This solicitation is for three Engineering and Manufacturing Development contracts for a new Small Tactical Electric Power 3-kilowatt generator. The Army requiring activity is Product Manager, Mobile Electric Power Systems. Each contract will have four phases: Preliminary Design Review, Critical Design Review, Prototype Build and Delivery, and Test Support. The affordability goal for each contract is $7.5 million to fund development, deliverables including 30 generator sets, and support through all phases. Two of the three awards are initially set aside for small businesses, with large businesses able to compete for the remaining award. This development has potential for a substantial follow-on production contract, which will likely be awarded non-competitively to any contractor completing Engineering and Manufacturing Development with a system meeting requirements. The solicitation closing date is not provided.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-2, AUG 96
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items)
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page ____ of ____ Pages
X
STEP 3kW
C001 Preliminary Design Review (PDR) / Critical Design Review (CDR) / Test Readiness Review (TRR) Presentation Material
DI-MISC-80711 SOW Para 5 & 8 SFAE-CSS-E2-M
N/A
N/A E
Twice
1st Use
See Item 16
7 DA Review
SFAE-CSS-E2-M 2 2
ACO 1 1
CCAP-CCV 2 2
FCDD-ISN 1 1
6 6 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 10: Submit each deliverable twice for each review conducted.
Item 12: Submit at least 14 calendar days prior to the PDR/CDR/TRR meeting.
Item 13: Submit revised material no later than 7 working days after each meeting.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
C002 Product Drawings and Associated Lists
DI-SESS-81000B SOW PARA 5.1 & 8 SFAE-CSS-E2-M
N/A
N/A E
Twice
1st Use
See Item 16
See Item 16
SFAE-CSS-E2-M 0 2
ACO 0
CCAP-CCV 0
FCDD-ISN 0
0 2 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 12: Submit no later than 7-days following the CDR.
Item 13: Submit no later than 14-days prior to the end of phase 3.
Item 14: CD-ROM SUBMITTAL:
PM MEPS (SFAE-CSS-E2-M)
Bldg 324 5850 Delafield Rd Ft Belvoir, VA 22060 ATTN: Terrence Wicherski
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.10
08093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.03.16 11:11:56 -04'00'
16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.1265873835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.03.17 13:23:24 -04'00'
17 Mar 22
Adobe Professional 8.0
DD FORM 1423-1, FEB 2001
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
X
STEP 3kW
C003 Quality Control Plan
DI-MGMT-82184 SOW Para 6 & 8 SFAE-CSS-E2-M
N/A
N/A E
Once
1st Use
See Item 16
See Item 16
SFAE-CSS-E2-M 2 2
ACO 1 1
CCAP-CCV 2 2
FCDD-ISN 1 1
6 6 0
Item 4: Delete requirement Section 2 of DI-MGMT-82184. Content shall be include current contractor plan. Days required are in working days.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 12: Submit 90 days after contract award. The government requires 30 days for review/comment.
Item 13: Submit final 30 days after government comments incorporated or upon approval of draft.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
------------------Nothing Follows----------------------------------------------------------------------
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.1
008093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.03.16 10:40:57 -04'00'
16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.12658
73835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.03.17 13:22:58 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
STEP 3kW
C004 Electronic Technical Manual (ETM)
DI-MISC-80711 & MIL-STD 400051-2C SOW Para 7, 7.1 & 8 SFAE-CSS-E2-M
N/A
N/A E
Three Times
1st Use
See Item 16
See Item 16
SFAE-CSS-E2-M 2 2
ACO 1 1
CCAP-CCV 2 2
5 5 0
16. REMARKS
Item 4: A Repair Parts and Special Tools List (RPSTL) is not required as part of any eTM submission. For each change, the contractor shall deliver digital files for the ETM revision and/or change package developed under this contract. The contractor shall provide a complete set of all integrated text and graphics files (with graphics embedded) unless otherwise approved by the Government Acceptance Office. The integrated copy must appear on screen and print exactly as printed final. Final delivery is also required as non-integrated native files containing editable text and resizable graphics. All digital files shall be provided both by electronic submission, e.g., e-mail, etc., as approved by the requiring office, and by CD, readable by computers running current Government utilized Microsoft Operating System.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 12: Submit 1st draft (30%) 30-days days prior to the end of Phase 2.
Item 13: Submit 2nd draft (70%) 30-days prior to the end of Phase 3. Submit final draft (90%) five-months after the start of Phase 4.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
------------------Nothing Follows----------------------------------------------------------------------
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.1
008093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.05.19 13:18:18 -04'00'
19 Apr 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.12658
73835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.05.24 08:32:34 -04'00'
24 May 22
(2 Data Items)
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page ____ of ____ Pages
X
STEP 3kW
C005 Failure Modes, Effects, and Criticality Analysis (FMECA) Report
DI-SESS-81495 SOW Para 7.1 & 8.0 SFAE-CSS-E2-M
N/A
N/A E
Once
1st Use
See Item 16
N/A
SFAE-CSS-E2-M 2 2
ACO 1 1
CCAP-CCV 2 2
FCDD-ISN 1 1
6 6 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 11: Submit 14-days prior to the conclusion of Phase 3.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
C006 Maintenance Analysis Report
DI-MISC-80711 SOW PARA 7.1 & 8.0 SFAE-CSS-E2-M
N/A
N/A E
Once
1st Use
See Item 16
N/A
SFAE-CSS-E2-M 2 2
ACO 1 1
CCAP-CCV 2 2
FCDD-ISN 1 1
6 6 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 11: Submit 14-days prior to the conclusion of Phase 3.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.10
08093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.03.16 10:45:23 -04'00'
16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.1265873835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.03.17 13:20:25 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
X
STEP 3kW
C007 Engineering Data for Provisioning (EDFP)
DI-SESS-81874 SOW Para 7.1 & 8 SFAE-CSS-E2-M
N/A
N/A E
Once
1st Use
See Item 16
N/A
SFAE-CSS-E2-M 0 2
ACO 0 1
CCAP-CCV 0 2
`FCDD-ISN 0 1
0 6 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 12: Submit no later than 14-days prior to the end of phase 3.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
------------------Nothing Follows----------------------------------------------------------------------
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.1
008093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.03.16 10:47:25 -04'00'
16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.12658
73835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.03.17 13:21:49 -04'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
X
STEP 3kW
C008 Bar Code Identification Report UID Data for Embedded Components
DI-SESS-81874 SOW Para 7.2 & 8 SFAE-CSS-E2-M
N/A
N/A E
See Item 16
See Item 16
See Item 16
See Item 16
SFAE-CSS-E2-M 0 2
ACO 0 1
CCAP-CCV 0 2
`FCDD-ISN 0 1
0 6 0
Item 4 Tailoring of Data Item Description DI- MGMT-80177B:
Para. 10.2 Delete magnetic tape media format. Use DoD electronic commerce methods (see SOW Para. 3.7.1a).
Para. 10.2.1-10.2.15. Reorder/rename fields for UID data elements.
10.2.1 UID of the items delivered that contains the embedded subassembly, component or part.
10.2.2 UID of the embedded subassembly, component or part.
10.2.3 UID type
10.2.4 Issuing Agency
10.2.5 Enterprise Identifier
10.2.6 Original part number
10.2.7 Serial number
10.2.8 Unit of Measure
10.2.9 Description
10.2.10-10.2.15 Not used
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 10-13: Concurrent with associated end item and see SOW Paragraph 7.3 for Data Submission Requirements
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
------------------Nothing Follows----------------------------------------------------------------------
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.1
008093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.03.16 10:49:19 -04'00'
16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.12658
73835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.03.17 13:22:22 -04'00'
(2 Data Items)
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page ____ of ____ Pages
X
STEP 3kW
C009 Post-Award Orientation Meeting Presentation Materials
DI-MISC-80711 SOW Para 8.0 SFAE-CSS-E2-M
N/A
N/A E
Once
1st Use
See Item 16
N/A
SFAE-CSS-E2-M 2 2
ACO 1 1
CCAP-CCV 2 2
FCDD-ISN 1 1
6 6 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 12: Submit 21-days after contract award.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
C010 Bi-Monthly Progress Report
DI-ADMN-80447A SOW PARA 8.0 SFAE-CSS-E2-M
N/A
N/A E
Bi-monthly
1st Use
See Item 16
See Item 16
SFAE-CSS-E2-M 0 2
ACO 0 1
CCAP-CCV 0 2
FCDD-ISN 0 1
0 6 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Items 12 & 13: First submission should be at the end of the second calendar month after award and at the end of every other month throughout each awarded phase. Reports which coincide with an End of Phase report do not need to be submitted separately.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.10
08093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.03.16 10:52:11 -04'00'
16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.1265873835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.03.17 13:20:00 -04'00'
(2 Data Items)
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page ____ of ____ Pages
X
STEP 3kW
C011 Safety Assessment Report (SAR)
DI-MISC-80711 SOW Para 8 & 10.1 SFAE-CSS-E2-M
N/A
N/A E
See Item 16
1st Use
See Item 16
See Item 16
SFAE-CSS-E2-M 2 2
ACO 1 1
ACO 1 1
CCAP-CCV 2 2
FCDD-ISN 1 1
7 7 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 10: One report for each phase in which the awardee performs work.
Item 12 & 13: Submit the draft report 21-days prior to the end of Phases 1-4. The Government will provide input within 21-days of receipt of a working or final draft SAR.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil AMEL-SFS-FB: andrew.a.blaisdell.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
C012`` Software Requirement Specification
DI-IPSC-81433A SOW Para 8 & 12 SFAE-CSS-E2-M
N/A
N/A E
Once
1st Use
See Item 16
N/A
SFAE-CSS-E2-M 2 1
ACO 1 1
CCAP-CCV 2 1
FCDD-ISN 1 1
6 4 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 10: One submission for each separate software requirement.
Item 12: Submit the deliverable 30-days prior to the end of Phase 3.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.10
08093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.03.16 10:54:38 -04'00'
16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.1265873835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.03.17 13:23:44 -04'00'
(2 Data Items)
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page ____ of ____ Pages
X
STEP 3kW
C013 Computer Software Product
DI-IPSC-81488 SOW Para 8 & 12 SFAE-CSS-E2-M
N/A
N/A E
Once
1st Use
See Item 16
N/A
SFAE-CSS-E2-M 2 2
ACO 1 1
ACO 1 1
CCAP-CCV 2 2
FCDD-ISN 1 1
7 7 0
16. REMARKS
Contractor should propose format to Government for approval.
IItem 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 12: Submit the deliverable not later than 30-days after the start of phase 4.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
C014`` End of Phase Report
DI-MISC-80711 SOW Para 8 & 12 SFAE-CSS-E2-M
N/A
N/A E
See Item 16
1st Use
See Item 16
See Item 16
SFAE-CSS-E2-M 2 1
ACO 1 1
CCAP-CCV 2 1
FCDD-ISN 1 1
6 4 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 10: One report for each phase in which the awardee performs work.
Item 12 & 13: Submit at conclusion of Phases 1-4.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.10
08093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.03.16 10:57:47 -04'00'
16 Mar 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.1265873835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.03.17 13:24:06 -04'00'
(2 Data Items)
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page ____ of ____ Pages
X
STEP 3kW
C015 Item Unique Identification (IUID) Marking Plan
DI-MGMT-81803A SOW Para 7.2 & 8 SFAE-CSS-E2-M
N/A
N/A E
Twice
1st Use
See Item 16
See Item 16
SFAE-CSS-E2-M 2 2
ACO 1 1
ACO 1 1
CCAP-CCV 2 2
FCDD-ISN 1 1
7 7 0
Contractor should propose format to Government for approval.
Item 9. DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only. Other requests for this document shall be referred to Product Manager, Mobile Electric Power Sources (PM MEPS), Bldg 324, 5850 Delafield Rd, Ft. Belvoir, VA 22060.
Item 12: Submit the draft not later than (NLT) the end of phase 3 and the final version NLT five months after the start of phase 4.
Item 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wicherski.civ@army.mil SFAE-CSS-E2-S: casey.h.huffman.civ@army.mil FCDD-ISN: debra.l.bowman6.civ@army.mil CCAP-CCV: darbye.t.rivera.civ@army.mil; and CCAP-CCV: jessica.l.hawkins27.civ@army.mil
-----------------------Nothing Follows------------------------------------------------------------------
0 0 0
Terrence P. Wicherski, STEP 3kW APM
WICHERSKI.TERRENCE.PAUL.10
08093420
Digitally signed by
WICHERSKI.TERRENCE.PAUL.1008093420
Date: 2022.05.19 13:20:43 -04'00'
19 May 22 Thomas Beyerl, LTC, AR, PM MEPS
BEYERL.THOMAS.A.1265873835
Digitally signed by
BEYERL.THOMAS.A.1265873835
Date: 2022.05.24 08:33:06 -04'00'
24 May 22
| 5Exhibit A CDRLS |
| 6 |
| 7Exhibit A CDRLS |
| 8 |
| 9Exhibit A CDRLS 2 |
| 69Exhibit A CDRLS 2 |
| Exhibit A CDRLS 2 |
| Exhibit A CDRLS 3 |
| Exhibit A CDRLS 4 |
| Exhibit A CDRLS 38 |
| Exhibit A CDRLS |
File details come from the government source that posted it. Updated .