W9098S21R0020 Amendment 0001.pdf

PDF 155 KB Posted

Attached to
Concrete Work - Mounting Pad for J-Hull Printer Federal contract opportunity
Solicitation number
W9098S21R0020
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Concrete Work - Mounting Pad for J-Hull Printer, newest first.
File Type Posted
W9098S21R0020 P00003.pdf PDF
W9098S21R0020 Amendment 0002.pdf PDF
Attachment 0002 - Site Visit Meeting Place Map.pdf PDF
Attachment 0004 - Visitor Safety Card.pdf PDF
Attachment 0001 - Concrete Work.pdf PDF
Attachment 0003 - Rock Island Arsenal Access Request Form.pdf PDF
W9098S21R0020.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W52H1B1208004K

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to include questions and answ ers as w ell change the solicitaion closing date.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9098S21R0020

X 9B. DATED (SEE ITEM 11)

24-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Sep-2021

CODE

ROCK ISLAND ARSENAL (ACC-RI)

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

W9098S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9098S21R0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 00001 NARRATIVE

The purpose of Amendment 00001 is to include questions and answers and to change the solicitation closing date.

QUESTIONS AND ANSWERS

1. Are we to supply and install grounding rods and wires? Also do embedded steel items need to be grounded?

Answer: Yes, a grounding rod will need to be installed but no wires are required. Embedded steel items do not need to be grounded.

2. Is the steel plate in the work area embedded or are we to provide a 3 inch recess for it to be installed? Who install the steel plate?

Answer: The steel plate is not embedded. Contractor will need to provide an recesses shown on the foundation drawing. Equipment manufacture and JMTC will be installing the plate.

3. Are we to include fabrication and or installing the wall mounted cable carrier support?

Answer: No

4. Is the UNISORB v1 grout for grouting in the anchors in the core drilled holes? Is this the foundation contractor’s responsibility or the contractor that installs the machines responsibility?

Answer: Please see attached detail from grouting. Grouting will be the responsibility of the foundation contractor.

5. Can you provide a basis of design for the liquid proof coating that is mentioned in the Foundation requirements section?

Answer: I do not have that and will not be able to get a basis of design prior to this needing to be quoted.

At this time, do not quote the liquid proof paint “required” after the machine is installed. Once more information is gather we will solicit this on a different contract.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 20-Aug-2021 12:00 PM to 15-Sep-2021 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .