Automated Storage and Retrieval Systems (ASRS) System Upgrade
Solicitation number
W9098S19T0066
Issued by

About this file

UPDATED FINAL - Questions and Answers - Solicitation W9098S-19-T-0066 - ASRS - 8Aug19 0700.._

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Questions and Answers - Soliciation W9098S-19-T-0066 - ASRS Rebuild - RIPD E4000-18-1-01 (8Aug19 07:00)

#QUESTION:ANSWER:
1What is the purpose of "Exhibit: CDRLs 0001 - RIPD E4000-18-1-01 - Contract Data Requirements List"?The CDRLs are contract deliverables that are required in the performace of the contract. These deliverables are required and your pricing for these deliverables must be included in your proposal.
System
1.1Crane aisles' length?Please Reference Attached Prints
2- aisle #1 (Large)141' 8" w/o Runout, 166' 8" with Runout
3- aisle #2 (UL)Same as Aisle 1
4- aisle #3 (mini-load)150' 1" w/o Runout
5- aisle #4 (mini-load)164' 2" with Runout
6- aisle #5 (UL)Same as Aisle 1
1.2Crane heights?Please Reference Attached Prints- Aisle Heights. Do not have crane heights
7- aisle #1 (Large)49' 9.75" Rack Height
8- aisle #2 (UL)48' 9.75" Rack Height
9- aisle #3 (mini-load)39' 9.25" Rack Height
10- aisle #4 (mini-load)Same as Aisle #3
11- aisle #5 (UL)Same as Aisle #2
1.3Rack? # of position per aisle?
(# of bay? # of bin / bay? # of levels? Rack depth?):15,468 Storage bins. Do not have the (by aisle) data.
12- aisle #1 (Large)Estimated (712 64x44 bins)(156 128x44 bins)
13- aisle #2 (UL)Estimated (1536 bins)
14- aisle #3 (mini-load)Estimated (5704 bins)
15- aisle #4 (mini-load)Estimated (5704 bins)
16- aisle #5 (UL)Estimated (1536 bins)
1.4P&D config? (# of zones IN&OUT, special features / functions?)Please Clarify. What information are you looking for? Clarification: Requesting an accurate conveyor layout with defined zones if available. There are no accurate layouts that we could find that define zones. Below is an explanation of the zones and their function as well as any special features.
17- aisle #1 (Large)5 Zones including: Workstation/Material Pickup, Palletizer, Travel Zone that brings items from drop-off zone, 2 drop off zones at the end of the conveyor that pushes/recieves materials from the shuttles. Special Features: Chain Lifts to raise loads on following zones (Palletizer, Travel Zone, Drop-off Zones).
18- aisle #2 (UL)Lift Table where product is dropped, Travel Zone, Directional change zone with Chain Lifts, weight scale zone, directional change zone with chain lift, travel zone, chain lift zone, pick up zone. Special functions of this line is that the pallet accumulator is attached to this conveyor system.
19- aisle #3 (mini-load)Aisle 3+4 are the same except mirrored. They have a drop-off zone, travel zone that includes the section of conveyor that the operator picks from, chain lift travel zone which moves material from one side of the conveyor to the other where it goes through a travel zone to get to the pick up zone. Special Features of these lines are that there are plastic lift bars on the drop-off zone, the pick-up zone, and then the operator pick station. The load cell is located under the operator pick area.
20- aisle #4 (mini-load)
21- aisle #5 (UL)Aisle 5 is essentially the same as aisle 2 except the pick up and drop off zones are composed of lift tables rather than chain lifts
1.5Bottom approach?Please Clarify. What information are you looking for? Clarification: N/A. Measurements taken during site visit.
22- aisle #1 (Large)
23- aisle #2 (UL)
24- aisle #3 (mini-load)
25- aisle #4 (mini-load)
26- aisle #5 (UL)
1.6Top approach?Please Clarify. What information are you looking for? Clarification: N/A. Measurements taken during site visit.
27- aisle #1 (Large)
28- aisle #2 (UL)
29- aisle #3 (mini-load)
30- aisle #4 (mini-load)
31- aisle #5 (UL)
1.7Crane run-out available? Front? Rear?Please Reference Attached Prints- Assuming this is the rail that extends past the racking
32- aisle #1 (Large)132" Rear, 168" Front
33- aisle #2 (UL)132" Rear, 168" Front
34- aisle #3 (mini-load)110" Rear, 59" Front
35- aisle #4 (mini-load)Same as Aisle #3
36- aisle #5 (UL)Same as Aisle #2
1.8Rates? / Performance? (Loads IN/OUT per hr?)20 picks per hour minimum. Do not have current performance data due to cranes inefficiency
37- aisle #1 (Large)
38- aisle #2 (UL)
39- aisle #3 (mini-load)
40- aisle #4 (mini-load)
41- aisle #5 (UL)
421.9Mini-load replacement vs. upgrade? (phase 7? Aisle #4?)
Please Reference Section 9 of the RIPD for Mini-load replacement. Section 10 is in reference to Section 9 not Section 8. An updated RIPD will be released with the fix.
Material to be handled
2.1Dimensions (LxWxH)?Approximate Carrier type dimensions. Material dimensions vary greatly
43- aisle #1 (Large)44"x64" or 44" x 128"
44- aisle #2 (UL)50" x 42"
45- aisle #3 (mini-load)50" x 24" with varying heights
46- aisle #4 (mini-load)See Q45
47- aisle #5 (UL)See Q44
2.2Weights (Typical? Max?)
48- aisle #1 (Large)Max=5000lbs
49- aisle #2 (UL)Max=2500lbs
50- aisle #3 (mini-load)Max=500lbs
51- aisle #4 (mini-load)Max=500lbs
52- aisle #5 (UL)Max=2500lbs
2.3Carrier type? reference? design?

(pallet type? Bin? Tote? Tray? Bottom boards...?)

53- aisle #1 (Large)Plywood Slave Board or Steel Load Deck
54- aisle #2 (UL)Plywood Slave Board
55- aisle #3 (mini-load)Galvanized Pans
56- aisle #4 (mini-load)Galvanized Pans
57- aisle #5 (UL)Plywood Slave Board
General / Phases
583.1Bill of Materials. Is the full BOM with vendor part numbers required as part of the deliverables to RIA?
Is this pre-contract award or post award? Equipment Identification is a technical evaluation factor. Clarification : Is BOM with vendor part numbers required as part of the pre-contract award?

As a deliverable of the project, we will be supplying a complete BOM with vendor specific part numbers.

Equipment Identification is part of the Technical Evaluation Criteria, the more information that is provided for the system make up of components, the easier it is to evaluate. I can only tell you to look at the evaluation criteria for equipment identification.
593.2Phase 1 - Section 4.2: Will the rail inspection and grinding be able to take place at any time during Phase 1 work, or does this need to be done at Contract award + 77 days, as not explicitly spelled out in the ASRS Rebuild Timeline document.Rail inspection and grinding can take place at any reasonable time during Phase 1 as long as the downtime for each line is minimized. For example: (All 5 cranes should not be down at the same time for rail inspection and grinding.)
603.3Phase 1 - section 4.2: If rail replacement is deemed necessary to support the replacement of the miniload aisle, will rail grinding be peformed on the aisle in question to support continued operation until replacement, or will there be no rail grinding on the aisle until replacement?Either option will work.
613.4Schedule durations: should we stick exactly to the provided scheduled or present best schedule (by Han-Tek)
The schedule and requirements provided are minimums. If a bidder is able to submit a better schedule while keeping the idea of controlled downtime in mind, then that bidder can do so.
623.5Once awarded, would it be possible to have access to spare parts to reverse-engineer some crane pieces?
Not many spare parts exist for our system but the awardee will have access to them if necessary.
Controls
635.1Phase 2 - section 5.2: Will PLC programs with descriptions be supplied at contract award for re-creating the host protocols, or should the selected vendor plan to perform line monitoring to reverse engineer the protocols from the existing WMS?The PLC programs will be supplied at contract award for the re-creation of the host protocols.
645.2Crane/Conveyor sensor replacements are not mentioned anywhere? In/out scope? Recommendations?
Please reference Section 1 of the RIPD. "The contractor shall provide all labor and materials needed to satisfy the requirements described within this purchase description to rebuild the existing ASRS along with all necessary components and labor (listed or not) to provide an efficient fully functional and safe system."
655.3Current crane safety devices? Functional/Obsolete/Replacement?
Please reference Section 1 and 2 of the RIPD.
665.4Crane/Conveyor safety performance level required? Plb,Plc,Pld,Ple, or no requirements?
Please reference Section 1 and 2 of the RIPD. The equipment must comply to all the standards that are listed in Section 2. If this is a standard that is not listed in Section 2, but is a known standard for this type of equipment, then it must be fulfilled.
675.5Cab/Manual Operator Controls? Need to be replaced?
Please reference Section 1 and 2 of the RIPD
685.6Aisle Safety is not mentioned anywhere? Access gates, light curtains, fencing, etc…
Please reference Section 1 and 2 of the RIPD as well as the answer to Q66
695.7Crane(s) control from EOA HMI? Or only from WCS stations?
The cranes are able to be operated in Manual Mode from the rear control panels of the Storage and Retrieval Machines
705.8Performance? Axis speeds requirements? Current?
The proposed solution must meet or exceed the current performance capabilities. Current performance data is not available at this time.
715.9Power coming IN? (Voltage? Phases? Amps?)
Please reference Section 3.2.8 of the RIPD for available utilities
725.10How many PLCs is there currently? (1 per crane (= 5) + 1 for the conveyors?)
1 per crane, 4 for the conveyors. There are also 3 for the palletizers connected to the system
Software
736.1Phase 1 - Section 4.1.1 mentions that a new WCS will be implemented to interface to the existing WMS-PLC equipment.
Is the expectation that an interim system for warehouse control be implemented to allow the Lantronix to be upgraded to the Pearle Terminal Servers, or would any required O.S. modifications to the existing WMS system be allowed to enable confiugration and setup of the serial ports to the end devices?We understand that a transition will be necessary. All we can say is that the system needs to be operational during the transition.
746.2Phase 2 - section 5.1.5 Will a copy of the WMS host protocol be available at contract award, or should line monitoring be planned to reverse engineer this protocol?JMTC does not have the ASCII code required to provide. Current contractor has codes and JMTC will request codes. If unable to obtain, Vendor will be required to reverse engineer.
756.3Phase 2 - sectoin 5.2: Will IDOC files or flat files samples be supplied at award of contract? Is there a current preference between the two methods of data transfer?Flat files will be utilized and samples will be made available
766.4Phase 2 section 5.2.2.4: Are there specific requirements around items with expiration dates? Does the new WMS system need to communicate anything special regarding this type of item when items do go past their expiration date?Section 5.2.3.2 of the RIPD lists expiration date as a reporting function for tracking purposes to alert operators of an item being close or past its expiration date.
776.5Phase 2 - section 5.2.3.2: Do reports have to be generated or exported to any particular formats?
Excel would be ideal.
786.6Phase 2 - section 5.3: Are the specific transaction designs for the LMP interface included in the current ASRS timeline of work? Will the government work with the selected vendor on definition of the interfaces?Yes and Yes
796.7Phase 2 - section 5.3.4.5: What type of encryption is expected for the ASRS to LMP communication?
Data in transit will be encrypted using FIPS 140-2
806.8Phase 2 - section 5.3.5: Will the unit testing be planned to be on-site at RIA, or would a test environment for off-site testing be provided?
On-site at RIA
816.9Phase 2 section 5.3.6: Typically a functional design and messaging interface specification is generated during the design phase, which details the operation of the software and the specific breakdown and usage of all messages. Will this suffice for documentation under this heading?No, JMTC is looking for " The contractor will provide descriptions of Order and Material software functions available for storage and retrieval"
826.1Phase 2 - section 5.3.9: Will the new ASRS control software be responsible for printing the Material Movement tags, or will this be under LMP?
As long as the ASRS control software communicates with LMP, we are not sure if it matters. Currently, the ASRS system handles the printing of the tags. UPDATED: Material Movement tags will be printed out of the new ASRS system.
836.11Phase 2 - section 5.3.9: How soon after contract can the data conversion file be supplied?
Timeframe is dependant on required formating from vendor for the new system
846.12Phase 2 - section 5.4.2: Does the government have a preferred operating system and version to be included in the specification?

- Could we use Windows but run a linux VM?

- Could we use a Docker environment to virtualize linux on Windows?Windows server 2012 R2 or Windows Server 2016, Red Hat Linux 7. Virtualization is possible with a compliant operating system such as Vmware ESXI 5 vSphere 6.5 or Microsoft Hypervisor.
856.13Will the awarded contractor be able to deploy some software changes / revisions remotely?
Due to network restrictions, remote access will not be available for this project
Install
867.1Unloading areas?
Reasonable unloading areas will be provided once the government has a better idea of what will be required by the awardee.
877.2Dock doors? And/or ground level access?
There is ground level access into the ASRS area by means of a large double door in the rear of the ASRS area.
887.3Equipment staging areas?
Reasonable equipment staging areas will be provided once the government has a better idea of what will be required by the awardee.
897.4Install area accesses? (lift equipment? New Mini-load? Paths?)
This will be determined once the government has a better idea of what will be needed by the awardee. There is floor level access to the ASRS area by means of a large double door in the rear of the ASRS area.
90What are the Pallet capacities for each of the cranes?Please See Q43-Q57
91Can we get Pictures from inside the conveyor control cabinet?Please see attached photos.
92Hourly rate of each crane – how many cycles of a pick and put per hour?Please see Section 1.8 of the Questions list
93What is the height off the floor for the conveyors?31.25" to the top of the rollers
94What are the requirements for badge access into the facility – can personnel complete the application and get access on the first day of the project with paperwork sent ahead of time or does a special trip need to be made prior to project start for all personnel.Please reference the Visitor Delivery Instructions attachment regarding the badging process.
95What is the access for bringing in new cranes? Do you have roof access that we can bring one in from above?There is no roof access. There is floor level access by means of a large double door.
961.1Requested photographs for all motor nameplate data (all 5 cranes) (all axes) or spreadsheet containg the data.Please see the electrical diagrams for baseline hp data.We are trying to get these sent, however they are not guaranteed
Aisle 1Hoist Motor= 25hp 3-phase (3600/600 RPM Frame) Travel Motor= 20hp DC Fork Motor (FORE)= 1.43/.24 hp 3420/500 RPM 3-Phase Fork Motor (AFT)= 1.34/.24hp 3420/500 RPM 3-phase
Aisle 2Hoist Motor= 19.1hp 3600 RPM (SYN.) Frame Travel Motor= 20hp DC Fork Motor (FORE)=1.43/.24 hp 3420/500 RPM 3-Phase Fork Motor (AFT)=1.34/.24hp 3420/500 RPM 3-Phase
Aisle 3Extractor Motor= 3/4 hp, Hoist Blower motor= 1/3 hp, Travel motor= 5.4 hp(1730 RPM) 3-Phase Hoist Motor= 7.5hp(1720 RPM) 3-Phase
Aisle 4Same as Aisle #3
Aisle 5Same as Aisle #2
971.2Requested photographs for all gearbox nameplate data (all 5 cranes) (all axes) or spreadsheet containing the data.Please see the electrical diagrams for baseline hp data.
981.3Requested any and all available electrical schematics (pdf format)Please see attached prints
991.4Requested any and all available crane mechanical drawings (pdf format)Please see attached prints
1001.5Requested any and all available rack/aisle layout drawings (pdf format)Please see attached prints
1011.6Requested clarifications on working hours for installation crew(s) (Daily/Weekly)Please reference Section 12.2.11 of the RIPD. Special Accomodations outside of the requirements listed can be arranged based on the situation at that time.
1021.7Requested any and all available detailed mechanical drawings for shuttles to be rebuilt. Or at least photographs of shuttles extended/retracted for component estimation. (Reverse engineered after contract award)Please see attached photos.
1031.8Requesting conveyor load(s) cells information. Manufacturer, part numbers, etcAisle 2+5: RICE LAKE WAYNE SYSTEMS Model 4x5HP-5K Class:III S/N:C12289 Aisle 3+4: Weigh-Tronix Model: DS-O1A Cap: 1000lbs Size: 30x30. Aisle 1: Weigh-Tronix Model: DS 10. Size: 84 x 60. Cap: 10000
1041.9Requested clarification on 6.1.8 Shuttles, "The Interlake shuttle tubes (2 units per crane) will be replaced. Please identify what shuttle tubes are or referencing.Be advised, this was a typo. The correct verbiage is shuttle tables. This has been updated in the revised RIPD.
1052.1Section 8.1.11 Damaged shock absorber. Requesting manufacturer, part number and or dimensions for replacement.ENIDINE P/N SP5537
1062.2Requesting information regarding sheaves that need to be replaced. Manufacturer, part numbers, any technical specifications available.We were not able to find any information on the sheaves.
1072.3Requesting information regarding maximum weights of unit loads for aisles 1,2, and 5 regarding the shuttle(s) mechanical upgrades/replacement.Please see the answers to Q48-Q52
1082.4Requesting all control panel dimensions for cranes 1, 2, and 5.Control Panel Enclosure Dimensions (95" H x 35.5" W x 20.5" D)
Recommendations (How will these be addressed?) Options to RFP?
1094.1Power rail & crane collector shoes should be replaced during upgrade of cranes 1,2, and 5.Please reference Section 1 of the RIPD.
1104.2Crane(s) mechanical safety brakes should be tested for functionality and determine if replacement is necessary.Please reference Section 1 and Section 2 of the RIPD
1114.3Crane(s) overspeed switches should be tested for functionality to determine if replacement is necessary. (per ASME B30-13.1.10.8)Please reference Section 1 and Section 2 of the RIPD
1124.4Cranes 1,2, & 5 all operator cab mounted control devices should be upgradedPlease reference Section 1 and Section 2 of the RIPD
1134.5All crane mounted sensors should be replaced and rewired to the new panels. Ie,,,Pecs, proximity switches, etc…Please reference Section 1 of the RIPD
1144.6Safety fencing with access gates should be mounted in the maintenance area/runout, to prevent access to individual crane aisles.Please reference Section 1 and Section 2 of the RIPD
1154.7Rail grinding will not take place for both mini-loads (aisles 3 & 4) rails during Phase I.Please refer to the answer to Question #60 in this document
1164.8RIPD: E4000-18-1-01 document reissued with updated section numbering and text referencing. Ie....Section 10.1, Phase 7.Please see the revised RIPD
117RIPD Section 11.1

Mentions ControlLogix PLC. This is currently installed and is controlling all conveyors correct?

The (4) obsolete Micrologix 1200 PLCs are controlling the sizing, weigh scales, and slave board dispensers correct? And will be upgraded.

The main enclosure has an Allen Bradley SLC 504 PLC which is controlling all conveyors. As part of Phase 2 in the RIPD, it is to be replaced by a ControlLogix PLC or equivalent. This will communicate with the Micrologix 1200's until Phase 8 when they are to be replaced by Micrologix 1400's or equivalent. Please reference Section 5 and 11 for this verbiage.
ADDITIONAL QUESTIONS AND ANSWERS
Gearbox DataAisles 1,2,5 all have same gearbox data for hoist and horizontal motors
Motor TypeHoist
TypeK120A
S.O850024822.6.20.85 .001
Ratio129.5:1
ClassI
Torque88500
Mounting PositionB6IIAB
Motor TypeHorizontal
ModelSHU60A104-C4
Model Option0103
Cust P/NNPD-4027
Ratio15-1
Input RPM1585
Shuttle Table Dimension
Aisle 1Approximately 40" down aisle x 45" cross aisle
Aisle 2 and 5Approximately 20" down aisle x 45" cross aisle

Tread Plates (Operator Platforms) Approximately 40" x 35"

Sheaves Approximately 6 per crane, no spec data

Idlers There are two drums on the gearbox. All pulleys are idler pulleys.