12-R-0054.pdf

PDF 193 KB Posted

Attached to
Forging Hammer
Solicitation number
W9098S12R0054
Issued by

About this file

Forging Hammer per RIPD N2000-14-1-17 100 SBSA Proposals due 26 November 2012

View the file

Other files

File Type Posted
12-R-0054-0001.pdf PDF
Attachment0005.pdf PDF
Attachment0002.pdf PDF
Attachment0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK ISLAND ARSENAL

JOINT MANUFACTURING & TECHNOLOGY CENTER

BLDG 211 RODMAN AVENUE

1 ROCK ISLAND ARSENAL

ROCK ISLAND IL 61299-6400

309-782-6727

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

Employees

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

W9098S-12-R-0054 23-Oct-2012

b. TELEPHONE NUMBER

309-782-1598

8. OFFER DUE DATE/LOCAL TIME

03:00 PM 26 Nov 2012

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

W9098S

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE W52H1B 16. ADMINISTERED BY

TRANSPORTATION OFFICER, W52H1C

TRANSPORTATION OFFICER

BLDG 299, EAST END

RECG DOOR 16A

ROCK ISLAND IL 61299-5000

TEL: FAX:

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

SABRINA L. LOWE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

333513

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: 100 % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

AW83002200MOE1

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

W9098S-12-R-0054

Section SF 1449 - CONTINUATION SHEET

EVALUATION CRITERIA

1. It is the vendor’s responsibility to submit a proposal that conforms to all the terms and conditions of the solicitation and contains the vendor’s best offer. Failure to provide all the data required with the package may result in elimination from consideration. The Government intends to award without discussions, however reserves the right to open discussions if it determines they are necessary.

2. Your proposal will be evaluated as shown below. If a NO-GO rating is received at any stage of the evaluation your proposal will not move on to the next stage of review and shall be considered unacceptable.

3. Technical:

Subfactor 1 Experience: Each vendor shall provide information regarding your experience in manufacturing, supplying, and / or offering for sale in the regular course of business, three (3) years preceding this solicitation, the type of equipment requested in this solicitation. Each offeror shall provide the following as evidence:

Published Data: Each bidder shall provide a brochure, catalog, or published data describing the equipment offered.

References: Each bidder shall provide contact information (including at least company name, contact name, contact telephone number, and a description of the equipment the contact purchased including manufacturer and model number) for a minimum of three (3) projects of similar scope and scale. For projects to be considered similar the vendor shall have previously supplied and installed Hydraulic Forging Hammers with per blow energy equal to or greater than 16 kilo-joule (118,000 foot-pounds).

Based on the documentation received, references provided, and any information that the Government obtains from the World Wide Web, a GO rating will be given if your company has 3 years of relevant experience manufacturing, providing, or offering for sale the type of equipment requested in this solicitation. A NO-GO rating will be given if your company does not have 3 years of relevant experience manufacturing, providing, or offering for sale the type of equipment requested in this solicitation.

Subfactor 2 RIPD Compliance: Your proposal will be evaluated based on the line-by-line compliance statement submitted. A compliance statement that is fully compliant or has minor non-compliances as determined by the Government will be given a GO rating.

Compliance statements that do not comply with the areas of the RIPD that are determined major by the Government will be given a NO-GO rating.

4. Price:

Those offerors that receive a GO rating, their offers will be evaluated on the prices proposed for all CLIN’s and options (if applicable) and any other pricing factors required by the solicitation.

For each proposal, the Government will calculate the Total Evaluated Price for all CLIN’s.

Total Evaluated Price is the sum of all the evaluated CLIN’s.

Vendors must submit a price for all CLIN’s to be considered for award.

Vendors shall make their proposed pricing valid for up to 1 year from date of their proposed offer.

The Government intends to award to the lowest priced, technically acceptable proposal.

INSTRUCTIONS TO OFFERORS

1. Vendor’s must submit their proposals in a single submission prior to the closing date and time listed on page one of this solicitation.

2. The proposal shall be submitted in three (3) sections as set for the below:

a. Section 1: Technical Subfactor 1: Experience Subfactor 2: RIPD Compliance

b. Price

3. Section 1: Technical

Subfactor 1: Experience: Your proposal shall include information regarding your experience in manufacturing, supplying, and /or offering for sale in the regular course of business, the type of equipment requested in this solicitation. Both of the following shall be provided as evidence:

Published Data: Each bidder shall provide a brochure, catalog, or published data describing the equipment offered.

References: Each bidder shall provide contact information (including at least company name, contact name, contact telephone number, and a description of the equipment the contact purchased including manufacturer and model) for a minimum of three (3) projects of similar scope and scale. For projects to be considered similar vendors shall have previously supplied and installed Hydraulic Forging Hammer with per blow energy equal to or greater than 16 kilo-joule (118,000 foot-pounds).

Subfactor 2: RIPD Compliance: Each vendor shall provide a statement of compliance. It shall be a copy of the purchase description (RIPD). At the end of each and every paragraph the vendor shall type or write exactly either “COMPLY” or “NON-COMPLY”. Other formats will not be considered acceptable. If a “NON-COMPLY” is written, a brief description of the noncompliance is required.

Each vendor shall identify the manufacturer and model number of the equipment being offered.

4. Section 2: Price:

A firm fixed price for CLIN 0001 of this solicitation is required. The offerors shall enter firm fixed prices for all CLIN’s at the CLIN level of this solicitation. The offeror shall identify items that are not normally numbered for ordering such as Installation or Freight charges.

All unit prices proposed will be binding. The Government reserves the right to require the submission of any data necessary to validate the reasonableness of the proposal.

Vendors must provide a firm fixed price for CLIN 0001. Failure to quote everything will result in your offer being unacceptable.

SOLICITATION NARRATIVE

1. This solicitation is for one (1) Die Forging Hammer per Rock Island Purchase Description (RIPD) N2000-14-1- 17 dated 19 July 2012. Your proposal must include adequate information to show compliance with the Government’s minimum requirements. Your proposal should clearly identify the product that is being offered.

2. Your attention is directed to FAR clause 52.212-2 entitled “Evaluation – Commerical Items”, DFARS clause 252.209-7999(dev) entitled “Representation by Corporations Regarding Unpaid Taxes”, Instruction to Offerors, Evaluation Criteria, Attachment 0001 RIPD N2000-14-1-17, Attachment 0002 CDRLs, Attachment 0003 Drawing, and Attachment 0004 Non-Disclosure Agreement.

3. The following timeline is based upon the contract award date and the number of calendar days between events.

Time allocations a maximum for each stage. It is acceptable to complete a stage in fewer days than shown on the timeline and move on to the next phase.

Timeline for CLIN 0001 is as follows:

Contract Award……………………………….….Contract Award Installation and Preparation Drawings…………...Contract Award + 120 Days Equipment Delivery to RIA……………………...Contract Award + 365 Days Machine Acceptance and Training Complete……Equipment Delivery + 60 Days Final Acceptance…………………………………Training Completion + 0 Days

Total Maximum Time from Award to Acceptance ….Contract Award + 425 Days

The final delivery date shown in the delivery schedule section will be 425 calendar days from the date of contact award. Early deliveries are authorized.

4. Payment schedule for this award will be as follows:

Contractor Receipt of Machine Frame Castings………30% Government Receipt of Machine………………………40% Final Acceptance………………………………………30%

5. Your proposal must include a minimum warranty of one (1) year parts and labor and will begin upon final acceptance.

6. This solicitation is Subject to Availability of Funds per FAR 52.232-18. Award will be made to the lowest price technically acceptable offer upon funding becoming available. Therefore, proposals shall be valid for one (1) year.

OPSEC ADDITIONAL INFORMATION

IMPACT ON CONTRACTOR PERFORMANCE DURING INCREASED FPCON DURING PERIODS OF

INCREASED THREAT. During FPCONs Charlie and Detla, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP) PARTICIPATION. Contractor personnel working on an installation are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc), ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each

FORGING HAMMER

FFP

Description: Forging Hammer per Rock Island Purchase Description (RIPD) N2000-14-1-17 dated 19 July 2012.

Attachment 0001 - RIPD Attachment 0002 - Contract Data Requirement List (CDRL) Attachment 0003 - Drawing Attachment 0004 - Non-Disclosure Agreement (NDA)

A Contracting Officer Representative (COR) will be assigned at the time of award issuance. See DFARS clause 252.201-7000.

This solicitation is Subject to Availability of Funds. See FAR clause 52.232-18.

Quotes shall be valid for 1 year.

FOR RIA INTERNAL USE ONLY

Customer Number: AW83002200MOE1 LMP Number:

RIA12-14EQ-91

FOB: Destination

PURCHASE REQUEST NUMBER: AW83002200MOE1

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 425 dys. ADC 1 TRANSPORTATION OFFICER, W52H1C

TRANSPORTATION OFFICER

BLDG 299, EAST END

RECG DOOR 16A

ROCK ISLAND IL 61299-5000

FOB: Destination

W52H1B

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government

(Sep 2006) -- Alternate I

OCT 1995

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 Central Contractor Registration AUG 2012 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

DEC 2010

52.211-15 Defense Priority And Allocation Requirements APR 2008 52.212-1 Instructions to Offerors--Commercial Items FEB 2012 52.212-4 Contract Terms and Conditions--Commercial Items FEB 2012 52.212-5 (Dev) Contract Terms and Conditions Required to Implement

Statutes or Executive Orders--Commercial Items (Deviation)

AUG 2012

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns JAN 2011 52.219-14 Limitations On Subcontracting NOV 2011 52.219-28 Post-Award Small Business Program Rerepresentation APR 2012 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies MAR 2012 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-35 Equal Opportunity for Veterans SEP 2010 52.222-37 Employment Reports on Veterans SEP 2010 52.222-50 Combating Trafficking in Persons FEB 2009 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.229-3 Federal, State And Local Taxes APR 2003 52.232-11 Extras APR 1984 52.232-17 Interest OCT 2010 52.232-31 Invitation to Propose Financing Terms OCT 1995

52.232-33 Payment by Electronic Funds Transfer--Central Contractor Registration

OCT 2003

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-13 Bankruptcy JUL 1995 52.242-15 Stop-Work Order AUG 1989 52.243-1 Changes--Fixed Price AUG 1987 52.246-16 Responsibility For Supplies APR 1984 52.247-34 F.O.B. Destination NOV 1991 252.204-7000 Disclosure Of Information DEC 1991 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A Central Contractor Registration Alternate A SEP 2007 252.209-7001 Disclosure of Ownership or Control by the Government of a

Terrorist Country

JAN 2009

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country

DEC 2006

252.211-7003 Item Identification and Valuation JUN 2011 252.212-7000 Offeror Representations and Certifications- Commercial

Items

JUN 2005

252.225-7002 Qualifying Country Sources As Subcontractors JUN 2012 252.225-7012 Preference For Certain Domestic Commodities JUN 2012 252.225-7013 Duty-Free Entry JUN 2012 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment MAR 1998 252.246-7000 Material Inspection And Receiving Report MAR 2008 252.247-7023 Transportation of Supplies by Sea MAY 2002 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.0000-4001 CLAUSES/SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

(FAR 52.252-1/52.252-2)

This solicitation incorporates one or more clauses and/or solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a clause or solicitation provision may be accessed electronically at these addresses:

http://farsite.hill.af.mil/; http://www.arnet.gov/far/; http://akss.dau.mil/jsp/default.jsp;

http://home.ria.army.mil/sites/ctclauses/riaclaus.htm. (End of clause/provision)

52.0000-4002 SHIPPING/DELIVERY INSTRUCTIONS AND INFORMATION (OCT 2007)

1. THE COMPLETE 13-DIGIT PURCHASE ORDER, DELIVERY ORDER, OR CONTRACT NUMBER (The Number that starts with W9098S----) MUST BE ON THE OUTSIDE OF THE SHIPPING CONTAINER. This number must also appear on all packing slips, invoices, bills, or any communications regarding this order.

2. A Packing List must be included with each shipment.

3. Any excess quantity delivered, that is not covered by a Variation in Quantity clause, is subject to rejection.

4. SHIPMENT OR DELIVERY TO ANY ADDRESS OTHER THAN THE “SHIP TO” ADDRESS

DESIGNATED IN THE PURCHASE ORDER/DELIVERY ORDER/CONTRACT (Block 14 of the DD1155, Block 15 of the SF1449, or Block 11 of the SF 26) MAY RESULT IN A DELAY IN PAYMENT.

5. ANY CHANGE IN THE “SHIP TO” ADDRESS MUST BE APPROVED BY A WRITTEN CONTRACT

MODIFICATION FROM THE CONTRACTING OFFICER.

6. Information from FAR clause 52.232-25, Prompt Payment (FEB 2002), Paragraph (a)(5)(i): For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities. (End of Provision)

52.0000-4003 SAFETY & SECURITY NOTICES (JUL 2005)

ARSENAL ISLAND SAFETY REQUIREMENTS

1. All Contractors and Contractor personnel coming on to Arsenal Island must comply with the Rock Island Arsenal/Joint Manufacturing and Technology Center (RIA/JMTC), other Arsenal Island safety requirements and all federal, state, and local safety laws and regulations.

2. Contractors must provide their employees with, and the employees must use, all required safety equipment necessary for the work they are performing and/or the areas they are in.

3. This includes safety glasses, safety shoes, proper clothing, proper protective equipment and rigging.

4. All drivers on Arsenal Island must use seatbelts at all times when driving a motor vehicle.

5. If in doubt about any safety requirements, contact the Safety Office, AMSTA-RI-SF, 309-782-0207.

PHOTOGRAPHIC EQUIPMENT RESTRICTIONS

Reference: Commander’s Policy Memo A-23, 18 March 2004. There are restrictions on the use of photographic devices in all non-public areas of Arsenal Island. This includes digital cameras, cell phones and PDAs with cameras. You must get permission from the Security and Intelligence Division, AMSTA-RI-FPS, second floor, bldg. 102, 309-782-2871, to use any type of photographic device in any non-public area on Arsenal Island.

(End of Notices)

52.0000-4035 ROCK ISLAND ARSENAL SAFETY, LAW ENFORCEMENT, SECURITY, AND FIRE

PREVENTION REQUIREMENTS/REGULATIONS (AUG 2004)

THIS CLAUSE APPLIES WHEN THE CONTRACTOR ENTERS ROCK ISLAND ARSENAL ISLAND.

a. ROCK ISLAND ARSENAL SAFETY, LAW ENFORCEMENT, SECURITY, AND FIRE PREVENTION REQUIREMENTS. Any contractor personnel entering Rock Island Arsenal (RIA) as the result of this order/ contract are required to adhere to all regulations governing safety, law enforcement, security, and fire prevention in effect at the time of entrance. Failure to comply with said regulations may result in immediate removal from RIA.

The contractor shall bear full responsibility of the consequences of said removal. Further clarifications of RIA regulations are available from the Contracting Officer for this order/contract.

b. SECURITY REGULATIONS. The contractor and employees shall meet the following special security conditions.

1. SECURITY BADGES: ALL CONTRACTORS who are performing construction or service work within the confines of Rock Island Arsenal will be required to obtain a Security Badge. Contractor personnel will, prior to or on the beginning date of work, report to the Security and Intelligence Division specified below. The type of badge issued and authorization for the badge will depend on the duration of the contract.

(a) Temporary Badges will be issued at the Security Desk located in building 23 when the contract is less than 30 days in duration. Prior to the badge being issued, the contractor will complete a SIORI Form 190-31, Validation Pass. Security personnel will then obtain verbal authorization from the Contracting Officer (CO), Contractor Officer Representative (COR) or the Contractor Authorized to Sign (CAS), as appropriate, to issue a badge to a contractor.

(b) Permanent or picture-type installation badges will be issued at the Security Desk located in building 102 when the contract exceeds 30 days in duration, the contractor is employed full-time on Arsenal Island (4-5 days a week) and resides in the local community (within 100 miles). The contractor will complete a SIORI Form 190-24 (Contractor Employee Record) and the record will be signed by the CO, COR or the CAS, as appropriate. Upon completion, a badge will be issued for the duration of the contract, however, a badge will not be issued for longer than a five year period.

(c) Lost badges will be reported to the Security Desk at building 23 as soon as possible. Contractors with permanent picture-type badges will receive a temporary two- week badge to allow sufficient time for the badge to be found. If the badge has not been found after the two-week period, a Lost Badge Report will be completed by the contractor, and a new permanent picture-type badge will be issued.

(d) Contractors are required to display installation badges above the waist in a conspicuous place on the upper part of the body on the outer clothing. Security badges are accountable and are required by the recipient to be safeguarded at all times to prevent theft, loss or misuse by unauthorized personnel.

(e) All badges must be retrieved upon completion of the contract, or any other circumstances that eliminate the requirement for access to the installation by the contractor. It is the responsibility of the CO, COR or CAS to ensure the badges are collected and returned to either Security Desk.

2. DOD DECALS.

(a) Vehicle registration and the display of the DoD decal is required for contractor employees who are employed full-time on Arsenal Island (4-5 days a week) and reside in the local community (within 100 miles).

Registration requirements include possession of a valid state driver's license, supported by a RIA badge and possession of a current, original certificate of state registration, as required by the state in which the vehicle is registered.

(b) Contractor personnel registering a motor vehicle must comply with the automobile insurance laws of the State in which the vehicle is registered. Registration also implies knowledge of the requirement to remove and return the decal when registration is terminated, the owner sells or disposes of the vehicle, employment is terminated, or suspension or revocation of driving privileges has occurred.

(c) Vehicle registration and installation decals is not required for bicycles, motorcycles, company or off-road vehicle.

(d) All decals must be retrieved upon completion of the contract, or any other circumstances which eliminate the requirement for access to the installation by the contractor. It is the responsibility of the CO, COR or CAS to ensure the decals are collected and returned to either Security Desk.

3. PARKING.

(a) Parking is on a first-come, first served basis, provided the parking space is not posted with a reserved, visitor or handicapped parking sign. Parking is allowed in “marked” spaces only.

(b) All valid spaces are clearly marked with white lines on both sides of the space. Vehicles parked in other than valid spaces are subject to being issued a parking ticket.

4. NON U.S. CITIZENS:

(a) Foreign Nationals must be escorted by an installation employee who is a US Citizen at all times when in installation work areas. Security badges will be marked “Escort Required in All Areas”. AMCMI is the approval authority for granting access to foreign nationals to AMC information systems.

(b) Immigrant Aliens must be escorted by a government employee who is a US Citizen at all times when in installation restricted areas. Security badges will be marked “Escort Required in Restricted Areas”. AMCMI is the approval authority for granting access to immigrant aliens to AMC Information Technology (IT) systems.

5. Information Technology (IT) Positions and/or Processing Information Within IT Systems.

(a) Every contractor employee within the Department of Defense whose duties require access to IT Systems will have their positions identified by the government as either Information Technology (IT) I, II or III. Those contractor personnel identified as IT I, II and III will require a favorably completed security investigation as listed below. Completed forms will be submitted by the contractor to the Office of Personnel Management (OPM). Only after the investigation has been favorably completed will the contractor be given permanent access to the system.

Temporary access may be authorized if the contractor provides a copy of the submitted investigation for the Security and Intelligence Division (AMSTA-RI-FPS) to review.

(1) IT-I Definition. Responsible for designing Army IT Systems. Investigation requirements: Single Scope Background Investigation.

(2) IT -II DEFINITION. Responsible for designing programs and/or administering systems in support of Army Information Assurance (IA). Investigation requirement: National Agency Check.

(3) IT-III Definition. Duties requiring a login ID and password for access to an Army IT System.

Investigation requirement: National Agency Check.

(b) The contractor will ensure that investigations are returned to the "Commander, Rock Island Arsenal, ATTN: AMSTA-RI-FPS, Rock Island, IL 61299-5000".

(c) Electronic forms and instructions are available at www.dss.mil.

(d) Unfavorable Information: When unfavorable information is received by the government, the subject of that unfavorable information may be denied access until the information is adjudicated by the government.

6. UNESCORTED ACCESS TO RESTRICTED AREAS. Contractors whose duties have been designated by the government as requiring unescorted access to restricted areas must provide proof of a favorably completed personnel security investigation equivalent to an ADP III position as specified above.

7. ELECTRONIC ACCESS. The COR must coordinate, request and issue electronic access keys for contractor personnel. Contractor personnel must report the loss of electronic keys immediately.

c. SAFETY REGULATIONS. When the project location is inside of a manufacturing building where all employees and visitors are required to wear approved safety glasses, all contractor and subcontractor personnel are required to wear safety glasses on the project site.

d. RESTRICTED AREAS. Contractor's personnel will not be allowed within he restricted areas of the Arsenal without proper identification and authorization. Also, upon ingress/egress, their vehicles will be subjected to vehicle inspection by the regularly appointed guards of Rock Island Arsenal.

e. REMOVAL OF CONTRACTOR OR GOVERMENT-FURNISHED PROPERTY. The following procedures are prescribed for the issuance of passes for removing contractor owned material and equipment which has been brought onto the Arsenal by authorized contractors for use in accomplishing work under a contract, or Government-furnished property which, under the terms of a contract, may properly be removed by the contractor.

1. It will be the responsibility of the contracting officer, or designated inspector to determine that property being removed by a contractor is property of the contractor, or Government-furnished property being removed under the terms of the applicable contract. In case Government-furnished property is involved, it will be the responsibility of the individuals designated above to insure that all accounting papers prescribed by the contract or other regulations have been completed before the contractor is permitted to remove the property.

2. The individuals designated for the purpose, will prepare and sign a Property Pass, DA Form 1818, which will contain the name of the contractor, the contract number, a listing of the property in sufficient detail to permit identification. The guard on duty at the exit gate will retain the pass and turn it in at the Police Station.

NOTE: The guards will not allow removal of contractor's property unless covered by the above pass. It is the contractor's responsibility to obtain the pass from the contracting officer's designated representative.

f. INSPECTION. All contractor and contractor employees' vehicles, equipment, and packages are subject to inspection or examination at entry/exit of the Arsenal. Security personnel/police will conduct inspection deemed necessary to enforce security requirements.

g. SMOKING POLICY.

1. Indoor smoking is not allowed in any workplace building on Arsenal Island.

2. Only the cafeterias and the Arsenal Club have designated indoor smoking areas available.

3. Outside smoking must occur at least 50 feet from building entrances and exits.

4. Contractors are required to enforce DOD/RIA 'No Smoking' rules for the Contractor's employees.

h. RADIOACTIVE MATERIALS AND RADIATION GENERATING EQUIPMENT. The Rock Island Arsenal Radiation Protection Program requires the Radiation Protection Officer (RIA-RPO) to have full knowledge of the location of radioactive materials and radiation generating equipment. Contractors and any other non-Army activities operating on the installation shall inform the RPO of any radioactive sources or equipment which generates ionizing radiation.

i. EMERGENCY MEDICAL TREATMENT.

1. The Rock Island Arsenal (RIA) Health Clinic, Bldg. 110, can provide medical care only for Government employees for work-related matters. Contractor employees are not eligible for routine health care at the RIA Health Clinic.

2. The RIA does have ambulance service and paramedics available for emergencies. In the event of a medical emergency (serious accident or illness), the RIA Health Clinic will care for any patient until other arrangements can be made.

3. Contractors shall inform all employees working at RIA of the following:

(a) Limitations upon health care at the RIA Health Clinic.

(b) Company policies and procedures for obtaining health care for work-related injuries or health problems.

(c) Emergency Phone Number For Rock Island Arsenal: Dial 911.

DIAL 911 FOR AMBULANCE, FIRE, MEDICAL EMERGENCIES

APPENDIX

Force Protection Directorate (AMSTA-RI-FP)

TO WHOM IT MAY CONCERN

The following information is required to expedite the work you will be performing on Rock Island Arsenal. Please read the instructions carefully, and provide the information requested utilizing the attached contract.

COMPANY NAME:

COMPANY ADDRESS:

CONTRACT NUMBER:

INCLUSIVE DATES OF CONTRACT:

WORK AREAS (Building Numbers):

HOURS OF OPERATION:

CONTRACTING OFFICER REPRESENTATIVE:

CONTRACTOR'S SUPERINTENDENT (Name, Address, Phone Number):

ESTIMATED NUMBER OF CONTRACTOR EMPLOYEES:

NAME AND PHONE NUMBER OF INDIVIDUAL COMPLETING THE ABOVE INFOMATION:

If you will be employing SUBCONTRACTORS, please forward a copy of this letter to each subcontractor company and ensure they respond appropriately.

The above information is to be forwarded to the Security Management Office prior to the start of the contract.

At the completion of the project, ALL badges MUST be returned to the Security Desk in Building 102, second floor.

If you have any questions or concerns, feel free to contact the security desk (309) 782-0551. (End of Appendix)

(End of clause)

52.0000-4148 COMMERCIAL PACKAGING, PACKING AND MARKING INSTRUCTIONS (OCT 1990)

(a) Material shall be prepared and packed for shipment in accordance with standard commercial practice (Level C) sufficiently protected to arrive in good condition.

(b) Marking of Shipments. In addition to markings required for transportation, shipping labels and documents shall include the contract or purchase order number. Individual piece markings shall comply with industry standards.

52.0000-4834 AMC-LEVEL PROTEST PROGRAM (TACOM 52.233-4503/PADDS AS7010) (JUL 2007)

1. If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer. However, you can also protest to Headquarters, AMC. The HQ, AMC- Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the Contracting Officer) to: HQ, Army Materiel Command Office of Command Counsel

ATTN: AMCCC-PL

9301 Chapek Road 2-1SE3401 Fort Belvoir, VA 22060-5527 Facsimile Number (703) 806-8866/8875 Voice Number (703) 806-8762

2. Packages sent by FEDEX or UPS should be addressed to: HQ, Army Materiel Command Office of Command Counsel Room 2-1SE3401 1412 Jackson Loop Fort Belvoir, VA 22060-5527

3. The AMC-level protest procedures are found at:

http://www.amc.army.mil/amc/command_counsel/protestlink.htm.

4. If Internet access is not available, contact the Contracting Officer or HQ, AMC Office of Command Counsel at (703) 806-8762 to obtain the AMC-Level Protest Procedures. (End of clause)

52.0000-4934 DISCLOSURE OF UNIT PRICE INFORMATION (JUN 2005)

This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23,1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the Contracting Officer is notified of your objection to such release prior to submission of initial proposals. (End of clause) (PADDS AS7909)

(TACOM-RI 52.204-4505)

52.0000-4941 WIDE AREA WORKFLOW (WAWF) RECEIPT/ACCEPTANCE FOR SUPPLIES (RIA-JMTC)

(OCT 2007)

(a) To comply with the clause at 252.232-7003, "Electronic Submission of Payment Requests", the Rock Island Arsenal Joint Manufacturing & Technology Center (RIA-JMTC) contracting office uses the WAWF-RA Program.

Receipts on this order will be processed via WAWF.

(b) The contractor shall register to use WAWF-RA at https://wawf.eb.mil. There is no charge to use WAWF. All questions relating to system setup and vendor training can be directed to the help desk at Ogden, UT. Their number is 1-866-618-5988.

(c) The contractor is required to use WAWF (https://wawf.eb.mil) using the DODAACs and information listed below.

Document Type: Invoice and Receiving Report (Combo) Issued by DODAAC: W9098S Admin by DODAAC: W9098S Inspect by DODAAC: W52H1B Ship to Code: W52H1B Pay DODAAC: HQ0303 Send More Email Notifications: sabrina.l.lowe.civ@mail.mil

(d) Note: Some DODAACs will populate automatically in WAWF from your contract information stored in the Electronic Document Access (EDA) program. However, if the DODAAC in the above table is different, overwrite the WAWF download with the information in the table for that field. Some DODAACs are not yet registered in

WAWF.

(e) You can track your payment information by linking to the DFAS website from WAWF. The link is located at the bottom of the left side menu. Click on: Pay Status (my invoice-external link).

You may use this link for assistance in completing the WAWF documentation:

http://www.dfas.mil/contractorpay/electoniccommerce/ECToolBox/CreateCIRR.swf

Other WAWF training is available from the WAWF main website, or directly at: http://www.wawftraining.com (End of Notice)

52.0000-4943 NOTIFICATION OF VENDOR PERFORMANCE EVALUATION (Feb 2011)

This contract will be evaluated on vendor performance in the following categories: Overall, Product/Service Quality, Compliance with Contract, Delivery Schedule Met, and Performance within Price Range. A letter will be sent if performance of the contract is “Unsatisfactory” in any category. Copies of the Vendor Performance File can be requested for review. Send requests for Vendor Performance Files to the Contract Specialist listed on the first page of the solicitation/contract.

(End of Notice)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.

(b) The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:

(1) When no longer needed for contract performance.

(2) Upon completion of the Contractor employee's employment.

(3) Upon contract completion or termination.

(c) The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.

(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the subcontractor`s employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.

(End of Clause)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(AUG 2012)

(a) Definitions. As used in this clause:

Executive means officers, managing partners, or any other employees in management positions.

First-tier subcontract means a subcontract awarded directly by the Contractor for the purpose of acquiring supplies or services (including construction) for performance of a prime contract. It does not include the Contractor's supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a Contractor's general and administrative expenses or indirect costs.

Month of award means the month in which a contract is signed by the Contracting Officer or the month in which a first-tier subcontract is signed by the Contractor.

Total compensation means the cash and noncash dollar value earned by the executive during the Contractor's preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Financial Accounting Standards Board's Accounting Standards Codification (FASB ASC) 718, Compensation- Stock Compensation.

(3) Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property) for the executive exceeds $10,000.

(b) Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L.

110-252), requires the Contractor to report information on subcontract awards. The law requires all reported information be made public, therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.

(c) Nothing in this clause requires the disclosure of classified information.

(d)(1) Executive compensation of the prime contractor. As a part of its annual registration requirement in the Central Contractor Registration (CCR) database (FAR clause 52.204-7), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for its preceding completed fiscal year, if—

(i) In the Contractor's preceding fiscal year, the Contractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.).

(2) First-tier subcontract information. Unless otherwise directed by the contracting officer, or as provided in paragraph (g) of this clause, by the end of the month following the month of award of a first-tier subcontract with a value of $25,000 or more, the Contractor shall report the following information at http://www.fsrs.gov for that first-tier subcontract. (The Contractor shall follow the instructions at http://www.fsrs.gov to report the data.)

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(vi) Subcontract number (the subcontract number assigned by the Contractor).

(vii) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(viii) Subcontractor's primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(ix) The prime contract number, and order number if applicable.

(x) Awarding agency name and code.

(xi) Funding agency name and code.

(xii) Government contracting office code.

(xiii) Treasury account symbol (TAS) as reported in FPDS.

(xiv) The applicable North American Industry Classification System code (NAICS).

(3) Executive compensation of the first-tier subcontractor.

Unless otherwise directed by the Contracting Officer, by the end of the month following the month of award of a first-tier subcontract with a value of $25,000 or more, and annually thereafter (calculated from the prime contract award date), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for that first-tier subcontractor for the first-tier subcontractor's preceding completed fiscal year at http://www.fsrs.gov, if—

(i) In the subcontractor's preceding fiscal year, the subcontractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)

(e) The Contractor shall not split or break down first-tier subcontract awards to a value less than $25,000 to avoid the reporting requirements in paragraph (d).

(f) The Contractor is required to report information on a first-tier subcontract covered by paragraph (d) when the subcontract is awarded. Continued reporting on the same subcontract is not required unless one of the reported data elements changes during the performance of the subcontract. The Contractor is not required to make further reports after the first-tier subcontract expires.

(g)(1) If the Contractor in the previous tax year had gross income, from all sources, under $300,000, the Contractor is exempt from the requirement to report subcontractor awards.

(2) If a subcontractor in the previous tax year had gross income from all sources under $300,000, the Contractor does not need to report awards for that subcontractor.

(h) The FSRS database at http://www.fsrs.gov will be prepopulated with some information from CCR and FPDS databases. If FPDS information is incorrect, the contractor should notify the contracting officer. If the CCR database information is incorrect, the contractor is responsible for correcting this information.

The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.

This training shall be completed within 45 calendar days of contract award and within 5 calendar days of new employees’ commencing performance, with the results reported to the COR no later than 5 calendar days after contract award.

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

The Contractor is responsible for the delivery of each item quantity within allowable variations, if any. If the Contractor delivers and the Government receives quantities of any item in excess of the quantity called for (after considering any allowable variation in quantity), such excess quantities will be treated as being delivered for the convenience of the Contractor. The Government may retain such excess quantities up to $250 in value without compensating the Contractor therefor, and the Contractor waives all right, title, or interests therein.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .