This document is a Request for Proposal (RFP) for the demolition and disposal of multiple vacant facilities at Osan Air Base in South Korea. The key details are:

The principal features of the demolition work include: (1) Demolishing and disposing of buildings 504, 720, 728, and Facility 638, including all building elements, related infrastructure, and outdoor site elements; (2) Maintaining certain existing utilities and infrastructure within the project boundaries; (3) Converting the site of Facility 638 to an asphalt concrete parking lot; and (4) Segregating and disposing of materials, including scrap metal, in accordance with environmental regulations and the Osan AB Qualified Recycling Program. The contractor will be responsible for terminating, removing, and capping existing utilities, as well as addressing any contaminated soil encountered during demolition. The contractor must also implement stormwater best management practices at the demolition sites. The solicitation number is W90VN6-24-R-0016, and the contracting agency is the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
W90VN6-24-R-0016.pdf PDF
Submittal Register.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-1 Site Plan- Bldg. 504 Project Boundary

Remove Sewer Service Line and Septic Tank

Remove Fuel Tank

Remove Electrical Meter

Remove Air Conditioners

Maintain Stormwater Main Line

Remove Water Valve and Service Line

CUI

Protect & Maintain existing Pad Mounted Transformer and Seal/Cap conduits at existing Pad Mounted Transformer After Electric Service Line removal

Remove Electric Service Line Including underground raceway From the Existing Transformer To B504

A-2

Bldgs.

720, 728 Project Boundary

CUI

Maintain Stormwater Drainage Channel

Maintain Fire Hydrants

Project Boundary

Remove Sewer Main Line

Remove Stormwater Drainage Channel

Remove Sewer Service Line

Remove Stormwater Main Line

Remove Stormwater Main Line

A-3 Site Plan- Bldg. 720

Remove Sewer Manhole

Remove All Lighting

See Continuation of Site Plan on Sheet A-4

CUI

Remove Basketball Court

A-4

Bldg. 728

Project Boundary

Remove Water Service Lines North of Valve

Maintain Natural Gas Line

Protect & Maintain Overhead Electric Feeder Line

Maintain Communications Line

Remove and Disconnect Pad Transformer and Electric Service Line Including Underground Raceway and Pole Mounted Riser Cable with Cut Out Switches, Lightning arrester, Fittings and All Accessories

Remove Lighting and Service Line

CUI

Point of Electric Service Line Disconnection: Pole mounted Gang Operated Air Breaker Switch

A-5

Fac# 638

Project Boundary

Remove day tank

Remove Fuel Tank

Remove Pad Mounted Transformers

Protect & Maintain Underground Electric Lines

Protect & Maintain Overhead Electric Line

Protect & Maintain Overhead Electric Line

Install Fencing matching with the existing fence including fabric

Remove Fencing

CUI

Area to become Asphalt Pavement parking area per SOW 2.1.4.3; Surface layer will level with the existing asphalt pavement

Install curb and connect to the existing one with 1m-2m radious

Remove existing curb

Remove PMS

Protect & Maintain Electrical Lighting Pole

Protect & Maintain Street Lighting Poles (5 EA)

Make island using 1-2m radius to protect street lighting poles