Trailer_Repaint_PWS.pdf

PDF 163 KB Posted

Attached to
Trailer Re-Paint
Solicitation number
W901UZ10877556
Issued by

About this file

PWS

View the file

Other files

File Type Posted
Trailer_Repaint_PWS_REVISED.pdf PDF
Trailer_re-paint_RFQ_REVISED.pdf PDF
252.209-7991_FY16.pdf PDF
Trailer_re-paint_RFQ.pdf PDF
Trailer_Repaint_PWS.pdf PDF
252.203-7996.pdf PDF
252.203-7996.pdf PDF
Trailer_re-paint_RFQ.pdf PDF
252.209-7991_FY16.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Trailer Re-Paint

1. Background:

1.1.FieldMaintenanceShop(FMS)2islocatedinFargo,ND;thisshopensuresmaximum
operationalreadinessforallassignedequipmentandisresponsibleforidentifyingmaintenance
andrepairneeds.

2. Scope:

2.1.Thepurposeofthiseffortistorepaintandrestorethepaintfinishtoextendtheuseablelifeof
theequipment;Landoll610Btrailer.Thecontractorshallprovideallsupplies,personnel,
equipment,tools,materials,andotheritemsorservicesnecessarytocompletetherequiredwork
indicatedinthisperformanceworkstatement.

3. Objectives/Tasks:

3.1. The Contractor will be responsible for the following:

Steam clean trailer

Remove/replace DOT reflective tape, warning labels, and stripes

Remove/re‐install wheels and lights

Remove/re‐install cargo boxes

Repair prep and mask for blasting

Repair set up in trailer for blasting

Sandblast trailer

Refinish prep for painting, paint color: black

Refinish trailer

Refinish cargo boxes (2)

Refinish wheels (12), paint color: white

Remove/replace operation control placard

4. Place of Performance:

4.1. All work will be completed at the business location in the Fargo, ND/Moorhead, MN area.

5. Period of Performance:

5.1. All work shall be completed within 60 days of date on award.

6. Contract Manpower Reporting Application (CMRA) Requirements:

6.1.TheContractorshallreportALLcontractorlaborhours(includingsubcontractorlaborhours)
requiredforperformanceofservicesprovidedunderthiscontractorfortheNorthDakotaNational
Guardviaasecuredatacollectionsite.TheContractorisrequiredtocompletelyfillinallrequired
datafieldsusingthefollowingwebaddress:http://www.ecmra.mil/

File details come from the government source that posted it. Updated .