W90VN6-23-R-0039.pdf

PDF 1 MB Posted

Attached to
Repair Roof of Multi Buildings, Osan AB (Osan IDIQ only)
Solicitation number
W90VN6-23-R-0039
Issued by

View the file

Other files

File Type Posted
CLIN 0002 Drawings.pdf PDF
CLIN 0002 Submittal Register.xls XLS spreadsheet
CLIN 0001 Drawings.pdf PDF
CLIN 0001 Submittal Register.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR LEAKY ROOF OF MULTI BLDGS, OSAN AB

THIS IS GENERAL REPAIR OF BUILDINGS AND EXTERIOR SITE OSAN IDIQ RFP FOR THE FOLLOWING CONTRACTORS ONLY;

CONTRACT NO.: W91QVN-19-D-0006, -0008, -0010.

OFFERORS MUST COMPLY WITH THE FOLLOWING:

A. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit clause in Section L for the schedule.

B. Submission of Proposals

(1) Proposal Packet: It shall be submitted by 1300 hours on the closing date of RFP via email.

(2) Pricing & Technical Proposal for each project

a. Price and Bidding Schedule w ith Sub-CLINs

b. Offer Breakdow n

c. Completion of Section K (Contractor's Tax Exemption Declaration)

C. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit a "No-Offer Letter" by the date and time specif ied in this solicitation.

MR. YI, CHAE YONG 315-757-6018

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

25-Apr-2023

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ Section F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________02 Jun 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO OSAN, UNIT #2039

APO AP 96278-2039

UNITED STATES

W90VN6

PAGE OF PAGES

1 OF

CODE W90VN6

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

411TH CSB, KOREA - RCO OSAN

POC: MR. YI, CHAE YONG

0503-357-6018

CHAEYONG.YI5.LN@ARMY.MIL

APO AP 96278-2039

KOREA, SOUTH

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: 315-757-6018 FAX:

W90VN623R0039 53

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W90VN623R0039

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Repair Leaky Roof of Exchange Snack

FFP

Bar Bldg#828, Osan AB. (SMYU 23-1055) Magnitude of the Requirement: the Estimated Price Range is between $100,000 and $250,000 FOB: Destination

PSC CD: Z1FD

NET AMT

0002 1 Job Repair Leaky Roof of Aircraft Engine

FFP

Test FAC Bldg#1766, Osan AB. (SMYU 22-1069) Magnitude of the Requirement: the Estimated Price Range is between $100,000 and $250,000.

Funds are not presently available for this contract.

PSC CD: Z1BZ

0003 2 Lot War Hazard

FFP

Estimated Cost for War Hazard Losses is Zero(0).

PSC CD: Z1BZ

BIDDING SCHEDULE (CLIN 0001)

BIDDING SCHEDULE

PROJECT NO: SMYU 23-1055

PROJECT DESCRIPTION: REPAIR LEAKY ROOF FOR EXCHANGE SNACK BAR B828

LOCATION: OSAN AB, ROK

ITEM NO. DESCRIPTION QTY U/T U/P AMOUNT

4001 AA Provide steel pipe scaffolding (Double) incl.

fabricating & dismantling

7,273 SF ₩ -

4001 AB Provide footholding scaffolding for ceiling work incl.

fabricating & dismantling

8,216 SF ₩ -

4001 AC Provide truck crane with bucket or lift car for high rise work (5 ton)

10 ED ₩ -

4003 AH Remove plywood roof sheathing or single ply roofing system

9,600 SF ₩ -

4003 AN Disposal for all construction debris & industrial waste to outside compound

184 CM ₩ -

4004 AP Repair water leaking exterior metal surface with fluid-applied waterproofing materials

800 SF ₩ -

4004 BJ 5/8" thk, 2'x2' acoustical ceiling tile 8,216 SF ₩ -

4004 BS Polystyrene/polyisocianurate board rigid insulation, 4-1/2" thk incl. roof liner & vapor barrier

9,600 SF ₩ -

4004 BU Met. flashing & counter/base flashing, galv. steel 990 SF ₩ -

4004 BZ Concrete splash block 2 EA ₩ -

4004 DY Surface preparation for metal surface using hand tools or power tools, SSPC-SP2 or SP3

2,204 SF ₩ -

4004 DZ Surface preparation for concrete, masonry, plaster, gypsum board & stucco surface

6,125 SF ₩ -

4004 EB Alkyd, 2-coats (MPI approved) 2,204 SF ₩ -

4004 EC Latex, 2-coats (MPI approved) 6,125 SF ₩ -

4004 EE Primer, 1-coat (MPI approved) 8,329 SF ₩ -

4004 FG Single-ply sheet water proofing system on metal or concrete surface (Thermoplastic-Poly-Olefin or Ethylene-Propylene-Diene-Monomer)

9,600 SF ₩ -

TOTAL AMOUNT (W) ₩ -

BIDDING SCHEDULE (CLIN 0002)

BIDDING SCHEDULE

PROJECT NO: SMYU 22-1069

DESCRIPTION: REPAIR LEAKY ROOF FOR AIRCRAFT ENGINE TEST FAC B1766

LOCATION: OSAN AB, ROK

ITEM NO. DESCRIPTION QTY U/T U/P AMOUNT

4001 AA Provide steel pipe scaffolding (Double) incl. fabricating & dismantling

7,925 SF ₩ -

4001 AC Provide truck crane with bucket or lift car for high rise work (5 ton)

5 ED ₩ -

4003 AG Remove gutter & downspout 264 SF ₩ -

4003 AH Remove plywood roof sheathing or single ply roofing system

342 SF ₩ -

4003 AN Disposal for all construction debris & industrial waste to outside compound

20 CM ₩ -

4004 AP Repair water leaking exterior metal surface with fluid-applied waterproofing materials

11,370 SF ₩ -

4004 BW 6"~8" wide #24 galv. sheet metal gutter incl. hanger

202 LF ₩ -

4004 BX 4"~6" dia #24 galv. sheet metal downspout incl. hanger

63 LF ₩ -

4004 BZ Concrete splash block 4 EA ₩ -

4004 DY Surface preparation for metal surface using hand tools or power tools, SSPC- SP2 or SP3

9,533 SF ₩ -

4004 EB Alkyd, 2-coats (MPI approved) 9,533 SF ₩ -

4004 EE Primer, 1-coat (MPI approved) 9,533 SF ₩ -

4012 AA [O/A Item] Roof Fall Protection System (MFG/Model:uniline/ roofsafe rail system or approved equal) IAW UFC 3-110-03, para 3-3.8

84 LF ₩ -

TOTAL AMOUNT (W) ₩ -

Section C - Descriptions and Specifications

CLIN 0001

PROJECT NUMBER: SMYU 23-1055

DESCRIPTION: REPAIR LEAKY ROOF FOR EXCHANGE SNACK BAR B828

STATEMENT OF WORK

1. GENERAL: The work to be performed for completion of this project shall be in general as described below and executed by the contractor.

1.1 Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed below and in accordance with the drawings, sketches and specifications.

1.2 Work by In-House Forces: N/A

1.3 Work by Troop labor: N/A

2. TECHNICAL SPECIFICATIONS: Above project shall comply with specifications in awarded original contract package and the attached Particular Specification “07 54 11 Thermoplastic Polyolefine Sheet Roofing (TPO)”.

3. SCOPE OF WORKS (SOW):

a. Architectural Works:

1. Provide double steel pipe scaffolding for temporary works.

2. Remove existing built-up roof system including roofing sheet, protection board, cant strip and rigid insulation over the existing roof deck (Remove and reinstall the existing walkway pads at the same place where they were).

3. Clean and prepare surface to apply TPO (Thermoplastic Polyolefin) roofing system by removing loose/flaking particles, grease, laitance, dust, dirt and other contaminants.

4. Install 4-1/2” poly-isocyanurate board rigid insulation with vapor barrier, cant strip and cricket as shown on the drawing (There shall be air space between the rigid insulation and other material to protect contraction and expansion problems).

5. Install TPO sheet membrane over the rigid insulation board by using hot air welded machine according to the standard mechanically attached application method in the attached Particular Specification.

6. Replace existing metal cap flashing over the parapet coping including wood nailer (if necessary) and sub-roof materials with new (Apply acrylic water proofing coating on the area that is vulnerable to leakage especially around the mechanical equipment and roof access hatch).

7. Clean up existing scupper/conductor head & downspout and install two new concrete splash blocks.

8. Perform surface preparation for paint/coating work according to O&MA specification (All surface coating/painting shall be applied by brush or roller. Using spray equipment is prohibited for minimization of air emissions unless otherwise specified or recommended by the paint manufacturer).

9. Apply paint/coating on the existing EIFS walls with MPI 10 (Primer) – MPI 10 (Intermediate) – MPI 10 (Topcoat).

10. Apply paint/coating on the existing metal surface such as steel door/frame, canopy, and steel pipe/conduit with MPI 79 (Primer) – MPI 94 (Intermediate) – MPI 94 (Topcoat). *Use epoxy-polyamide primer for PVDF (Polyvinylidene Fluoride) coated metal surfaces instead of MPI 79 to strengthen adhesion of intermediate & top coat.

For the metal canopies, paint them in the user’s favorite color and use MPI 9 (Alkyd- G6) for intermediate & topcoat.

11. Replace existing 2x2 acoustical ceiling tiles with new ones in the seating area and kitchen area of the building (acoustical ceiling tile area only).

12. Remove all construction debris originated from the project and clean up the job site.

13. Remove/reinstall existing mechanical and electrical equipment over the roof if necessary and any damages caused by this project shall be repaired or replaced to match existing condition to adjacent areas by the contractor.

4. KEY INFORMATION FOR CONSTRUCTION SCHEDULE:

Project Site Base & Airfield Area B828 Contract Type IDIQ General Repair of Buildings and Exterior

Site Period of Performance (PoP)

120 Days After NTP issued

Temporary Airfield Construction Waiver Required (TACW)

No If yes, TACW requires minimum 60 days to be approved

Risk Assessment (RA) Required

No If yes, RA requires minimum 60 days to be approved

Phasing Work Required No If yes, please see the section “5.

REMARKS”

Military Training Event Anticipated

Yes Minimum 14 days of Military Training Event anticipated during PoP

Restricted Area Escort Required

No

5. REMARKS:

5-1. Military Training Events are anticipated to occur during the construction period as indicated in Table above. During Training Event, contractor will not be allowed to access the project site. Contractor shall consider these conditions in their proposal. Contractors will be given 72hours notice of work stoppage without incurring penalty to the Government.

5-2. Phasing Plan: N/A

6. SECURITY REQUIRMENTS:

The training IWATCH/EAGLE EYES/AT Level I shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.

ALERTS: During military alerts or special operations, the contractor may not be authorized on base or in the work site. When the contractor is prohibited from access to the base or work site for one (1) day or less per month, no adjustment in the contract time shall be made.

When the contractor is prohibited access for more than one (1) day per month, adjustments shall be made in accordance with applicable clauses of the General Provisions.

BASE PASSES: The contractor shall be required to obtain base passes to Osan Air Base to perform the requirements of this contract. The contractor shall be responsible to submit a base pass request no later than five (5) calendar days after award of this contract. It should be noted that it can take up to 30 days or more to process base pass paperwork. It shall be the responsibility of the contractor to prepare the necessary base pass paperwork to include USFK Form 82-E, USFK Form 225EK-E, family history register, local register, etc. for each individual requiring access to Osan Air Base. The contractor shall also be authorized to receive vehicle passes for each of the contractor’s vehicles used in the performance of the requirements of this contract. It shall be the responsibility of the contractor to prepare the necessary paperwork to include USFK Form 195EK-E, vehicle registration, vehicle insurance, certificate of safety inspection and a copy of driver’s license for each vehicle requiring access to Osan Air Base. The contractor shall prepare a cover letter listing each individual, skill, escort privileges, vehicle type, vehicle registration number, etc. The contractor shall also provide the COR with two (2) copies of this request letter, with carbons, to include the top copy with original signatures. Escort privileges will be justified and limited to specific needs for contract completion and at the discretion and approval of the sponsor and requesting authorities identified in Block 13 and Section III of the USFK Form 82-E, Application for Installation/Base Access. The contractor shall not be authorized to perform any portion of the contract requirements until such time that the contractor has processed the necessary base pass paperwork for entry onto Osan Air Base. The COR shall not provide or be responsible to provide the contractor with escorts during performance of any part of this contract. All of the above documents shall be turned in to the COR for processing with the 51st Security Forces.

The contractor and all associated sub-contractors shall practice Operations Security. The contractor shall not talk about work outside of the work area nor discuss the work being performed on social media. Unless absolutely necessary to perform the duties stated in the contract, the contractor shall not take pictures of or inside sensitive locations as determined by the contracting officer representative. It shall be the responsibility of the contractor to safeguard all documents provided. Documents shall be stored away from view when not being used. Documents that are no longer needed shall be shredded in an approved government shredder.

7. ENVIRONMENTAL REQUIRMENTS:

Construction debris and litter from work areas within the construction limits of the project site shall be collected and placed in watertight dumpsters at least weekly regardless of whether the litter was generated by the Contractor, the public, or others. Collected litter and debris shall not be placed in or next to drain inlets, storm water drainage systems or watercourses.

Solid waste storage areas shall be located at least 15 m (50 ft.) from drainage facilities and watercourses and shall not be located in areas prone to flooding or ponding.

Place hazardous materials/waste containers in secondary containment. Container to store construction debris has to have water-proof and leak-proof lid.

The contractor shall submit the HAZMAT information (especially all paints/coating) and AF Form 3952, Chemical Hazardous Material Request Authorization along with a copy of Safety Data Sheet to obtain HAZMAT approval from BEE, Safety, and Environmental Office. All paint products should be lead free.

For welding and brazing: Perform activities indoors. Cover nearby drain inlets and sweep-up metal particulates after each event.

The Contractor shall report the metric tons for construction and demolition materials, including cost deposited in a landfill or incinerated, to Environmental Office thru COR.

Scrap metal, including metal structures, metal roofs, metal roofing part, metal railings, metal beams, copper pipes and tubing, and HVAC equipment (chillers and boilers etc.), shall be collected by the contractor for disposal and sale through the Osan AB Qualified Recycling Program (QRP) in accordance with DOD Instruction 4715.23, which requires the installation’s QRP to receive money through the sale of all installation recyclables. The Contractor shall appropriately segregate and place the scrap metal to the location that QRP manager designates on base. The scrap metal shall be segregated and stored by the contractor for sale through QRP. Reinforcing metal bar in the concrete stuff to be broken on the construction site shall be turned in QRP.

The contractor shall use lead free coatings and paints. In addition, all surface coating/painting shall be applied by brush or roller. Using spray equipment is prohibited for minimization of air emissions unless otherwise specified or recommended by the paint manufacturer.

All transformers and electrical equipment shall be properly removed and disposed of IAW USFK Reg 201-1, KEGS.

The Contractors are prohibited by 10 U.S.C. 2692 from storage, treatment, or disposal of any contractor owned hazardous waste on installation. The Contractors must get approval from HW Program Manager to store Hazardous Waste generated on-site in connection with a contract activity. HW storage will be on a temporary basis prior to disposal from Osan AB.

The Contractor shall ensure hazardous wastes are managed and transported IAW the KEGS and local requirements to a certified disposal facility.

The Contractor shall implement Best Management Practices (BMP) specified on Table 4-8 of EGS and paragraph E.7 of the Osan AB Storm Water Pollution Prevention Plan (SWPPP) for outdoor painting/de-painting activities. EGS and Osan SWPPP are available at CE Environmental Office, room #105, building 600, DSN 784-8974.

PARTICULAR SPECIFICATION

SECTION 07 54 11

THERMOPLASTIC POLYOLEFINE SHEET ROOFING (TPO)

PART 1 GENERAL

This specification covers the requirements for fully adhered, mechanically attached, and ballasted thermoplastic polyolefin (TPO) sheet roofing. TPO roofing system shall not be used in areas exposed to asphalt, coal-tar, grease, oil, solvents, vegetable or mineral oil and animal fat, and steam venting. An oil resistant coating may be used where the roofing will be exposed to petroleum, grease, oil and solvents. Roofs must be constructed to drain with a minimum slope ratio, rise to horizontal, of 1 to 48 (1/4 in. per ft).

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM C 29/C 29M Bulk Density (“Unit Weight”) and Voids in Aggregate

ASTM D 448 Sizes of Aggregate for Road and Bridge Construction

ASTM D 6878 Standard Specification for Thermoplastic Polyolefin Based Sheet Roofing

ASTM E 84 Standard Test Methods for Surface Burning Characteristics of Building Materials.

ASTM E 108 Standard Test Methods for Fire Tests of Roof Coverings

FACTORY MUTUAL ENGINEERING AND RESEARCH (FM)

FM 4470 Approval Standards for Class 1 Roof Covers

KOREAN INDUSTRIAL STANDARDS (KS)

KS M 3809 Thermal Insulation Material Made of Rigid Urethane Foam

KS F 4911 Waterproofing sheets of synthetic polymer

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Roofing system; G

Drawings showing size of sheets, position of sheets and splices, flashing details, fastening patterns where applicable for insulation and membrane sheets, and expansion joint details.

SD-03 Product Data

Materials; G

Membrane (TPO Sheets), Bonding adhesive, Fasteners, Roof insulation (Poly-isocianurate board), Accessories

SD-06 Test Reports: G

Report signed by authorized official of a certified independent testing laboratory verifying conformance of properties as per ASTM D 6878, KS M 3809, KS F 4911, and class A fire rating as per ASTM E 108, FM 4470, or UL 790.

SD-07 Certificates

Applicator's Qualifications; G

A copy of approved applicator letter and/or certificate as issued by the manufacturer.

SD-08 Manufacturer's Instructions

Application instructions; G

Manufacturer’s instructions for preparing and installing the membrane, flashings, seams, insulation, nailers and other accessories.

1.3 GENERAL REQUIREMENTS

TPO membrane roofing shall be fully adhered, mechanically fastened and ballasted to the roof surface indicated. Roofing membrane sheet widths shall be consistent with membrane attachment methods and wind uplift requirements, and shall be as large as practical to minimize joints. Membrane shall be free of defects and foreign material. Flashing work shall be coordinated to permit continuous roof-surfacing operations. Applied insulation shall be weatherproofed by the membrane on the same day.

1.3.1 Delivery and Storage

Materials shall be delivered to the job site in the manufacture’s original, unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents.

Materials other than ballast shall be stored in clean, dry areas. Storage temperature shall be as specified by the manufacturer. Materials other than ballast stored on the roof shall not exceed one day’s supply and shall be distributed so as not to exceed the roof live load capacity. Ballast shall be stored uncovered, shall not be in contact with sod or earth, and shall not be stored on the roof.

1.3.2 Fire Resistance

The completed roof covering system shall be Class A (Class I) rated in accordance with ASTM E108, FM 4470, or UL 790.

1.3.3 Wind Uplift Requirements

Fully adhered and mechanically attached roofing system shall be in accordance with FM 4470 class 1-60, 75, 90, 135, 165 RC rating. Ratings from other independent laboratories may be substituted provided that the tests, requirements and ratings are documented to be equivalent, to the satisfaction of the Contracting Officer.

1.3.4 Roof Membrane Manufacturer Warranty

Manufacturer’s standard warranty for entire roofing system shall be provided for not less than 20 years from acceptance of the work. Warranty shall state that manufacturers shall repair or replace defective materials if the roofing system leaks or allows the insulation beneath the membrane to become wet during the period of the warranty.

1.3.5 Roof System Installer Warranty

The roof system installer shall warrant for a period of not less than 2 years that the roof system, as installed, is free defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. The warranty shall run directly to the Government. Correction of defective workmanship and replacement of damaged or affected materials shall be the responsibility of the roof system installer.

PART 2 PRODUCTS

2.1 BONDING ADHESIVE

Low volatile organic compound (VOC) or synthetic rubber adhesive as supplied by roof membrane manufacturer and recommended by the manufacturer’s printed data for bonding TPO membrane materials to insulation, wood, metal, concrete or other substrate materials.

Bonding adhesive shall not be used to bond membrane materials to each other.

2.2 FASTENERS

Fasteners for sheet-metal flashing shall be corrosion resistant steel annular type nails or screws.

Fasteners for anchoring the roofing membrane shall be coated, corrosion resistant one as approved by the membrane manufacturer and identical to those used to obtain the wind uplift rating.

2.3 MEMBRANE (TPO SHEET)

TPO Sheet shall conform to ASTM D6878 or KS F 4911, 1.52 mm (0.060 inch-60 mils) minimum thickness, and dark brown color.

2.4 PRE-MANUFACTURED ACCESSORIES

Pre-manufactured accessories shall be manufacturer’s standard for intended purpose, compatible with the membrane roof system and approved for use by the roof membrane manufacturer.

2.5 HOT AIR SPLICE

All field splices will be hot air welded using an automatic hot air welding machine or hot air hand welder in accordance with the manufacturer’s specification. At all splice intersections, roll the seams with a silicone roller prior to membrane seam cooling. All intersections shall be overlaid with non-reinforced flashing. Pressure sensitive pre-fabricated parts should be used whenever possible (walkways, pipe flashings, curb wraps, pressure-sensitive RUSS strips for perimeter fastening).

2.6 ROOF INSULATION BELOW TPO SHEET

Insulation system and facer material shall be compatible with membrane application specified and as approved by the roof membrane manufacturer. Insulation shall be polyisocyanurate to meet ASTM E84 Class A and KS M 3809 Type 1, Class 2 or Type 2, Class 2. A smoke developed index shall be no higher than 50 when tested in accordance with ASTM E 84.

2.7 BALLAST

Ballast should be concrete pavers, smooth round stone, screened gravel, or crushed rock, with gradations conforming to ASTM D 448, sizes 2 and 4, with the additional requirement that particles passing the 9.5 mm (3/8 inch) sieve shall not exceed 2 percent. A protective mat shall be required if the only available ballast is crushed rock. Crushed rock shall be used over a protective layer of extruded polystyrene foam insulation at least 9 mm (3/8 inch) thick and a filter fabric at least 900 gm/ sq. meter (3 oz/sq. ft.), placed between the ballast and the membrane. Ballast laid directly on the membrane shall be pavers or rounded-edge aggregate, and must not break during freeze-thaw cycles. Unit weight of stone ballast shall be no less than 960 kg/cu. m (60 lbs/cu. ft.) when determined in accordance with ASTM C 29/C 29M. Concrete pavers shall be precast air-entrained concrete, minimum 38 mm (1-1/2 inches) thick, having 21 MPa (3000 psi) minimum compressive strength. Pavers other than walkways shall include drainage channels on their lower surfaces, or shall rest on membrane pads extending at least 25 mm (1 inch) beyond the paver edges.

PART 3 EXECUTIONS

3.1 ENVIRONMENTAL CONDITIONS

Membrane shall not be installed in high wind, inclement weather or when there is visible ice, frost or moisture on the deck, insulation or membrane. Membrane shall not be installed when air temperature is below minimum specified by the membrane manufacturer.

3.2 PREPARATION

The substrate of any bay or section of the building shall be complete and suitable for insulation and membrane installation before roofing is begun. Surfaces against which membrane is applied shall be smooth, clean, and free from dirt, water, dew, oil, grease, sharp edges and construction debris; all joints over 6 mm (1/4 inch) wide shall be sealed; joints over 13 mm (1/2 inch) between insulation boards shall be filled with the same insulation. Wood nailers shall comply with Section 06 10 00 ROUGH CARPENTRY.

3.3 INSTALLATION

Installation shall comply with the manufacturer's approved instructions, except as otherwise specified.

3.3.1 Flashing

Edges of membrane, projections through the roof and changes in roof planes shall be flashed.

Flashing material shall be extended and sealed a minimum of 75 mm (3 inches) on each side of the fasteners which attach the membrane to nailers. The installed flashing shall be fastened at the top of the flashing a maximum of 300 mm (12 inches) on center under metal counter-flashing or cap.

3.3.2 Expansion Joints

Expansion joints shall be covered using prefabricated covers or elastomeric flashing in accordance with the manufacturer's recommendations.

3.3.3 Membrane Installation

Membrane shall be applied in accordance with the manufacturer's instructions and the following requirements. Layout membrane and side lap adjoining sheets in accordance with membrane manufacturer’s installation instruction. Allow for sufficient membrane to form proper membrane terminations. Remove dusting agents and dirt from membrane and substrate areas where bonding adhesive are to be applied. Apply specified adhesive evenly and continuously to substrate at rates recommended by the roof membrane manufacturer’s application instructions. Do not apply bonding adhesive to surfaces of membrane in seam or lap areas. Allow adhesive to flash off or dry to consistency prescribed by manufacturer before adhering sheets to the substrate, Roll each sheet into adhesive slowly and evenly to avoid wrinkles; broom or roll the membrane to remove air pockets and fish mouths and to ensure full, continuous bonding of sheet to substrate. Form field lap splices or seams as specified.

Allow the adhesive to dry until it is tacky but will not string or stick to a dry finger touch.

3.3.4 Lap Splices

Weathered Membranes Cleaner may be used to remove construction dirt and prepare the TPO membrane splice area prior to welding. Hot Air weld the Sure-Weld membrane using and Automatic Hot Air Welding Machine or Hot Air Hand Welder in accordance with the manufacturer’s specifications. At all splice intersections, roll the seam with a silicone roller to ensure a continuous hot air welded seam. When using 60 mils thick membranes, all splice intersections shall be overlaid with Sure-Weld non-reinforced flashing.

3.3.5 Cutoffs

Cutoffs shall be installed if work day is ended or interrupted by bad weather before roof section is complete. The insulation line shall be straightened using loose-laid cut insulation and the membrane shall be sealed to the roof deck. Flutes in metal decking shall be sealed off along the cutoff edge.

Membrane shall be pulled free or cut to expose the insulation when resuming work, and cut insulation sheets used for fill-in shall be removed as necessary to maintain the staggered pattern.

3.3.6 Installation of Walkways

Install walkways at roof access points and where otherwise indicated for traffic areas and for access to mechanical equipment, in accordance with the roof membrane manufacturer’s instructions. Provide minimum 150mm (6 inch) separation between adjacent walkways to accommodate drainage.

3.4 BALLAST

When ballast is required, ballast shall be applied as the membrane is installed to prevent wind uplift, except that seams and terminations shall be left uncovered until completion and inspection. Membrane shall be protected from mechanical damage from wheeled equipment during ballast application. Minimum ballast weight shall not be less than required by required by RP-4, or indicated. Ballast shall be spread as indicated or as recommended by the manufacturer for the anticipated wind conditions. Unless otherwise specified, size 2 ballast shall be spread at the rate of 620 to 720 Pa (13 to 15 psf.) and size 4 ballast shall be applied at the rate of 480 to 575 Pa (10 to 12 psf.)

3.5 PROTECTION OF FINISHED ROOFING

The roofing membrane shall be protected from damage by other trades. After completion of work by other trades, the protection shall be removed and the roof shall be inspected. Any damage shall be repaired in accordance with the recommendations of the roofing manufacturer.

3.6 INSTRUCTIONS TO GOVERNMENT PERSONNEL

Furnish written and verbal instructions on proper maintenance procedures to designated Government personnel. Prepare and submit written instructions in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Furnish instructions by a competent representative of the roof membrane manufacturer and include a minimum of 4 hours on maintenance and emergency repair of the membrane. Include a demonstration of membrane repair, and give sources of required special tools. Furnish information on safety requirements during maintenance and emergency repair operations. Include copies of Material Safety Data Sheets for maintenance/repair materials.

3.7 INFORMATION CARD

For each roof, furnish one paper copy & one digital copy (.pdf – text searchable) of an information card for facility records and a photoengraved 1 mm (0.032) inch thick aluminum card for exterior display. Paper and aluminum copies of card must be 215 mm by 275 mm (8- 1/2 by 11 inches) minimum. Information card must identify facility name and number; location;

contract number; approximate roof area; detailed roof system description, including deck type, membrane, number of plies, method of application, manufacturer, insulation and cover board system and thickness; presence of tapered insulation for primary drainage, presenceof vapor retarder; date of completion; installing contractor identification and contact information;

membrane manufacturer warranty expiration, warranty reference number, and contact information. Install aluminum card at roof top or access location as directed by the Contracting Officer and provide paper and digital copies to the Contracting Officer.

CLIN 0002

PROJECT NUMBER: SMYU 22-1069

DESCRIPTION: REPAIR LEAKY ROOF FOR AIRCRAFT ENGINE TEST FAC B1766

STATEMENT OF WORK

1. GENERAL: The work to be performed for completion of this project shall be in general as described below and executed by the contractor.

1.1 Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed below and in accordance with the drawings, sketches and specifications.

1.4 Work by In-House Forces: N/A

1.5 Work by Troop labor: N/A

2. TECHNICAL SPECIFICATIONS: Above project shall comply with specifications in awarded original contract package and attached particular specification “07 14 10 Acrylic Fluid-Applied waterproofing”.

3. SCOPE OF WORKS (SOW):

b. Architectural Works:

14. Provide double steel pipe scaffolding for temporary works.

15. Repair/patch/clean the existing deteriorated/damaged fasteners, protected metal

(PTML) roof panel before applying new water proofing coating system.

16. Remove all scale, dirt, any other contaminants and apply metal primer recommended by manufacturer to all entire PTML roof to prepare existing surfaces for applying acrylic fluid-applied water proofing coating system.

17. Apply one coat of base coat to the substrate especially on the vertical seams, horizontal laps, roof penetrations, joints, and exposed mechanical fasteners.

18. Lay out fabrics into the wet base coat and apply a second coat of base coat immediately applied over the top to saturate the fabrics fully (The base coat shall only be applied by manufacture’s recommended/approved tools such as brushes -unapproved rolling and/or spraying are strictly prohibited).

19. Apply 2 coats of finish coat entirely according to the manufacture’s standard procedure of the acrylic fluid-applied water proofing coating system.

20. Replace existing rain gutters and downspouts with new ones including concrete splash blocks.

21. Install roof fall protection system on the existing PTML roof as shown on the drawing.

(*MFG/Model#: uniline/RoofSafe Cable Fall Protection System or approved equal)

22. Apply paint/coating to the existing metal surface such as walls, steel door/frame, cylindrical steel structures, steel outrigger frames/braces at front side, steel pipe/conduit and etc… with MPI 79 (Primer) – MPI 94 (Intermediate) – MPI 94 (Topcoat). *Use epoxy-polyamide primer for PVDF (Polyvinylidene Fluoride) coated metal surfaces instead of MPI 79 to strengthen adhesion of intermediate & top coat.

23. Remove the existing wooden canopy located on the east side of the building including barbeque pit next to the canopy.

24. Remove all construction debris originated from the project and clean up the job site.

25. The contractor shall be responsible to repair all damages to existing areas caused by the project and to match condition to adjacent areas.

4. KEY INFORMATION FOR CONSTRUCTION SCHEDULE:

Project Site Airfield Area B1766 Contract Type IDIQ General Repair of Buildings and Exterior

Site

Period of Performance (PoP)

60 Days After NTP issued

Temporary Airfield Construction Waiver Required (TACW)

Yes If yes, TACW requires minimum 60 days to be approved

Risk Assessment (RA) Required

Yes If yes, RA requires minimum 60 days to be approved

Phasing Work Required No If yes, please see the section “5.

REMARKS”

Military Training Event Anticipated

Yes Minimum 7 days of Military Training Event anticipated during PoP

Restricted Area Escort Required

Yes The project will be performed in restricted area called ‘Charlie Diamond’.

5. REMARKS:

5-1. Military Training Events are anticipated to occur during the construction period as indicated in Table above. During Training Event, contractor will not be allowed to access the project site. Contractor shall consider these conditions in their proposal. Contractors will be given 72hours notice of work stoppage without incurring penalty to the Government.

5-2. Phasing Plan: N/A

6. SECURITY REQUIRMENTS:

The training IWATCH/EAGLE EYES/AT Level I shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.

ALERTS: During military alerts or special operations, the contractor may not be authorized on base or in the work site. When the contractor is prohibited from access to the base or work site for one (1) day or less per month, no adjustment in the contract time shall be made.

When the contractor is prohibited access for more than one (1) day per month, adjustments shall be made in accordance with applicable clauses of the General Provisions.

BASE PASSES: The contractor shall be required to obtain base passes to Osan Air Base to perform the requirements of this contract. The contractor shall be responsible to submit a base pass request no later than five (5) calendar days after award of this contract. It should be noted that it can take up to 30 days or more to process base pass paperwork. It shall be the responsibility of the contractor to prepare the necessary base pass paperwork to include USFK Form 82-E, USFK Form 225EK-E, family history register, local register, etc. for each individual requiring access to Osan Air Base. The contractor shall also be authorized to receive vehicle passes for each of the contractor’s vehicles used in the performance of the requirements of this contract. It shall be the responsibility of the contractor to prepare the necessary paperwork to include USFK Form 195EK-E, vehicle registration, vehicle insurance, certificate of safety inspection and a copy of driver’s license for each vehicle requiring access to Osan Air Base. The contractor shall prepare a cover letter listing each individual, skill, escort privileges, vehicle type, vehicle registration number, etc. The contractor shall also provide the COR with two (2) copies of this request letter, with carbons, to include the top copy with original signatures. Escort privileges will be justified and limited to specific needs for contract completion and at the discretion and approval of the sponsor and requesting authorities identified in Block 13 and Section III of the USFK Form 82-E, Application for Installation/Base Access. The contractor shall not be authorized to perform any portion of the contract requirements until such time that the contractor has processed the necessary base pass paperwork for entry onto Osan Air Base. The COR shall not provide or be responsible to provide the contractor with escorts during performance of any part of this contract. All of the above documents shall be turned in to the COR for processing with the 51st Security Forces.

The contractor and all associated sub-contractors shall practice Operations Security. The contractor shall not talk about work outside of the work area nor discuss the work being performed on social media. Unless absolutely necessary to perform the duties stated in the contract, the contractor shall not take pictures of or inside sensitive locations as determined by the contracting officer representative. It shall be the responsibility of the contractor to safeguard all documents provided. Documents shall be stored away from view when not being used. Documents that are no longer needed shall be shredded in an approved government shredder.

7. ENVIRONMENTAL REQUIRMENTS:

Construction debris and litter from work areas within the construction limits of the project site shall be collected and placed in watertight dumpsters at least weekly regardless of whether the litter was generated by the Contractor, the public, or others. Collected litter and debris shall not be placed in or next to drain inlets, storm water drainage systems or watercourses.

Solid waste storage areas shall be located at least 15 m (50 ft.) from drainage facilities and watercourses and shall not be located in areas prone to flooding or ponding.

Place hazardous materials/waste containers in secondary containment. Container to store construction debris has to have water-proof and leak-proof lid.

The contractor shall submit the HAZMAT information (especially all paints/coating) and AF Form 3952 IAW AFMAN 32-7002, Chemical Hazardous Material Request Authorization along with a copy of Safety Data Sheet to obtain HAZMAT approval from BEE, Safety, and Environmental Office. All paint products should be lead free.

For welding and brazing: Perform activities indoors. Cover nearby drain inlets and sweep-up metal particulates after each event.

The Contractor shall report the metric tons for construction and demolition materials, including cost deposited in a landfill or incinerated, to Environmental Office thru COR.

Scrap metal, including metal structures, metal roofs, metal roofing part, metal railings, metal beams, copper pipes and tubing, and HVAC equipment (chillers and boilers etc.), shall be collected by the contractor for disposal and sale through the Osan AB Qualified Recycling Program (QRP) in accordance with DOD Instruction 4715.23, which requires the installation’s QRP to receive money through the sale of all installation recyclables. The Contractor shall appropriately segregate and place the scrap metal to the location that QRP manager designates on base. The scrap metal shall be segregated and stored by the contractor for sale through QRP. Reinforcing metal bar in the concrete stuff to be broken on the construction site shall be turned in QRP.

The contractor shall use lead free coatings and paints. In addition, all surface coating/painting shall be applied by brush or roller. Using spray equipment is prohibited for minimization of air emissions unless otherwise specified or recommended by the paint manufacturer.

All transformers and electrical equipment shall be properly removed and disposed of IAW USFK Reg 201-1, KEGS.

The Contractors are prohibited by 10 U.S.C. 2692 from storage, treatment, or disposal of any contractor owned hazardous waste on installation. The Contractors must get approval from HW Program Manager to store Hazardous Waste generated on-site in connection with a contract activity. HW storage will be on a temporary basis prior to disposal from Osan AB.

The Contractor shall ensure hazardous wastes are managed and transported IAW the KEGS and local requirements to a certified disposal facility.

The Contractor shall implement Best Management Practices (BMP) specified on Table 4-8 of EGS and paragraph E.7 of the Osan AB Storm Water Pollution Prevention Plan (SWPPP) for outdoor painting/de-painting activities. EGS and Osan SWPPP are available at CE Environmental Office, room #105, building 600, DSN 784-8974.

PARTICULAR SPECIFICATION

SECTION 07 14 10

ACRYLIC FLUID-APPLIED WATERPROOFING

PART 1 GENERAL

This specification covers a liquid-applied water-dispersed 100 percent acrylic elastomeric latex coating used for roof waterproofing. This specification also covers a water-repellent coating applied to concrete or masonry wall surfaces.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM B 117 Standard Practice for Operating Salt Spray (Fog) Apparatus

ASTM C 794 Standard Test Method for Adhesion-in-Peel of Elastomeric Joint Sealants

ASTM D 471 Standard Test Method for Rubber Property - Effect of Liquids E1-1999

ASTM D 522 Rev A Standard Test Method for Mandrel Bend Test of Attached Organic Coatings

ASTM D 523 Standard Test Method for Specular Gloss

ASTM D 562 Standard Test Method for Consistency of Paints Measuring Krebs Unit (KU) Viscosity Using a Stormer-Type Viscometer

ASTM D 624 Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomer

ASTM D 722 Standard Test Method for Grease Resistance of Paper

ASTM D 903 Standard Test Method for Peel or Stripping Strength of Adhesive Bonds

ASTM D 1475 Standard Test Method for Density of Liquid Coatings, Inks, and Related Products

ASTM D 1640 Standard Test Method for Drying, Curing, or Film Formation of Organic Coatings at Room Temperature

ASTM D 1644 Standard Test Method for Nonvolatile Content of Varnishes

ASTM D 1653 Standard Test Method for Water Vapor Transmission of Organic Coated Films

E1-1999 R

ASTM D 1712 Standard Practice for Resistance of Plastics to Sulfide Staining

ASTM D 1729 Standard Practice for Visual Appraisal of Colors and Color Differences of Diffusely-Illuminated Opaque Materials

ASTM D 2196 Standard Test Methods for Rheological Properties of Non-Newtonian Materials by Rotational (Brookfield) Viscometer

ASTM D 2244 Standard Test Method for Calculation of Color Differences from Instrumentally Measured Color Coordinates

ASTM D 2370 Standard Test Method for Tensile Properties of Organic Coatings

ASTM D 2697 Standard Test Method for Volume Nonvolatile Matter in Clear of Pigmented Coatings R

ASTM D 3359 Standard Test Method for Measuring Adhesion by Tape Test

ASTM D 3776 Standard Test Method for Mass Per Unit Area (Weight) of Fabric

ASTM D 3786 Hydraulic Bursting Strength of Knitted Goods

ASTM D 4214 Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films

ASTM D 4798 Standard Test Method for Accelerated Weathering Test Conditions and Procedures for Bitumen Materials (Xenon-Arc Method)

ASTM D 5035 Standard Test Method for Breaking Force and Elongation of Textile Fabrics (Strip Method)

ASTM D 5201 Standard Practice for Calculating Formulation Physical Constants of Paints and Coatings

ASTM D 5733 Standard Test Method for Tearing Strength of Nonwoven Fabrics by the Trapezoid Procedure

ASTM D 6083 Standard Specification for Liquid Applied Acrylic Coating Used in Roofing

ASTM E 96 Standard Test Method for Water Vapor Transmission of Materials

ASTM E 108 Standard Test Methods for Fire Tests of Roof Coverings

ASTM E 514 Standard Test Method for Water Penetration and Leakage Through Masonry.

ASTM G 7 Standard Practice for Atmospheric Environmental Exposure Testing of Nonmetallic Materials

ASTM G 21 Standard Practice for Determining Resistance of Synthetic Polymeric Materials to Fungi

ASTM G 154 Standard Practice for Operating Florescent Light Apparatus for UV Exposure of Nonmetallic Materials

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .