CLIN 0002 Submittal Register.xls
XLS spreadsheet 63 KB Posted
- Solicitation number
- W90VN6-23-R-0039
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLIN 0002 Drawings.pdf | ||
| W90VN6-23-R-0039.pdf | ||
| CLIN 0001 Drawings.pdf | ||
| CLIN 0001 Submittal Register.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | SMYU 22-1069 REPAIR LEAKY ROOF FOR AIRCRAFT ENGINE TEST FAC B1766 | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | ||||||||||||||||||||
| LOCATION: | ||||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Initial Project Schedule | 3.4.2 | G | ||||||||||||||
| 2 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Periodic Schedule Updates | 3.4.3 | G | ||||||||||||||
| 3 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Schedule Status Report | 3.1.2 | |||||||||||||||
| 4 | 01 33 00 | 01 | Preconstruction Submittals | Submittal register | 1.8 | G | ||||||||||||||
| 5 | 01 35 26 | 01 | Preconstruction Submittals | SAFETY PLAN /ACCIDENT PREVENTION PLAN (APP) | 1.6 | G | ||||||||||||||
| 6 | 01 35 26 | 01 | Preconstruction Submittals | Activity Hazard Analysis (AHA) | 1.7 | G | ||||||||||||||
| 7 | 01 35 26 | 01 | Preconstruction Submittals | Crane Critical Lift Plan | 1.6.1 | |||||||||||||||
| 8 | 01 35 26 | 01 | Preconstruction Submittals | Crane Operators | 1.5.1.2 | |||||||||||||||
| 9 | 01 35 26 | 06 | Test Reports | Notifications and Reports | 1.11 | |||||||||||||||
| 10 | 01 35 26 | 06 | Test Reports | Accident Reports | 1.11.2 | |||||||||||||||
| 11 | 01 35 26 | 06 | Test Reports | Crane Reports | 1.11.3 | |||||||||||||||
| 12 | 01 35 26 | 06 | Test Reports | Certificate of Compliance | 1.11.4 | |||||||||||||||
| 13 | 01 35 26 | 07 | Certificates | Confined Space Entry Permit | 1.8 | |||||||||||||||
| 14 | 01 35 26 | 07 | Certificates | Hot work permit | 1.8 | |||||||||||||||
| 15 | 01 35 26 | 07 | Certificates | License Certificates | 1.13 | |||||||||||||||
| 16 | 01 45 00.00 10 | 01 | Preconstruction Submittals | Quality Control Plan | 3.2 | G | ||||||||||||||
| 17 | 01 57 20.00 10 | 01 | Preconstruction Submittals | Environmental Protection Plan | 1.7 | |||||||||||||||
| 18 | 01 58 00 | 02 | Shop Drawings | Construction Project Sign | 1.2.1 | |||||||||||||||
| 19 | 01 78 00 | 03 | Product Data | As-Built Record of Equipment and Materials | 1.3.2 | |||||||||||||||
| 20 | 01 78 00 | 03 | Product Data | Equipment-in-Place List | 1.3.4 | |||||||||||||||
| 21 | 01 78 00 | 03 | Product Data | Warranty Management Plan | 1.6.1 | |||||||||||||||
| 22 | 01 78 00 | 03 | Product Data | Warranty Tags | 1.6.5 | |||||||||||||||
| 23 | 01 78 00 | 03 | Product Data | Spare Parts Data | 1.4 | |||||||||||||||
| 24 | 01 78 00 | 08 | Manufacturer’s Instructions | Preventative Maintenance | 1.5 | |||||||||||||||
| 25 | 01 78 00 | 08 | Manufacturer’s Instructions | Condition Monitoring (Predictive Testing) | 1.5 | |||||||||||||||
| 26 | 01 78 00 | 08 | Manufacturer’s Instructions | Inspection | 1.5 | |||||||||||||||
| 27 | 01 78 00 | 08 | Manufacturer’s Instructions | Instructions | 1.6.1 | |||||||||||||||
| 28 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 1.7 | |||||||||||||||
| 29 | 01 78 00 | 11 | Closeout Submittals | Record Drawings | 1.3.1 | G | ||||||||||||||
| 30 | 01 78 00 | 11 | Closeout Submittals | Interim Form DD1354 | 1.9 | G | ||||||||||||||
| 31 | 01 78 00 | 11 | Closeout Submittals | Checklist for Form DD1354 | 1.9 | G | ||||||||||||||
| 32 | 07 14 10 | 03 | Product Data | Technical Data Sheet, Coating System, Application | 2.1 | G | ||||||||||||||
| 33 | 07 14 10 | 06 | Test Reports | ASTM D 6083 & ASTM E 108 or UL790 | 2.1 | G | ||||||||||||||
| 34 | 07 14 10 | 07 | Certificates | Applicator's Qualification | 3.4 | G | ||||||||||||||
| 35 | 07 61 14.00 20 | 03 | Product Data | Fall protection system | 2.7 | G | ||||||||||||||
| 36 | 09 90 00 | 03 | Product Data | Coating / Manufacturer's Technical Data Sheets | 2.1 | G | ||||||||||||||
| 37 | 09 90 00 | 06 | Test Reports | MPI Test Report | 1.4.1.2 | G | ||||||||||||||
| 38 | 09 90 00 | 08 | Manufacturer’s Instructions | Manufacturer's Material Safety Data Sheets | 1.7.2 | G |
&RPage &P of &N
File details come from the government source that posted it. Updated .