Small Tactical Electric Power 3-Kilowatt(STEP 3kW) AMENDMENT 0003
Solicitation number
W909MY-22-R-0009
Issued by

About this file

This solicitation is for three Engineering and Manufacturing Development contracts for a new Small Tactical Electric Power 3-kilowatt generator. The Army requiring activity is Product Manager, Mobile Electric Power Systems. Each contract will have four phases: Preliminary Design Review, Critical Design Review, Prototype Build and Delivery, and Test Support. The affordability goal for each contract is $7.5 million to fund development, deliverables including 30 generator sets, and support through all phases. Two of the three awards are initially set aside for small businesses, with large businesses able to compete for the remaining award. This development has potential for a substantial follow-on production contract, which will likely be awarded non-competitively to any contractor completing Engineering and Manufacturing Development with a system meeting requirements. The solicitation closing date is not provided.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-2, AUG 96

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

X

STEP 3kW

C001 Preliminary Design Review (PDR) / Critical Design Review (CDR) / Test Readiness Review (TRR) Presentation Material

DI-MISC-80711 SOW Para 5 & 8 SFAE-CSS-E2-M

N/A

N/A E

Twice

1st Use

See Item 16

7 DA Review

SFAE-CSS-E2-M 2 2

ACO 1 1

CCAP-CCV 2 2

FCDD-ISN 1 1

6 6 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 10: Submit each deliverable twice for each review conducted.

Item 12: Submit at least 14 calendar days prior to the PDR/CDR/TRR meeting.

Item 13: Submit revised material no later than 7 working days after each meeting.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

C002 Product Drawings and Associated Lists

DI-SESS-81000B SOW PARA 5.1 & 8 SFAE-CSS-E2-M

N/A

N/A E

Twice

1st Use

See Item 16

See Item 16

SFAE-CSS-E2-M 0 2

ACO 0

CCAP-CCV 0

FCDD-ISN 0

0 2 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 12: Submit no later than 7-days following the CDR.

Item 13: Submit no later than 14-days prior to the end of phase 3.

Item 14: CD-ROM SUBMITTAL:

PM MEPS (SFAE-CSS-E2-M)

Bldg 324 5850 Delafield Rd Ft Belvoir, VA 22060 ATTN: Terrence Wicherski

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.10

08093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.03.16 11:11:56 -04'00'

16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.1265873835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.03.17 13:23:24 -04'00'

17 Mar 22

Adobe Professional 8.0

DD FORM 1423-1, FEB 2001

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X

STEP 3kW

C003 Quality Control Plan

DI-MGMT-82184 SOW Para 6 & 8 SFAE-CSS-E2-M

N/A

N/A E

Once

1st Use

See Item 16

See Item 16

SFAE-CSS-E2-M 2 2

ACO 1 1

CCAP-CCV 2 2

FCDD-ISN 1 1

6 6 0

Item 4: Delete requirement Section 2 of DI-MGMT-82184. Content shall be include current contractor plan. Days required are in working days.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 12: Submit 90 days after contract award. The government requires 30 days for review/comment.

Item 13: Submit final 30 days after government comments incorporated or upon approval of draft.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

------------------Nothing Follows----------------------------------------------------------------------

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.1

008093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.03.16 10:40:57 -04'00'

16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.12658

73835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.03.17 13:22:58 -04'00'

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

STEP 3kW

C004 Electronic Technical Manual (ETM)

DI-MISC-80711 & MIL-STD 400051-2C SOW Para 7, 7.1 & 8 SFAE-CSS-E2-M

N/A

N/A E

Three Times

1st Use

See Item 16

See Item 16

SFAE-CSS-E2-M 2 2

ACO 1 1

CCAP-CCV 2 2

5 5 0

16. REMARKS

Item 4: A Repair Parts and Special Tools List (RPSTL) is not required as part of any eTM submission. For each change, the contractor shall deliver digital files for the ETM revision and/or change package developed under this contract. The contractor shall provide a complete set of all integrated text and graphics files (with graphics embedded) unless otherwise approved by the Government Acceptance Office. The integrated copy must appear on screen and print exactly as printed final. Final delivery is also required as non-integrated native files containing editable text and resizable graphics. All digital files shall be provided both by electronic submission, e.g., e-mail, etc., as approved by the requiring office, and by CD, readable by computers running current Government utilized Microsoft Operating System.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 12: Submit 1st draft (30%) 30-days days prior to the end of Phase 2.

Item 13: Submit 2nd draft (70%) 30-days prior to the end of Phase 3. Submit final draft (90%) five-months after the start of Phase 4.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

------------------Nothing Follows----------------------------------------------------------------------

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.1

008093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.05.19 13:18:18 -04'00'

19 Apr 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.12658

73835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.05.24 08:32:34 -04'00'

24 May 22

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

X

STEP 3kW

C005 Failure Modes, Effects, and Criticality Analysis (FMECA) Report

DI-SESS-81495 SOW Para 7.1 & 8.0 SFAE-CSS-E2-M

N/A

N/A E

Once

1st Use

See Item 16

N/A

SFAE-CSS-E2-M 2 2

ACO 1 1

CCAP-CCV 2 2

FCDD-ISN 1 1

6 6 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 11: Submit 14-days prior to the conclusion of Phase 3.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

C006 Maintenance Analysis Report

DI-MISC-80711 SOW PARA 7.1 & 8.0 SFAE-CSS-E2-M

N/A

N/A E

Once

1st Use

See Item 16

N/A

SFAE-CSS-E2-M 2 2

ACO 1 1

CCAP-CCV 2 2

FCDD-ISN 1 1

6 6 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 11: Submit 14-days prior to the conclusion of Phase 3.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.10

08093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.03.16 10:45:23 -04'00'

16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.1265873835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.03.17 13:20:25 -04'00'

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X

STEP 3kW

C007 Engineering Data for Provisioning (EDFP)

DI-SESS-81874 SOW Para 7.1 & 8 SFAE-CSS-E2-M

N/A

N/A E

Once

1st Use

See Item 16

N/A

SFAE-CSS-E2-M 0 2

ACO 0 1

CCAP-CCV 0 2

`FCDD-ISN 0 1

0 6 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 12: Submit no later than 14-days prior to the end of phase 3.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

------------------Nothing Follows----------------------------------------------------------------------

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.1

008093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.03.16 10:47:25 -04'00'

16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.12658

73835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.03.17 13:21:49 -04'00'

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X

STEP 3kW

C008 Bar Code Identification Report UID Data for Embedded Components

DI-SESS-81874 SOW Para 7.2 & 8 SFAE-CSS-E2-M

N/A

N/A E

See Item 16

See Item 16

See Item 16

See Item 16

SFAE-CSS-E2-M 0 2

ACO 0 1

CCAP-CCV 0 2

`FCDD-ISN 0 1

0 6 0

Item 4 Tailoring of Data Item Description DI- MGMT-80177B:

Para. 10.2 Delete magnetic tape media format. Use DoD electronic commerce methods (see SOW Para. 3.7.1a).

Para. 10.2.1-10.2.15. Reorder/rename fields for UID data elements.

10.2.1 UID of the items delivered that contains the embedded subassembly, component or part.

10.2.2 UID of the embedded subassembly, component or part.

10.2.3 UID type

10.2.4 Issuing Agency

10.2.5 Enterprise Identifier

10.2.6 Original part number

10.2.7 Serial number

10.2.8 Unit of Measure

10.2.9 Description

10.2.10-10.2.15 Not used

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 10-13: Concurrent with associated end item and see SOW Paragraph 7.3 for Data Submission Requirements

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

------------------Nothing Follows----------------------------------------------------------------------

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.1

008093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.03.16 10:49:19 -04'00'

16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.12658

73835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.03.17 13:22:22 -04'00'

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

X

STEP 3kW

C009 Post-Award Orientation Meeting Presentation Materials

DI-MISC-80711 SOW Para 8.0 SFAE-CSS-E2-M

N/A

N/A E

Once

1st Use

See Item 16

N/A

SFAE-CSS-E2-M 2 2

ACO 1 1

CCAP-CCV 2 2

FCDD-ISN 1 1

6 6 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 12: Submit 21-days after contract award.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

C010 Bi-Monthly Progress Report

DI-ADMN-80447A SOW PARA 8.0 SFAE-CSS-E2-M

N/A

N/A E

Bi-monthly

1st Use

See Item 16

See Item 16

SFAE-CSS-E2-M 0 2

ACO 0 1

CCAP-CCV 0 2

FCDD-ISN 0 1

0 6 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Items 12 & 13: First submission should be at the end of the second calendar month after award and at the end of every other month throughout each awarded phase. Reports which coincide with an End of Phase report do not need to be submitted separately.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.10

08093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.03.16 10:52:11 -04'00'

16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.1265873835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.03.17 13:20:00 -04'00'

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

X

STEP 3kW

C011 Safety Assessment Report (SAR)

DI-MISC-80711 SOW Para 8 & 10.1 SFAE-CSS-E2-M

N/A

N/A E

See Item 16

1st Use

See Item 16

See Item 16

SFAE-CSS-E2-M 2 2

ACO 1 1

ACO 1 1

CCAP-CCV 2 2

FCDD-ISN 1 1

7 7 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 10: One report for each phase in which the awardee performs work.

Item 12 & 13: Submit the draft report 21-days prior to the end of Phases 1-4. The Government will provide input within 21-days of receipt of a working or final draft SAR.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil AMEL-SFS-FB: andrew.a.blaisdell.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

C012`` Software Requirement Specification

DI-IPSC-81433A SOW Para 8 & 12 SFAE-CSS-E2-M

N/A

N/A E

Once

1st Use

See Item 16

N/A

SFAE-CSS-E2-M 2 1

ACO 1 1

CCAP-CCV 2 1

FCDD-ISN 1 1

6 4 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 10: One submission for each separate software requirement.

Item 12: Submit the deliverable 30-days prior to the end of Phase 3.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.10

08093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.03.16 10:54:38 -04'00'

16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.1265873835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.03.17 13:23:44 -04'00'

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

X

STEP 3kW

C013 Computer Software Product

DI-IPSC-81488 SOW Para 8 & 12 SFAE-CSS-E2-M

N/A

N/A E

Once

1st Use

See Item 16

N/A

SFAE-CSS-E2-M 2 2

ACO 1 1

ACO 1 1

CCAP-CCV 2 2

FCDD-ISN 1 1

7 7 0

16. REMARKS

Contractor should propose format to Government for approval.

IItem 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 12: Submit the deliverable not later than 30-days after the start of phase 4.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

C014`` End of Phase Report

DI-MISC-80711 SOW Para 8 & 12 SFAE-CSS-E2-M

N/A

N/A E

See Item 16

1st Use

See Item 16

See Item 16

SFAE-CSS-E2-M 2 1

ACO 1 1

CCAP-CCV 2 1

FCDD-ISN 1 1

6 4 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 10: One report for each phase in which the awardee performs work.

Item 12 & 13: Submit at conclusion of Phases 1-4.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.10

08093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.03.16 10:57:47 -04'00'

16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.1265873835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.03.17 13:24:06 -04'00'

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

X

STEP 3kW

C015 Item Unique Identification (IUID) Marking Plan

DI-MGMT-81803A SOW Para 7.2 & 8 SFAE-CSS-E2-M

N/A

N/A E

Twice

1st Use

See Item 16

See Item 16

SFAE-CSS-E2-M 2 2

ACO 1 1

ACO 1 1

CCAP-CCV 2 2

FCDD-ISN 1 1

7 7 0

Contractor should propose format to Government for approval.

Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.

Item 12: Submit the draft not later than (NLT) the end of phase 3 and the final version NLT five months after the start of phase 4.

Item 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil

-----------------------Nothing Follows------------------------------------------------------------------

0 0 0

Terrence P. Wicherski, STEP 3kW APM

WICHERSKI.TERRENCE.PAUL.10

08093420

Digitally signed by

WICHERSKI.TERRENCE.PAUL.1008093420

Date: 2022.05.19 13:20:43 -04'00'

19 May 22 Thomas Beyerl, LTC, AR, PM MEPS

BEYERL.THOMAS.A.1265873835

Digitally signed by

BEYERL.THOMAS.A.1265873835

Date: 2022.05.24 08:33:06 -04'00'

24 May 22

5Exhibit A CDRLS
6
7Exhibit A CDRLS
8
9Exhibit A CDRLS 2
69Exhibit A CDRLS 2
Exhibit A CDRLS 2
Exhibit A CDRLS 3
Exhibit A CDRLS 4
Exhibit A CDRLS 38
Exhibit A CDRLS

File details come from the government source that posted it. Updated .