AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please see Amendment 0001 Narrative.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9098S20Q0064

X 9B. DATED (SEE ITEM 11)

18-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jun-2020

CODE

ROCK ISLAND ARSENAL (ACC-RI)

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

W9098S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9098S20Q0064

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001 NARRATIVE

The purpose of Amendment 0001 to Solicitation W9098S20Q0064 is as follows:

1. To provide Questions and Answers received from industry below.

A. Question 1: Can you provide the linear feet of Fire Sprinkler Pipe that is to be primed, 2 topcoats applied and labeled?

Answer 1: No, there are no prints available to JMTC. It’s a best guess or time to measure. Prints have been provided w/ column spacing for dimensions.

B. Question 2: Can you provide pictures and dimensions of any guardrails that are to be painted? They are referenced in the specification, but I do no recall seeing any during the site visit?

Answer 2: Pictures have been provided. If required, they may be provided again. Like Fire Pipe, if vendor would like they may measure. The pictures will show if guardrails exists.

C. Question 3: Will the 70 row columns be removed or do they need to be painted as well?

Answer 3: Print provided provides comment on print indicating “Do Not Paint, to be removed by JMTC Personnel”.

D. Question 4: Will the crane rails be painted or will they be removed prior to any painting work?

Answer 4: No, cranes will be removed.

E. Question 5: Is the contractor to provide the drums and labels for lead based paint waste?

Answer 5: Yes, plus there must be reporting to the Public Works RIA-IMCOM Office Environmental Specialist.

F. Question 6: Will the work area be restricted to contractor personnel only during painting work?

Answer 6: Yes. But the work area will be limited to 25% to 50% of total scope. Full area will not be able to be given at any one time and we will shuffle product around to avoid contractor interferance.

G. Question 7: It was mentioned that Lead Abatement will be performed prior to painting. Is this correct and if so, when?

Answer 7: Please review Attachment 0001, RIPD E4000-20-3-08 and Statement of Work, and Attachment 0005, Clean and Paint Building 299 Lead Sample Results. The Contractor will perform any necessary lead abatement prior to painting.

H. Question 8: I noticed hazardous material storage tanks located in the work space. Will these be moved prior to painting? If so, will project staging be allowed for movement of materials in different locations of the work area?

W9098S20Q0064

Answer 8: Yes, on both moving or area staged for access. POC will be Plant Eng Staffer.

I. Qestion 9: Will power washing be allowed to clean walls prior to painting? If, so, I didn’t notice any floor drains.

Answer 9: Yes, but contractor will need to provide water reclaimation.

J. Question 10: Will the duct work located on the walls and in the painting scope need painting? Looks like the existing duct in the painting scope is painted.

Answer 10: If duct is painted, yes paint. Believe the only applicable duct is along side of the storage room and would like this to be painted as part of this contract.

2. The solicitation closing date has been extended from 09 June 2020 to 10 June 2020 by 4PM Central Time.

3. All other terms and conditions of Solicitation W9098S20Q0064 remain the same.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 09-Jun-2020 04:00 PM to 10-Jun-2020 04:00 PM.

(End of Summary of Changes)