This document is a Submittal Register for a federal contract opportunity titled "SMYU 22-1066 Demo B504, B720, B728, Fac #638" at Osan Air Base. The key requirements include demolishing several buildings and associated infrastructure, disposing of materials, and performing site restoration. The contractor must submit various preconstruction, shop drawing, product data, test report, certificate, and closeout submittals related to the work, such as a demolition plan, hazardous waste management plan, safety plan, schedule, quality control plan, and as-built records. The federal contract opportunity is solicitation W90VN6-24-R-0016 issued by the Department of the Army Materiel Command. The scope includes demolishing buildings, fuel tanks, utilities, paving, and landscaping, and installing a new parking lot. Key submittal due dates and approval authorities are specified in the register.

View the file

Other files

File Type Posted
Project Drawings Final.pdf PDF
W90VN6-24-R-0016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity #

Trans-mittal #

Specification Section

SD #

Submittal Description Item Submitted

Paragraph #

Classificati on: GOVT or A/E Revwr

Submit

Approval Needed By

Material Needed By

Action Code

Date Of Action

Date FWD to APPR / Auth Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Revwr

Action Code

Date Of Action

Mailed To

CONTR/

Date RCD From

APPR

Authority Remarks

1 01 30 00 01 Preconstruction Submittals View location map 1.4 G

2 01 30 00 01 Preconstruction Submittals Progress and completion pictures 1.5

3 01 32 01.00 10 01 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G

4 01 32 01.00 10 01 Preconstruction Submittals Initial Project Schedule 3.4.2 G

5 01 32 01.00 10 01 Preconstruction Submittals Initial Project Schedule 3.4.2 G

6 01 32 01.00 10 01 Preconstruction Submittals Periodic Schedule Updates 3.4.3 G

7 01 32 01.00 10 01 Preconstruction Submittals Schedule Status Report 3.1.2 G

8 01 33 00 01 Preconstruction Submittals Submittal register 1.8 G

9 01 35 26 01 Preconstruction Submittals SAFETY PLAN /ACCIDENT

PREVENTION PLAN (APP)

1.6

10 01 35 26 01 Preconstruction Submittals Activity Hazard Analysis (AHA) 1.7

11 01 35 26 06 Test Reports Notifications and Reports 1.11

12 01 35 26 06 Test Reports Accident Reports 1.11.2

13 01 35 26 06 Test Reports Certificate of Compliance 1.11.4

14 01 35 26 07 Certificates Hot work permit 1.8

15 01 35 26 07 Certificates License Certificates 1.13

16 01 35 29.13 02 Shop Drawings Work Zones 1.20.1 G

17 01 35 29.13 02 Shop Drawings Decontamination Facilities 1.21.1 G

18 01 35 29.13 03 Product Data Exposure Monitoring/Air Sampling Program

1.13

19 01 35 29.13 03 Product Data Site Control Log 1.20.2

20 01 35 29.13 03 Product Data Employee Certificates 1.12.4

21 01 45 00.00 10 01 Preconstruction Submittals Quality Control Plan 3.2 G

22 01 50 00 01 Preconstruction Submittals Traffic control plan 3.4.1 G

23 01 57 20.00 10 01 Preconstruction Submittals Environmental Protection Plan 1.7 G

24 01 58 00 02 Shop Drawings Construction Project Sign 1.2.1 G

25 01 74 19 01 Preconstruction Submittals Waste Management Plan 1.6 G

26 01 74 19 11 Closeout Submittals Records 1.7

27 01 78 00 03 Product Data As-Built Record of Equipment and Materials

1.3.2

28 01 78 00 03 Product Data Equipment-in-Place List 1.3.4

29 01 78 00 03 Product Data Warranty Management Plan 1.6.1

30 01 78 00 03 Product Data Warranty Tags 1.6.5

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR SCHEDULE DATES CONTRACTOR

ACTION APPROVING AUTHORITY

APPROVING AUTHORITY

(d)

(d)

TITLE: SMYU 22-1066 Demo B504, B720, B728, Fac #638 SUBMITTAL REGISTERJOB NAME:

LOCATION: OSAN AB

CONTRACT NO:

CONTRACTOR:

TITLE: SMYU 22-1066 Demo B504, B720, B728, Fac #638 SUBMITTAL REGISTERJOB NAME:

LOCATION: OSAN AB

CONTRACT NO:

CONTRACTOR:

CONTRACTOR SCHEDULE DATES CONTRACTOR

ACTION

31 01 78 00 03 Product Data Spare Parts Data 1.4

32 01 78 00 08 Manufacturer’s Instructions Preventative Maintenance 1.5

33 01 78 00 08 Manufacturer’s Instructions Condition Monitoring (Predictive Testing)

1.5

34 01 78 00 08 Manufacturer’s Instructions Inspection 1.5

35 01 78 00 08 Manufacturer’s Instructions Instructions 1.6.1

36 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 1.7

37 01 78 00 11 Closeout Submittals Record Drawings 1.3.1

38 01 78 00 11 Closeout Submittals Interim Form DD1354 1.9 G

39 01 78 00 11 Closeout Submittals Checklist for Form DD1354 1.9 G

40 02 41 00 01 Preconstruction Submittals Existing Conditions 1.11 G

41 02 41 00 07 Certificates Demolition Plan 1.2.1 G

42 02 41 00 07 Certificates Deconstruction Plan 1.2.1 G

43 02 41 00 07 Certificates Notification 1.7 G

44 02 41 00 11 Closeout Submittals Receipts 3.3.4

45 02 61 13 02 Shop Drawings Surveys 3.1 G

46 02 61 13 03 Product Data Work Plan 1.2 G

47 02 61 13 03 Product Data Closure Report 3.11 G

48 02 61 13 06 Test Reports Backfill 2.2 G

49 02 61 13 06 Test Reports Surveys 3.1 G

50 02 61 13 06 Test Reports Compaction 3.9.2 G

51 02 65 00 01 Preconstruction Submittals Work Plan 1.4.4 G

52 02 65 00 01 Preconstruction Submittals Site safety and health plan 1.4.4.1 G

53 02 65 00 01 Preconstruction Submittals Excavation and material handling plan 1.4.4.2 G

54 02 65 00 01 Preconstruction Submittals Tank and piping removal and disposal plan

1.4.4.4 G

55 02 65 00 01 Preconstruction Submittals Spill and discharge control plan 1.4.4.5 G

56 02 65 00 01 Preconstruction Submittals Qualifications 1.4.1 G

57 02 65 00 06 Test Reports Backfill Material 2.1 G

58 02 65 00 06 Test Reports Tank Contents Verification 3.2 G

59 02 65 00 06 Test Reports Contaminated Water Disposal 3.5.2 G

60 02 65 00 06 Test Reports Backfilling 3.11 G

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

61 02 65 00 06 Test Reports Tank Closure Report 3.15 G

62 02 65 00 11 Closeout Submittals Salvage Rights 3.12.4 G

63 02 65 00 11 Closeout Submittals Tank Closure Report 3.15 G

64 02 81 00 03 Product Data Onsite Hazardous Waste Management 3.1 G

65 02 81 00 03 Product Data Notices of Non-Compliance and Notices of Violation

3.2

66 02 81 00 06 Test Reports Recordkeeping 3.6 G

67 02 81 00 06 Test Reports Spill Response 3.7

68 02 81 00 06 Test Reports Exception Report 3.6 G

69 02 81 00 07 Certificates Certification 1.4.3

70 02 81 00 07 Certificates Security Plan 3.2.4

CONTRACTOR SCHEDULE DATES CONTRACTOR

ACTION APPROVING AUTHORITY

(d)

TITLE: SMYU 22-1066 Demo B504, B720, B728, Fac #638 SUBMITTAL REGISTERJOB NAME:

LOCATION: OSAN AB

CONTRACT NO:

CONTRACTOR:

71 02 81 00 07 Certificates Transportation and Disposal Coordinator

1.4.1 G

72 02 81 00 07 Certificates Training 1.4.2 G

73 02 81 00 07 Certificates EPA Offsite Policy 3.2.2

74 02 81 00 07 Certificates Certificates of Disposal 3.2.5

75 02 81 00 07 Certificates Waste Minimization 3.5 G

76 02 82 14.00 10 02 Shop Drawings Detailed Drawings 1.3 G

77 02 82 14.00 10 03 Product Data Asbestos Waste Shipment Records 3.11.3.1

78 02 82 14.00 10 03 Product Data Respiratory Protection Program 1.8.1 G

79 02 82 14.00 10 03 Product Data Cleanup and Disposal 3.11

80 02 82 14.00 10 03 Product Data Qualifications 1.5.1 G

81 02 82 14.00 10 03 Product Data Training Program 1.10

82 02 82 14.00 10 03 Product Data Licenses, Permits and Notifications 1.7.1

83 02 82 14.00 10 03 Product Data Asbestos Management Plan 3.11.3.2

84 02 82 14.00 10 06 Test Reports Exposure Assessment and Air Monitoring

3.9

85 02 83 19.00 10 03 Product Data Materials and Equipment 2.1

86 02 83 19.00 10 03 Product Data Expendable Supplies 2.1.1

87 02 83 19.00 10 03 Product Data Qualifications 1.5.1 G

88 02 83 19.00 10 06 Test Reports Licenses, Permits and Notifications 1.5.5 G

89 02 83 19.00 10 06 Test Reports Sampling and Analysis 1.3.3

90 02 83 19.00 10 06 Test Reports Abatement Report 3.5 G

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

91 32 11 23 03 Product Data Aggregate Base Course 2.2

92 32 11 23 06 Test Reports sampling and Testing 1.4 G

93 32 11 23 06 Test Reports Field Density Test 3.5.5 G

94 32 11 23 06 Test Reports Smoothness Test 3.6

95 32 12 10 06 Test Reports Tack Coat 3.7

96 32 12 10 01 Test Reports Prime Coat

97 32 12 16 03 Product Data Mix Design 2.3 G

98 32 12 16 06 Test Reports Aggregates 2.1 G

99 32 12 16 07 Certificates Asphalt Cement Binder 2.2

100 32 12 16 07 Certificates Testing Laboratory 3.6

101 32 13 13.06 03 Product Data Curing Materials 2.1.5

102 32 13 13.06 03 Product Data Admixtures 2.1.5

103 32 13 13.06 03 Product Data Reinforecement 2.1.5

104 32 13 13.06 03 Product Data Mix Design 2.3 G

105 32 13 13.06 03 Product Data Aggregate 2.1.2

106 32 13 13.06 06 Test Reports Concrete Slump Tests 3.7.2

107 32 13 13.06 06 Test Reports Cementitious Material 2.1.1 G

108 32 13 13.06 07 Certificates Ready Mix Concrete Plant 1.5.1

109 32 13 13.06 07 Certificates Cementitious Material 2.1.1 G

110 32 21 13.53 02 Shop Drawings Fence Installation 1.3.2

111 32 13 13.06 02 Shop Drawings Installation Drawings 1.3.2

112 32 13 13.06 03 Product Data Fence Installation 1.3.2 G

CONTRACTOR SCHEDULE DATES CONTRACTOR

ACTION APPROVING AUTHORITY

(d)

TITLE: SMYU 22-1066 Demo B504, B720, B728, Fac #638 SUBMITTAL REGISTERJOB NAME:

LOCATION: OSAN AB

CONTRACT NO:

CONTRACTOR:

113 32 92 19 03 Product Data Seed 2.1

114 32 92 19 03 Product Data Fertilizer 2.4

115 32 92 19 03 Product Data Fence Installation 1.3.2 G

116 32 92 19 06 Test Reports Topsoil composition tests 2.2.3

117 32 92 19 06 Test Reports Erosion Control Mateials 2.7