This document is a Request for Proposal (RFP) for the demolition and disposal of multiple vacant facilities at Osan Air Base in South Korea. The key details are:
The principal features of the demolition work include: (1) Demolishing and disposing of buildings 504, 720, 728, and Facility 638, including all building elements, related infrastructure, and outdoor site elements; (2) Maintaining certain existing utilities and infrastructure within the project boundaries; (3) Converting the site of Facility 638 to an asphalt concrete parking lot; and (4) Segregating and disposing of materials, including scrap metal, in accordance with environmental regulations and the Osan AB Qualified Recycling Program. The contractor will be responsible for terminating, removing, and capping existing utilities, as well as addressing any contaminated soil encountered during demolition. The contractor must also implement stormwater best management practices at the demolition sites. The solicitation number is W90VN6-24-R-0016, and the contracting agency is the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN6-24-R-0016.pdf | ||
| Submittal Register.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-1 Site Plan- Bldg. 504 Project Boundary
Remove Sewer Service Line and Septic Tank
Remove Fuel Tank
Remove Electrical Meter
Remove Air Conditioners
Maintain Stormwater Main Line
Remove Water Valve and Service Line
CUI
Protect & Maintain existing Pad Mounted Transformer and Seal/Cap conduits at existing Pad Mounted Transformer After Electric Service Line removal
Remove Electric Service Line Including underground raceway From the Existing Transformer To B504
A-2
Bldgs.
720, 728 Project Boundary
CUI
Maintain Stormwater Drainage Channel
Maintain Fire Hydrants
Project Boundary
Remove Sewer Main Line
Remove Stormwater Drainage Channel
Remove Sewer Service Line
Remove Stormwater Main Line
Remove Stormwater Main Line
A-3 Site Plan- Bldg. 720
Remove Sewer Manhole
Remove All Lighting
See Continuation of Site Plan on Sheet A-4
CUI
Remove Basketball Court
A-4
Bldg. 728
Project Boundary
Remove Water Service Lines North of Valve
Maintain Natural Gas Line
Protect & Maintain Overhead Electric Feeder Line
Maintain Communications Line
Remove and Disconnect Pad Transformer and Electric Service Line Including Underground Raceway and Pole Mounted Riser Cable with Cut Out Switches, Lightning arrester, Fittings and All Accessories
Remove Lighting and Service Line
CUI
Point of Electric Service Line Disconnection: Pole mounted Gang Operated Air Breaker Switch
A-5
Fac# 638
Project Boundary
Remove day tank
Remove Fuel Tank
Remove Pad Mounted Transformers
Protect & Maintain Underground Electric Lines
Protect & Maintain Overhead Electric Line
Protect & Maintain Overhead Electric Line
Install Fencing matching with the existing fence including fabric
Remove Fencing
CUI
Area to become Asphalt Pavement parking area per SOW 2.1.4.3; Surface layer will level with the existing asphalt pavement
Install curb and connect to the existing one with 1m-2m radious
Remove existing curb
Remove PMS
Protect & Maintain Electrical Lighting Pole
Protect & Maintain Street Lighting Poles (5 EA)
Make island using 1-2m radius to protect street lighting poles
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
File details come from the government source that posted it. Updated .