Amendment 0001 for the ND MATOC

View the file

Other files

File Type Posted
attendance roster.pdf PDF
pre proposal minutes ND MATOC Apr 11.docx DOCX document
MATOC Pre-proposal conf slides for FBO.pptx PPTX presentation
Solicitation ND FY11 MATOC RFP.pdf PDF
EXHIBIT F Proposal Volume Contents Aid.pdf PDF
Vice Commanders Suite KKGA081022 Spec-1.pdf PDF
EXHIBIT E Prototypical Offer Form.pdf PDF
EXHIBIT G Proposal Inquiry Form.pdf PDF
Vice Commanders Suite KKGA081022 Spec-2.pdf PDF
EXHIBIT B Subcontractor Info Consent Form.pdf PDF
Vice Commanders Suite KKGA081022 Spec-3.pdf PDF
EXHIBIT E-1 self performed work.pdf PDF
Vice Commanders Suite KKGA081022 Drawings.pdf PDF
EXHIBIT D Tech Proposal Format Questions.pdf PDF
EXHIBIT C Package Info for PP.pdf PDF
Vice Commanders Suite KKGA081022 Spec-4.pdf PDF
EXHIBIT A Performance Relevancy Questionaire.pdf PDF
EXHIBIT F Proposal Volume Contents Aid.doc DOC document
EXHIBIT E-1 self performed work.docx DOCX document
EXHIBIT E Prototypical Offer Form.docx DOCX document
Vice Commanders Suite KKGA081022 Spec-4.pdf PDF
Vice Commanders Suite KKGA081022 Drawings.pdf PDF
Vice Commanders Suite KKGA081022 Spec-2.pdf PDF
EXHIBIT G Proposal Inquiry Form.doc DOC document
EXHIBIT C Package Info for PP.doc DOC document
Vice Commanders Suite KKGA081022 Spec-3.pdf PDF
Vice Commanders Suite KKGA081022 Spec-1.pdf PDF
EXHIBIT D Tech Proposal Format Questions.doc DOC document
EXHIBIT A Performance Relevancy Questionaire.doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F7B3CC1046N001 KKGA 112004

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

North Dakota Multiple Aw ard Task Order Contract (MATOC)

PN: KKGA 112004

See attached

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-May-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W901UZ-11-R-0001

X 9B. DATED (SEE ITEM 11)

13-Apr-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-May-2011

CODE

W5ALXT NDARNG JFHQ

OUSPFO FOR NORTH DAKOTA

ATTN: P&C, PO BOX 5511

BLDG. 50, FRAINE BARRACKS

BISMARCK ND 58506-5511

W901UZ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W901UZ-11-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001, ND MATOC

ND Multiple Award Task Order Contract (MATOC)

PN: KKGA 112004

The following additions, clarifications, deletions and/or changes shall be made to the solicitation documents:

NOTE: All bidders are advised to ensure all amendments are acknowledged in block 19 of the SF 1442 –

Solicitation, Offer, and Award.

Exhibit C, Cover letter example for the “Past Performance Evaluation Questionnaire” indicates a date to arrive at the Government office Not Later Than May 13, 2011, is changed to read the

Questionnaire should arrive at the Government office Not Later Than May 19, 2011, which is the same date that proposals are due. This was also corrected in the pre-proposal conference minutes posted on May 05, 2011

Exhibit F, Section starting with Binder #2, Past Performance Information – Reminder, it states under Exhibit A, Part 1, to provide Performance Relevancy Questionnaire format for five (5) general construction projects. This is changed to read for six (6) general construction projects. It was stated at the pre-proposal conference that the requirement would be five (5), but Exhibit F is changed to comply with other areas in the solicitation.

Submission Requirements, offerors are advised to follow the instructions contained in Section

00110, “SUBMISSION REQUIREMENTS AND INSTRUCTIONS”, Paragraph 1.4, PROPOSAL CONTENT

(End of Summary of Changes)