This is a Questions and Answers document containing 58 questions and responses related to solicitation W909MY-25-B-0001 for Power Distribution Illumination Systems, Electrical (PDISE) components and accessories. The majority of questions seek clarification on incorrect National Stock Numbers (NSNs) listed in the solicitation, with the government confirming the correct NSNs for various components including electrical feeder centers, cable assemblies, and distribution centers.
Key clarifications include: the ship-to destination is DLA Distribution Center in Tobyhanna, PA; inspection and acceptance is at origin rather than destination; 60-amp cables are not required for this procurement; the First Article Testing period is 12 months total with 6 months for fabrication and 6 months for testing; configuration management requirements are in place despite this being a build-to-print effort; and an Economic Price Adjustment clause will be added to address potential tariff impacts. Technical Data Package (TDP) questions revealed several drawing revision discrepancies that were clarified by the government. The file provides detailed corrections to numerous part numbers and specifications but does not modify the core requirements of the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W909MY25B0001 AMD 0003.pdf | ||
| W909MY25B0001 AMD 0004.pdf | ||
| W909MY-25-B-0001 IFB rollup.pdf | ||
| W909MY-25-B-0001 AMD 0002 unlocked.pdf | ||
| B08 EPA Clause for Section H.docx | DOCX document | |
| W909MY-25-B-0001 AMD 0001.pdf | ||
| 13230E7022F001.pdf | ||
| PDISE IFB Attachments.zip | ZIP file | |
| W909MY-25-B-0001 IFB signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions
| Item # | Page / Section Number | Description | Question /Recommendation | Government Response |
| Solicitation | ||||
| 1 | Page 2 / Section A / Number 5 | Optional Ordering Period | One 4 Year Optional Ordering Period: 366 – 1461 (Days After Award (DAA)) – this appears to be a three-year period, not four years: | |
| 1,461 DAA |
-366 DAA
1095 Days / 365 Days per year = 3 years
| Please clarify. | The option year is One - 4 year Optional Ordering Period: 366-1825 (Days After Award (DAA)). Please see the Invitation for Bid (IFB) | ||||
| 2 | Page 2 / Section A / Number 8 | "SHIP TO" Location | Section J, Attachment 0001. For planning purposes, the delivery location should be Tobyhanna Army Depot, PA 18466. This statement conflicts with the SHIP TO locations detailed in Section B which universally specify ABERDEEN TEST CENTER as the address for product deliveries. If the contractor is expected to pay the freight for product deliveries (FOB POINT: Destination), understanding the SHIP TO location will be important to our bidding process. Section F of the SOW specifies Tobyhanna Army Depot. Please clarify. | The ship to destination is DLA Distribution Center, Tobyhanna, PA 18466-5059 ( DoDAAC W25G1W). | |
| 3 | Pages 5 through 49 / Section B / all items | Inspection and Acceptance | All items 0001 through A015 show INSPECTION: Destination ACCEPTANCE: Destination. Is this correct? In this contractor's experience, Inspection and acceptance take place at "Origin" for PDISE and similar deliverables. Please clarify. | The Inspection and Acceptance is Origin. | |
| 4 | Page 7 / Section B / Item 0005 | NSN# incorrect | The NSN # for M200 Electrical Feeder Center Assebmly is 6150-01-598-5455. The DRAFT lists the Drawing # 13229E6300 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-598-5455 | |
| 5 | Page 8 / Section B / Item 0006 | NSN# incorrect | The NSN # for M100 Electrical Feeder Center Assebmly is 6150-01-598-5282. The DRAFT lists the Drawing # 13229E6325 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-598-5282 | |
| 6 | Page 9 / Section B / Item 0007 | NSN# incorrect | The NSN # for M40 Electrical Distribution Center Assebmly is 6150-01-598-4796. The DRAFT lists the Drawing # 13229E6345 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-598-4796 | |
| 7 | Page 9 / Section B / Item 0008 | NSN# incorrect | The NSN # for M46 Container, Storage, Utility is 8145-01-568-4834. The DRAFT lists the Drawing # 13229E6362 as the NSN. Please clarify. | Confirmed: NSN is 8145-01-568-4834 | |
| 8 | Page 10 / Section B / Item 0009 | NSN# incorrect | The NSN # for Cable Assembly GRP PC, 200 Amp/Phase is 6150-01-247-4768. The DRAFT lists the Drawing # 13226E7021 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4768 | |
| 9 | Page 10 / Section B / Item 0010 | NSN# incorrect | The NSN # for Cable Assembly GRP PC, 100 Amp/Phase is 6150-01-265-6300. The DRAFT lists the Drawing # 13226E7020 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-265-6300 | |
| 10 | Page 11 / Section B / Item 0011 | NSN# incorrect | The NSN # for Cable Assembly GRP PC, 40 Amp/Phase is 6150-01-265-6301. The DRAFT lists the Drawing # 13226E7019 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-265-6301 | |
| 11 | Page 12 / Section B / Item 0012 | 60Amp Cable Required? | Both M60 Electrical Distribution System, and M60 Electrical Distribution Assembly are not among the top-level items being solicited, yet this 60Amp cable assembly is required? Please confirm. | 60A cable not required for this procurement | |
| 12 | Page 12 / Section B / Item 0012 | NSN# incorrect | The NSN # for Cable Assembly GRP PC, 60 Amp/Phase is 6150-01-247-4778. The DRAFT lists the Drawing # 13226E7018 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4778, - Cable not required for this procurement | |
| 13 | Page 12 / Section B / Item 0013 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 200 Amp/Phase, 25-ft is 6150-01-247-4782. The DRAFT lists the Drawing # 13226E7025 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4782 | |
| 14 | Page 13 / Section B / Item 0014 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 100 Amp/Phase, 50-ft is 6150-01-256-6304. The DRAFT lists the Drawing # 13226E7024 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-256-6304 | |
| 15 | Page 13 / Section B / Item 0015 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 40 Amp/Phase, 100-ft is 6150-01-247-4779. The DRAFT lists the Drawing # 13226E7023-1 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4779 | |
| 16 | Page 14 / Section B / Item 0016 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 40 Amp/Phase, 50-ft is 6150-01-247-4781. The DRAFT lists the Drawing # 13226E7023-2 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4781 | |
| 17 | Page 15 / Section B / Item 0017 | Duplicate Entry? | The NSN detailed for Item 0017 is the Drawing # that is associated with the M46 Illunination System, Item 0004. Is this a duplicate entry? Please clarify. | Item 0017 is a duplicate entry, removed from IFB | |
| 18 | Page 15 / Section B / Item 0018 | 60Amp Cable Required? | Both M60 Electrical Distribution System, and M60 Electrical Distribution Assembly are not among the top-level items being solicited, yet this 60Amp cable assembly is required? Please confirm. | 60A cable not required for this procurement | |
| 19 | Page 15 / Section B / Item 0018 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 60 Amp, 100-ft is 6150-01-247-4793. The DRAFT lists the Drawing # 13226E7022-1 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4793, - Cable is not required for this procurement | |
| 20 | Page 16 / Section B / Item 0019 | 60Amp Cable Required? | Both M60 Electrical Distribution System, and M60 Electrical Distribution Assembly are not among the top-level items being solicited, yet this 60Amp cable assembly is required? Please confirm. | 60A cable not required for this procurement | |
| 21 | Page 16 / Section B / Item 0020 | NSN# incorrect | The NSN # for Cable Assembly GRP E, 20 Amp, 50-ft is 6150-01-256-3643. The DRAFT lists the Drawing # 13226E7032-1 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-256-3643 | |
| 22 | Page 17 / Section B / Item 0021 | NSN# incorrect | The NSN # for Cable Assembly GRP E, 20 Amp, 25-ft is 6150-01-250-0044. The DRAFT lists the Drawing # 13226E7032-2 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-250-0044 | |
| 23 | Page 18 / Section B / Item 0022 | NSN# incorrect | The NSN # for Cable Assembly, In-line GFCI is 6150-01-598-9748. The DRAFT lists the Drawing # 09-4103 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-598-9748 | |
| 24 | Page 18 / Section B / Item 0023 | NSN# incorrect; Typo? | The NSN # for Branch Circuit Trunk Assembly is 6150-01-251-9124. The DRAFT lists the Drawing # 13226E7307 as the NSN. If the Drawing # is intended, the last number appears to have been entered incorrectly. The drawing number is 13226E7034. Please clarify. | Correct NSN is 9150-01-247-4783, DWG# is 13226E7037 | |
| 25 | Page 19 / Section B / Item 0024 | NSN# incorrect | The NSN # for Receptacle Group, 2 Duplex Box is 6150-01-251-9125. The DRAFT lists the Drawing #13226E7040 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-251-9125 | |
| 26 | Page 19 / Section B / Item 0025 | NSN# incorrect | The NSN # for Light, Utility is 6230-01-485-6375. The DRAFT lists the Drawing #13230E7018 as the NSN. Please clarify. | Confirmed: NSN is 6230-01-485-6375 | |
| 27 | Page 20 / Section B / Item 0026 | NSN# incorrect; | |||
| Drawing # doesn't match description | The NSN # for Double Strap, Cable Carrier Assembly is 6150-01-596-0428. The DRAFT lists the Drawing #13227E5825 as the NSN. NOTE: Drawing #13227E5825 is belongs to the Single Strap, Cable Carrier Assembly. 13227E5821 is the Drawing number for the Double Strap, Cable Carrier Assembly. Perhaps item 0026 is intended to be the Single Strap, Cable Carrier Assembly (NSN# 4340-01-256-6299)? Please clarify. | Correct Commodity name for Item 0026 should be "Single Strap Cable Assembly". |
Correct NSN for Item 0026 should be "4340-01-256-6299"
| 28 | Page 21 / Section B / Item 0027 | No NSN # listed; duplicate description | Item 0027 is described as Double Strap, Cable Carrier Assembly. This is the same description as Item 0026 which looks like it should have been described as "Single Strap". The NSN for the Double Strap, Cable Carrier Assembly is 6150-01-596-0428; and the Drawing # is 13227E5821. | NSN for Item 0027 is missing and should be "5975-01-596-0428" | |
| 29 | Page 21 / Section B / Item 0027 | NSN# incorrect | The NSN # for Strap is 5340-01-250-0045. The DRAFT lists the Drawing #13226E7044 as the NSN. Please clarify. | Confirmed: NSN is 5340-01-250-0045 | |
| 30 | Page 22 / Section B / Item 'N/A' | Missing Item? | Reference #s 18 and 20 above which are 60Amp cable assemblies. If these items are indeed required, wouldn't Cable Assembly, 60 kW, B Unit, W19 be required as well? NSN# 6150-01-440-5706; Drawing # 13229E5741. Please clarify. | This Cable NSN: 6150-01-440-5706 is not required for this procurement. | |
| 31 | Page 28 / Section B / Item 1005 | NSN# incorrect | The NSN # for M200 Electrical Feeder Center Assebmly is 6150-01-598-5455. The DRAFT lists the Drawing # 13229E6300 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-598-5455 | |
| 32 | Page 29 / Section B / Item 1006 | NSN# incorrect | The NSN # for M100 Electrical Feeder Center Assebmly is 6150-01-598-5282. The DRAFT lists the Drawing # 13229E6325 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-598-5282 | |
| 33 | Page 30 / Section B / Item 1007 | NSN# incorrect | The NSN # for M40 Electrical Distribution Center Assebmly is 6150-01-598-4796. The DRAFT lists the Drawing # 13229E6345 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-598-4796 | |
| 34 | Page 30 / Section B / Item 0008 | NSN# incorrect | The NSN # for M46 Container, Storage, Utility is 8145-01-568-4834. The DRAFT lists the Drawing # 13229E6362 as the NSN. Please clarify. | Confirmed: NSN is 8145-01-568-4834 | |
| 35 | Page 31 / Section B / Item 1009 | NSN# incorrect | The NSN # for Cable Assembly GRP PC, 200 Amp/Phase is 6150-01-247-4768. The DRAFT lists the Drawing # 13226E7021 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4768 | |
| 36 | Page 31 / Section B / Item 1010 | NSN# incorrect | The NSN # for Cable Assembly GRP PC, 100 Amp/Phase is 6150-01-265-6300. The DRAFT lists the Drawing # 13226E7020 as the NSN. Please clarify. | Correct NSN is 6150-01-256-6300 | |
| 37 | Page 32 / Section B / Item 1011 | NSN# incorrect | The NSN # for Cable Assembly GRP PC, 40 Amp/Phase is 6150-01-265-6301. The DRAFT lists the Drawing # 13226E7019 as the NSN. Please clarify. | Correct NSN is 6150-01-256-6301 | |
| 38 | Page 32 / Section B / Item 1012 | 60Amp Cable Required? | Both M60 Electrical Distribution System, and M60 Electrical Distribution Assembly are not among the top-level items being solicited, yet this 60Amp cable assembly is required? Please confirm. | This Cable NSN: 6150-01-247-4778 is not required for this procurement. | |
| 39 | Page 32 / Section B / Item 1012 | NSN# incorrect | The NSN # for Cable Assembly GRP PC, 60 Amp/Phase is 6150-01-247-4778. The DRAFT lists the Drawing # 13226E7018 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4778, -Cable is not required for this procurement | |
| 40 | Page 33 / Section B / Item 1013 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 200 Amp/Phase, 25-ft is 6150-01-247-4782. The DRAFT lists the Drawing # 13226E7025 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4782 | |
| 41 | Page 34 / Section B / Item 1014 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 100 Amp/Phase, 50-ft is 6150-01-256-6304. The DRAFT lists the Drawing # 13226E7024 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-256-6304 | |
| 42 | Page 34 / Section B / Item 1015 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 40 Amp/Phase, 100-ft is 6150-01-247-4779. The DRAFT lists the Drawing # 13226E7023-1 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4779 | |
| 43 | Page 35 / Section B / Item 1016 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 40 Amp/Phase, 50-ft is 6150-01-247-4781. The DRAFT lists the Drawing # 13226E7023-2 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4781 | |
| 44 | Page 35 / Section B / Item 1017 | Duplicate Entry? | The NSN detailed for Item 1017 is the Drawing # that is associated with the M46 Illunination System, Item 0004. Is this a duplicate entry? Please clarify. | Item 0017 is a duplicate entry, removed from IFB. | |
| 45 | Page 36 / Section B / Item 1018 | 60Amp Cable Required? | Both M60 Electrical Distribution System, and M60 Electrical Distribution Assembly are not among the top-level items being solicited, yet this 60Amp cable assembly is required? Please confirm. | 60A cable not required for this procurement | |
| 46 | Page 36 / Section B / Item 1018 | NSN# incorrect | The NSN # for Cable Assembly GRP S/F, 60 Amp, 100-ft is 6150-01-247-4793. The DRAFT lists the Drawing # 13226E7022-1 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-247-4793, -Cable is not required for this procurement | |
| 47 | Page 37 / Section B / Item 1019 | 60Amp Cable Required? | Both M60 Electrical Distribution System, and M60 Electrical Distribution Assembly are not among the top-level items being solicited, yet this 60Amp cable assembly is required? Please confirm. | 60A cable not required for this procurement | |
| 48 | Page 37 / Section B / Item 1020 | NSN# incorrect | The NSN # for Cable Assembly GRP E, 20 Amp, 50-ft is 6150-01-256-3643. The DRAFT lists the Drawing # 13226E7032-1 as the NSN. Please clarify. | Correct NSN is 6150-01-250-3643 | |
| 49 | Page 38 / Section B / Item 1021 | NSN# incorrect | The NSN # for Cable Assembly GRP E, 20 Amp, 25-ft is 6150-01-250-0044. The DRAFT lists the Drawing # 13226E7032-2 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-250-0044 | |
| 50 | Page 38 / Section B / Item 1022 | NSN# incorrect | The NSN # for Cable Assembly, In-line GFCI is 6150-01-598-9748. The DRAFT lists the Drawing # 09-4103 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-598-9748 | |
| 51 | Page 39 / Section B / Item 1023 | NSN# incorrect; Typo? | The NSN # for Branch Circuit Trunk Assembly is 6150-01-251-9124. The DRAFT lists the Drawing # 13226E7307 as the NSN. If the Drawing # is intended, the last number appears to have been entered incorrectly. The drawing number is 13226E7034. Please clarify. | Correct NSN is 9150-01-247-4783, DWG# is 13226E7037 | |
| 52 | Page 39 / Section B / Item 1024 | NSN# incorrect | The NSN # for Receptacle Group, 2 Duplex Box is 6150-01-251-9125. The DRAFT lists the Drawing #13226E7040 as the NSN. Please clarify. | Confirmed: NSN is 6150-01-251-9125 | |
| 53 | Page 40 / Section B / Item 1025 | NSN# incorrect | The NSN # for Light, Utility is 6230-01-485-6375. The DRAFT lists the Drawing #13230E7018 as the NSN. Please clarify. | Confirmed: NSN is 6230-01-485-6375 | |
| 54 | Page 41 / Section B / Item1026 | NSN# incorrect; | |||
| Drawing # doesn't match description | The NSN # for Double Strap, Cable Carrier Assembly is 6150-01-596-0428. The DRAFT lists the Drawing #13227E5825 as the NSN. NOTE: Drawing #13227E5825 is belongs to the Single Strap, Cable Carrier Assembly. 13227E5821 is the Drawing number for the Double Strap, Cable Carrier Assembly. Perhaps item 0026 is intended to be the Single Strap, Cable Carrier Assembly (NSN# 4340-01-256-6299)? Please clarify. | Correct Commodity name for Item 1026 should be "Single Strap Cable Assembly". |
Correct NSN for Item 0026 should be "4340-01-256-6299"
| 55 | Page 41 / Section B / Item 1027 | No NSN # listed; duplicate description | Item 0027 is described as Double Strap, Cable Carrier Assembly. This is the same description as Item 0026 which looks like it should have been described as "Single Strap". The NSN for the Double Strap, Cable Carrier Assembly is 6150-01-596-0428; and the Drawing # is 13227E5821. | NSN for Item 0027 is missing and should be "5975-01-596-0428" |
| 56 | Page 42 / Section B / Item 1027 | NSN# incorrect | The NSN # for Strap is 5340-01-250-0045. The DRAFT lists the Drawing #13226E7044 as the NSN. Please clarify. | Confirmed: NSN is 5340-01-250-0045 |
| 57 | Page 22 / Section B / Item 'N/A' | Missing Item? | See item #s 18, 20, 45, and 47 above which are 60Amp cable assemblies. If these items are indeed required, wouldn't Cable Assembly, 60 kW, B Unit, W19 be required as well? NSN# 6150-01-440-5706; Drawing # 13229E5741. Please clarify. | This Cable NSN: 6150-01-440-5706 is not required for this procurement. |
| 58 | W909MY-25-B-0001 | IFB | Can you please provide an unlocked IFB so the fill-ins can be completed? | Price Model (attachment 0002) is locked with fillable areas highlighted in yellow. The IFB is open and editable in PDF. |
| Section L&M | ||||
| 1 | 6 - Section L | submission | Will a DoD SAFE link be provided for the submission? | The government will provide the Request a Drop off with DoD SAFE and instruction in the revised draft IFB. |
| 2 | 6 - Section L | submission | Are 2 electronic versions of each volume required? | Please see Section L of the updated IFB. Only one electronic version of each volume is required. |
| 3 | 6 - Section L | typo | Suggest changing submission title for Volume 1 to "Volume 1 - Technical Proposal" | Please see Section L of the updated IFB. |
| 4 | 6 - Section L | no volume III | There is no suggested title listed or format required for Volume III | Please see Section L of the updated IFB. |
| 5 | General | Will the table of contents and summary count against the page count requirement | The Table of Contents and Summary are excluded from the page count. The summary shall be a brief and limited to 5 pages. The summary shall only included information abstracted from the Volume's narrative. | |
| 6 | Solicitation Page 95 Section M.1 | Tariff Implications | The Government's expressed objective is to determine which bid offers the lowest price. This offeror has worked very hard to negotiate the best pricing possible from material suppliers. Now, several suppliers of high-dollar / cost-driver components have issued statements about the tariffs currently being discussed / imposed by the US Governemnt on foreign sources of component materials. Suppliers are stating if they are unable to fully mitigate the impact of these tariffs, they will be forced to pass on the impact through price adjustments. What will be the Governmnent's response to tariff-related ambiguity and impactful price increases that may follow the bid response date? | The Government will add a EPA clause to the IFB to allow for contract price adjustments in the event of changes in the contractor’s established prices. Please see amended IFB. |
| 7 | Solicitation Page 95; Section M.2.1 | Section C? | This section requries compliance to Section C. The solicitation doesn't include a Section C. Please clarify. | Section C refers to Attachment 0001 , the PDISE Statement of Work ( SOW) |
| SOW | ||||
| 1 | SOW - Attachment 1 | Provisioning Requirements Statement | Required PPL, EDFP, TMs, MAC and RPSTL but there is no pricing line. Are these already developed and not required? | As the systems in question are fully matured, the development of provisioning material, including the Provisioning Parts List (PPL), Engineering Data For Provisioning (EDFP), Technical Manuals (TMs), Maintenance Allocation Chart (MAC), and Repair Parts and Special Tools List (RPSTL), is not required at this stage. These documents and materials have already been developed during prior phases of the program, ensuring that they meet all necessary specifications and requirements. |
Attachment 1, which is included with this response, provides reference documentation to confirm the completion of these items. Since the systems are fully mature, no additional provisioning or material development is necessary, and these items are considered finalized.
| 2 | SOW 3.3 | FA | Where will the FA be delivered if testing is the responsibility of the contractor? | The location for the delivery and testing of the FA (First Article) units will be at the contractor’s discretion, based on their internal testing and quality assurance processes. The contractor is responsible for ensuring that the FA units meet all the operational and functional requirements outlined in the Statement of Work (SOW) and in compliance with the relevant standards such as MIL-DTL-53126. |
| 3 | SOW 3.5.1 | CIVR | Will the CIVR be completed before testing begins? | No, the CIVR (Configuration Item Verification Review) will not be conducted before testing. The CIVR will take place after all testing has been successfully completed and passed. The purpose of the CIVR is to confirm that the final product adheres to the technical specifications and requirements outlined in the Technical Data Package (TDP) and the Statement of Work (SOW). |
The CIVR process ensures that the product has been manufactured, assembled, and tested in accordance with the defined standards, and that all design and performance criteria are met. It acts as a final verification step, validating the alignment between the built product and the documentation provided in the TDP and SOW. This review will include a detailed inspection of the product's quality, compliance with regulatory standards, and confirmation that all necessary testing and validation activities have been completed per the contractual requirements.
| 4 | General | Please provide the most current TDP for all lines | The government will provide via SAFE.apps.mil. The TDP with the current drawings will be provided to vendors upon request. Request shall be sent to the KO, Ms. Jessica Hawkins and Ms. Mary Suda at jessica.l.hawkins27.civ@army.mil and mary.a.suda.civ@army.mil | |
| 1 | P8 / 3.3 | First Article | The first sentence states that fabrication and testing, among other activities, should be completed within 12 months. The third sentence specifies that the FAT units must be delivered no later than 180 days. Does this mean the Government intends for the FAT units to be built within 6 months (180 days) and then tested internally for an additional 6 months? This would result in the FAT phase being completed within 12 months. | Yes, that is correct. The FA (First Article) period is designed to span 12 months in total, with a timeline for fabrication, testing, and evaluation. The first 6 months of this 12-month period will be dedicated to the fabrication and production of the FA units. During this phase, the contractor will focus on completing the manufacturing, assembly, and integration of the FAT units in alignment with the technical specifications outlined in the TDP and SOW. |
The subsequent 6 months will be allocated for comprehensive testing and evaluation of the FAT units to ensure that the FAT units meet all performance criteria and are fully operational before delivery. The testing period allows for verification of the units’ compliance with contractual and operational requirements, and also provides the opportunity to address any issues or adjustments identified during the testing process.
In summary, the FAT phase will be completed within a 12-month period, with the first 6 months focused on fabrication and the remaining 6 months dedicated to testing and validation.
| 2 | P9 / 3.4 | TDP | We respectfully request access to the technical data package for all configuration items and accessories. | The government will provide via SAFE.apps.mil. The TDP with the current drawings will be provided to vendors upon request. Request shall be sent to the KO, Ms. Jessica Hawkins and Ms. Mary Suda at jessica.l.hawkins27.civ@army.mil and mary.a.suda.civ@army.mil |
| 3 | P13 / 3.9 | Configuration Management | Section 3.9 contains a fairly robust configuration management requirement for a build-to-print effort. Why is this the case? Does the government anticipate the need for the generation and submittal of ECPs during the execution of the contract because there are issues with the current baseline? If so, what are the areas of concern within the technical data that will / might require attention? | At this time, we do not anticipate any major changes that would necessitate the submission of ECPs. The current baseline design has been thoroughly validated, and the system has proven reliability. However, given the dynamic nature of hardware production and external factors, such as supply chain variability or part obsolescence, there could be minor adjustments or variations needed in the materials or components used. |
The robust configuration management (CM) requirements in Section 3.9 are in place to ensure that, even for a build-to-print effort, any necessary changes or adjustments can be efficiently managed throughout the contract lifecycle. While the design is fully matured, with over 30,000 units produced in the past, it is important to maintain a structured CM process to address any unforeseen issues that might arise during production or testing. This includes the ability to manage Engineering Change Proposals (ECPs) if required.
Areas of concern that might trigger minor changes include:
Supply Chain Disruptions: Unexpected delays or shortages in components could require substitution or re-sourcing, potentially leading to variations in part specifications or suppliers.
Quality Variations: Even with established parts and materials, quality issues (e.g., deviations in batch production or manufacturing tolerances) may necessitate slight adjustments to ensure system integrity and compliance.
Component Obsolescence: If a component becomes obsolete or is no longer available, a suitable replacement might be needed, which could require minor design updates or configuration adjustments.
In all cases, any changes would be managed through the established CM process, with full documentation, review, and approval as necessary. The goal is to ensure that all modifications, however minor, are tracked and controlled to maintain the integrity of the product and compliance with the contractual requirements.
| TDP | ||||
| 1 | excel file M40 PDISE TDPL, Item No. 56 | TDP | Review of the TDP, we found a discrepancy in the M40 directory. In the excel file M40 PDISE TDPL, Item No. 56, Drawing Number 13229E6353, lists Revision M. However, in the PDF sub-directory of M40, the drawing file 13229E6353P001.pdf is Drawing No. 13229E6353, Revision P. Could you confirm the correct revision of Drawing No. 13229E6353 that we should be using? | Revision P is the correct revision of Drawing No. 13229E6353, and it should be used. Please proceed with using Revision P for this drawing as it is the most up to date. |
| 2 | Drawing 13226E7023 Cable Assemble | TDP | Drawing 13226E7023 Cable Assemble, Grp S/F, 40/60 Amp/Phase specifies Connectors FN 1 – MS90556C32405P and FN 2 – MS90557C32405S. Please provide clarification, should the connector specifications be FN 1 – MS90556C32413P and FN 2 – MS90557C32413S. | Concur. In accordance with MS90565, FN 1 should read MS90556C32413P, and FN 2 should read MS90557C32413S. |
| 3 | Drawing 13226E7019 Cable Assemble | TDP | Drawing 13226E7019 Cable Assembly, Grp PC, 40/60 Amp/Phase specifies cable FN 2 – M3432-04HDF(4/4-4/8R)1290. Please provide clarification, SHOULD the cable specification be FN 3 – M3432-04HDF(4/1-4/8R)1620. | |
| Concur. In accordance with MS90565, FN 2 should read M3432-04HDF(4/4-4/12R)1290. | ||||
| 4 | Drawing 13226E7024 Cable Assembly | TDP | Drawing 13226E7024 Cable Assembly, Grp S/F, 100 Amp/Phase specifies cable FN 3 – M3432-04HDF(4/1-3/8R)1620. Please provide clarification, SHOULD the cable specification be FN 3 – M3432-04HDF(4/1-4/8R)1620. | Concur. In accordance with MS14055, FN 3 should read M3432-04HDF(4/1-4/8R)1620. |
| 5 | Drawing numbers 13230E7019 Packaging, PDISE M200 A/P, 13230E7020 Packaging, PDISE M100 A/P, and 13230E7021 Packaging, PDISE M40/M60 A/ | TDP | Drawing numbers 13230E7019 Packaging, PDISE M200 A/P, 13230E7020 Packaging, PDISE M100 A/P, and 13230E7021 Packaging, PDISE M40/M60 A/P specify cleat lumber in accordance with ASTM D 6199, Class 2, Group III. After review, crate supplier has identified that the lumber species specified in Group III have very limited supply and are prohibitively expensive. Supplier recommended Group II lumber species as a replacement as it is the industry standard for this type of shipping container IAW government specs. Please clarify if the more cost-effective Group II lumber species would be an acceptable alternative. | We will maintain the current lumber specification at this time. Any changes require an impact assessment to ensure compliance and quality standards. |
| 6 | excel file M40 PDISE TDPL | TDP | 13214E8326 TDP Stated Revision "N", drawing supplied is Revision "M." 13226E7044 TDP Stated Revision "D" dreawing supplied is Revision "C" | For 13214E8326 use "M" |
For 13226E7044 use "C" 7 M46 TDP TDP 13226E7041 TDP Stated Revision "D", drawing supplied is Revision "C." 13226E7042 TDP Stated Revision "B", drawing supplied is Revision "A." 13226E7044 TDP Stated Revision "D", drawing supplied is Revision "C." For 13226E7041 use "C" For 13226E7042 use "A" For 13226E7044 use "C"
| 8 | M100 TDP | TDP | 13214E8326 TDP Stated Revision "N", drawing supplied is Revision "M." | For 13214E8326 use "M" |
| 9 | M200 TDP | TDP | 13214E8326 TDP Stated Revision "N", drawing supplied is Revision "M." | For 13214E8326 use "M" |
| 10 | Drawing 13227E5812 | TDP | Drawing 13227E5812 is missing pages 2 & 3 of the document. |
Page 1 only shows the -1, -2, -3
| We need out to the -9. | We have the complete DWG 13227E5812 with all pages and will send out to all interested vendor | ||||
| 11 | MIL-DTL-53126 Section 4.7.1 | MIL-STD-705 Call-out? | MIL-STD-705 is a generator specification. PDISE is not a generator. How does this specification (i.e.. TM512.2d / 710.1d) apply? Please clarify. | MIL-STD-705 is the standard for Mobile Electric Power Systems which consists of Mobile Electic Power Distribution Systems. |
For TM 512.2d please reference the portion which applies to testing PDISE circuit breaker for Overload Current and follow 3.3.6 and 3.3.8 of SOW for actual testing requirements.
For TM 710.1d please reference the portion which applies to testing circuit breaker and follow instruction to test PDISE circuit breaker operation (rated load) at 135°F (57°C) for 2 hours (continuously).
12 TDP Incomplete Drawing Drawing # 13230E7022 Rev F - Page 2 was not provided. Consequently, "dash number" details are not available. We have the complete Drawing 13230E7022 Rev F - inclusive of page 2. On 03 MAR 25 it was was sent to any vendor that had previously requested the TDPs via DoDsafe and is available on SAM.gov in response to industry questions.
&"Arial,Bold"&14Integrated Commercial Intrustion Detection System - VI