE CONDITION. CONTRACTOR SHALL VERIFY
SITE CONDITIONS BASED ON SITE SURVEY.
2. ANY PAVEMENT, FLOORING, OR FACILITY DEMOLITION INCIDENTAL TO WORK SHALL BE REPAIRED
BY CONTRACTOR.
PROJECT NOTES
D
D
D
CUT AND CAP LINE
S
S
S
S
CAP LINE @FOUNDATION
NEW 50 GPM GREASE INTERCEPTOR
NEW CLEANOUT
NEW 6"GW
SEE AS-BUILT FOR CONNECTION DETAIL
CLEAN OUT DRAINS AND FLUSH OUT
INTERIOR GREASE LINES
CONNECT NEW 6" LINE
WITH EXISTING SEWER LINE
C-004
D
2 3
C
4 5
B
SHEET
IDENTIFICATION
SHEET OF
A
5 5
R E
P A
N
I T
A R
Y
S
E W
N
G R
E A
A
P
F
A
E N
L A
R G
T
E
P
L A
N
B
T
A S
R
O J E
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
S I Z
E
P L
A
L E
P
L O
T
D
A T
E
D A
T E
C E
S C
E N
M P
A P
O
A
P
U n i t
S
E
C
I V
G
I N
E E
R S
K O
R E
A
O S
R
S
E
S T
D R
A W
I N
G
N
O
ENLARGED SITE PLAN, B965 TASKS
1:100
A N
S I
D
S M
D
W G
C A
P T
F
O S
T E
R
M
A T
T H
E W
C A
P T
F
O S
T E
R
M
A T
T H
E W
S M
H O
N G
C
H
EXISTING 4" GW
REPLACE GREASE TRAP WITH
NEW GREASE INTERCEPTOR (600GPM)
CUI
1. THIS DRAWING DOES NOT SHOW EVERY EXISTING SITE CONDITION. CONTRACTOR SHALL VERIFY
SITE CONDITIONS BASED ON SITE SURVEY.
2. ANY PAVEMENT, FLOORING, OR FACILITY DEMOLITION INCIDENTAL TO WORK SHALL BE REPAIRED
BY CONTRACTOR.
PROJECT NOTES
REPLACE LINE, CONNECT NEW GREASE INTERCEPTOR TO
EXISTING MANHOLE
FLUSH OUT GREASE LINES
FROM INTERIOR CLEANOUTS
EXISTING MANHOLE
REPLACE EXTERIOR GREASE WITH 6" LINE
MANHOLE/CLEAN-OUT TO BE
INSTALLED/REPLACED
1363639751U Oval
1363639751U Polygonal Line
| SMYU 24-1056 Cover_Model-Cover Sheet D-Size |
| Sheets and Views |
| Cover Sheet D-Size |
| SMYU 24-1056-C-01 |
| Sheets and Views |
| C-01 |
| SMYU 24-1056-C-02 |
| Sheets and Views |
| C-02 |
| SMYU 24-1056-C-03 |
| Sheets and Views |
| C-03 |
| SMYU 24-1056-C-04 |
| Sheets and Views |
| C-04 |
File details come from the government source that posted it. Updated .