Attachment 0002 - CDRLs

View the file

Other files

File Type Posted
12-R-0054-0001.pdf PDF
Attachment0005.pdf PDF
12-R-0054.pdf PDF
Attachment0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 3 Pages

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

D. SYSTEM/ITEM

Die Forging Hammer

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Installation Drawing

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

6. REQUIRING OFFICE

7. DD250 REQ

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide (1) copy of this information in paper format, with exception the footprint/and schematics file which shall be electronic

(.pdf format or autocad). The contractor shall provide a second copy of this information in paper format at the time of delivery of the equipment.

The Installation and Preparation Manual should include Installation and

Documentation Inventory List, a footprint drawing of the machine, foundation drawing, electrical schematic, hydraulic schematic, and a water piping schematic. Utility schematics should denote minimum feed requirements to be provided by Rock Island Arsenal. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files

(.dxf), and initial graphic exchange specification (.igs). Locations of the first point of connection for all required utility/power sources shall be shown and dimensioned. Finally, shipping information shall be provided listing the machine components, and approximate gross weight of each separate component.

PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:

Rock Island Arsenal

ATTN: TARA-MOE

Kent Stone Bldg 210, Rm 301 Rock Island, IL 61299-6400

15. TOTAL

G. PREPARED BY

Kenneth V. Nabb

H. DATE

August 16, 2012

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 3 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

D. SYSTEM/ITEM Wet Magnetic Particle Die Forging Machine

2. TITLE OF DATA ITEM

Maintenance Manual

3. SUBTITLE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide (3) copies of the Operator/Service manual with delivery of each piece of equipment, or system. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs). The manual shall include the following minimum information, procedures and drawings.

1. Safety Lockout Procedure: Written procedure shall be provided detailing procedures to deactivate the equipment brfore beginning repair activities on the equipment.

2. Preventative Maintenance Procedures: This section of the documentation shall include: Daily Operator Checklist, Visual Inspections, and a Lubrication Schedule of the equipment provided. Procedures and schedules for inspections, adjustments, cleaning, and component replacements.

3. Lubrication: This will include a drawing and detailed instructions and procedures.

The drawing will depict the location of each lubrication point and indicate the type, viscosity, frequency, approximate quantity of the lubricant to be used. All lubrication documentation shall be referenced to this drawing.

4. Replacement Component List: This list shall contain every replaceable component in the equipment. It shall include appropriate identification and ordering data including, but not limited to, the contractor, vendor and original equipment manufacturer (OEM) part names and numbers. Enough information shall be included to allow ordering of the component from the contractor, vendor, or OEM.

Rock Island Arsenal, ATTN: TARA-MOE, Kent Stone, Bldg 210, Room 301

Kenneth V. Nabb

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 3 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

D. SYSTEM/ITEM Wet Magnetic Particle Inspection Machine

2. TITLE OF DATA ITEM

Operators Manual

3. SUBTITLE

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide (3) copies of this all schematics with machine delivery. Of these, (2) will be paper, and (1) shall be electronic.

Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).

Rock Island Arsenal

ATTN: TARA-MOE

Kent Stone Bldg 210, Room 301

Kenneth V. Nabb

H. DATE

File details come from the government source that posted it. Updated .