Trailer_Repaint_PWS_REVISED.pdf
PDF 77 KB Posted
- Attached to
- Trailer Re-Paint
- Solicitation number
- W901UZ10877556
About this file
Please see additional information on the Revised PWS shown in red.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Trailer_re-paint_RFQ_REVISED.pdf | ||
| 252.209-7991_FY16.pdf | ||
| Trailer_re-paint_RFQ.pdf | ||
| Trailer_Repaint_PWS.pdf | ||
| 252.203-7996.pdf | ||
| 252.203-7996.pdf | ||
| Trailer_re-paint_RFQ.pdf | ||
| 252.209-7991_FY16.pdf | ||
| Trailer_Repaint_PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
*REVISED*
Performance Work Statement
1. Background:
| 1.1. | Field | Maintenance | Shop | (FMS) | 2 | is | located | in | Fargo, | ND; | this | shop | ensures | maximum |
| operational | readiness | for | all | assigned | equipment | and | is | responsible | for | identifying | maintenance | |||
| and | repair | needs. |
2. Scope:
| 2.1. | The | purpose | of | this | effort | is | to | repaint | and | restore | the | paint | finish | to | extend | the | useable | life | of |
| the | equipment; | 2 | (each) | Landoll | 610B | trailers. | The | contractor | shall | provide | all | supplies, | personnel, | ||||||
| equipment, | tools, | materials, | and | other | items | or | services | necessary | to | complete | the | required | work | ||||||
| indicated | in | this | performance | work | statement. |
3. Objectives/Tasks:
3.1. The Contractor will be responsible for the following:
Steam clean trailer
Remove/replace DOT reflective tape, warning labels, and stripes
Remove/re‐install wheels and lights
Remove/re‐install cargo boxes
Repair prep and mask for blasting
Repair set up in trailer for blasting
Sandblast trailer; media blast entire trailer down to the metal
Spray bare metal with epoxy primer
Refinish prep for painting
Refinish trailer – entire trailer will be sprayed with a single stage gloss black top coat
Refinish cargo boxes (2)
Refinish wheels (12), paint color: white
Remove/replace operation control placard
| POR | 15 | Rust | Preventive | spray | or | equal | product | will | be | used | for | underside | and |
| rusted | out | areas |
4. Place of Performance:
4.1. All work will be completed at the business location in the Fargo, ND/Moorhead, MN area.
5. Period of Performance:
5.1. All work shall be completed within 60 days of date on award.
6. Contract Manpower Reporting Application (CMRA) Requirements:
| 6.1. | The | Contractor | shall | report | ALL | contractor | labor | hours | (including | subcontractor | labor | hours) | ||||
| required | for | performance | of | services | provided | under | this | contractor | for | the | North | Dakota | National | |||
| Guard | via | a | secure | data | collection | site. | The | Contractor | is | required | to | completely | fill | in | all | required |
| data | fields | using | the | following | web | address: | http://www.ecmra.mil/ |
File details come from the government source that posted it. Updated .