W900KK20R0050U0002.pdf

PDF 263 KB Posted

Attached to
W900KK-20-R-0050 - Amendment 2
Solicitation number
W900KK-20-R-0050-Amendment-2
Issued by

About this file

This solicitation amendment extends the proposal due date for solicitation number W900KK-20-R-0050 to April 21, 2020 at 4:00 PM Eastern time. The amendment updates Section L and Attachment 1 of the solicitation to include additional SLINs, and updates Attachment 12 to include recent questions from offerors. The original solicitation was for the Wideband Training and Certification System Version 2 and involved requirements for connectivity, an approach to a sample order, and data rights. The Department of the Army is the contracting agency.

View the file

Other files

File Type Posted
W900KK20R0050U0002 - Conformed.pdf PDF
Attachment 1 - Cost-Price Workbook - 8 APR 20.xlsx XLSX spreadsheet
Attachment 12 - RFP Questions and Answers 8 APR 20.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Proposal due date is extended to 4:00 PM Eastern on 21 APR 2020

Section L - Paragraph L.3.4 updated.

Attachment 1 - Cost Price Workbook updated to include SLINs Attachment 12 - RFP Questions and Answ ers updated to include recent questions

1. CONTRACT ID CODE PAGE OF PAGES

J 1 22

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W900KK20R0050

X 9B. DATED (SEE ITEM 11)

13-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Apr-2020

CODE

ARMY CONTRACTING COMMAND - ORLANDO

ATTN: ALPHA DIVISION

12211 SCIENCE DRIVE

ORLANDO FL 32826-3224

W900KK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W900KK20R0050

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Apr-2020 04:00 PM to 21-Apr-2020 04:00 PM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L

PROPOSAL SUBMISSION (Section L).

1. PROPOSAL SUBMISSION REQUIREMENTS

L1. Introduction. This section provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The Offeror’s proposal must include all data and information requested and must be submitted in accordance with these instructions. The Offeror shall not submit additional proposal information that is not specifically requested by this Solicitation.

Such additional proposal information will not be considered during the evaluation process. The Offeror’s proposal shall be compliant with these submission instructions (Section L). Non-conformance with the instructions provided may result in an Offeror being found non-responsive and may result in an unfavorable proposal evaluation.

Offerors shall assume that the Government has no prior knowledge of their facilities and experience. The Government will base its evaluation only on the information presented in the Offeror’s proposal. The Government will not assume the Offerors will do anything that is not expressly stated in their proposal.

In presenting material in their proposal, Offerors are advised that quality of information is more important than quantity. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated assertions. Elaborate brochures or presentations, binding, detailed art work and other documents beyond what is sufficient to present a complete and effective proposal, are unnecessary and are not desired. The proposal shall be specific, detailed and complete as to clearly and convincingly demonstrate that the Offeror has a thorough understanding of the requirements and associated risks, and is able, willing, and competent to devote the resources necessary to meet the requirements and has valid and practical solutions for all requirements.

The proposal should not simply rephrase or restate the Government's requirements, but rather, shall provide convincing rationale to address how the Offeror intends to meet the WTCS V2 requirements. Paraphrasing the SOW, the Specifications, or parts thereof is inadequate, as are phrases such as “standard procedures will be employed” or “well-known techniques will be used.” Mere reiteration of the requirement or standard reference material is discouraged and may be considered inadequate and non-compliant. It is the Offeror’s responsibility to present enough information to be meaningfully evaluated without discussions.

The Offeror must include any data necessary to illustrate the adequacy of the various assumptions, approaches, and solutions to problems. Offerors are encouraged to use quantitative terms wherever possible and avoid the use of qualitative and subjective terms to the maximum extent practicable. Offerors are cautioned that while the Government will not evaluate every SOW requirement for the purposes of the source selection evaluation, the awardee/Contractor will be required to comply with all SOW requirements during performance of the contract.

The Government may determine that an Offeror’s proposal is non-compliant, and therefore ineligible for award, if the proposal indicates that: it cannot or will not meet any of the SOW requirements; provides an approach that clearly does not meet any of the SOW requirements; or, includes data which prompts the Government to question the Offeror’s compliance with any of the SOW requirements. The Source Selection Authority may reject all proposals received in response to a solicitation, if doing so is in the best interest of the Government.

OFFERORS ARE HEREBY ON NOTICE THAT A FAILURE TO SUBMIT ALL THE

REQUIRED DOCUMENTATION IN EXACTLY THE MANNER (TIMELINESS AND

FORMAT) SPECIFIED IN THE SOLICITATION MAY CONSTITUTE A BASIS FOR

THE GOVERNMENT TO REJECT A PROPOSAL AS NON-COMPLIANT AND

THEREFORE BE DEEMED UNACCEPTABLE, AT THE SOLE DISCRETION OF

THE PCO.

L.2 General Information

It is requested that all questions pertaining to this solicitation and its attachments are submitted via e-mail to the points of contact (POC) below.

Primary Mr. Chris Crouch/Contract Specialist Phone: (407) 208-3320 Email: Christopher.l.crouch.civ@mail.mil Alpha Division (CCOR-CDD-A) U.S. Army Contracting Command-Orlando 12211 Science Drive Orlando, FL 32826-3224.

Alternate

Mr. Eric Hertl /Branch Chief/Contracting Officer Phone: (407) 208-3473 Email: Eric.c.hertl.civ@mail.mil Alpha Division (CCOR-CDD-A) U.S. Army Contracting Command-Orlando 12211 Science Dr Orlando FL 32826-3224.

THE CONTRACTING OFFICER, MR. ERIC HERTL, AND THE CONTRACT

SPECIALIST, MR. CHRIS CROUCH, ARE THE SOLE GOVERNMENT POINTS

OF CONTACT FOR THIS SOLICITATION.

L.2.1 Proposal Due Date: Contractor will have 10 days from RFP release date annotated on Block 9 of SF 33 to submit questions to the Government. All questions and or comments shall be submitted in a spreadsheet format identifying questions, specific areas within SOW or Request for Proposal, page numbers, section and paragraph. Offerors may submit multiple sets of questions and are encouraged to submit questions daily as they arise. Questions and Comments received after the deadline may not be answered prior to proposal submission or at all. Proposals are due no later than date and time stated on SF 33, Block 9.

Offerors are prohibited from submitting multiple or alternate proposals for consideration. Proposed technical solutions that require additional Government Property not already identified as available Government Property will not be considered for award.

L.2.2 Anticipated Award: The Government anticipates that the award will be made in the 3QFY20. This information is provided for use as a basis for schedules and burden (labor, overhead, etc.) calculations.

L.2.3 The Government intends to evaluate proposals and award a contract without conducting discussions with Offerors. However, in the event the PCO concludes that conducting discussions is in the best interests of the Government, the PCO will establish a competitive range before entering into discussions. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a price and non-price standpoint.

L.2.4 The Government intends on awarding a single source Indefinite Delivery / Indefinite Quantity (ID/IQ) Contract not to exceed $49M with a period of performance of five years consisting of Delivery Order 1 with a 12 month period and subsequent delivery orders to follow over the period of performance of the contract, resulting from this solicitation to the responsible Offeror whose proposal represents the best value to the Government in accordance with established criteria in Section M or equivalent solicitation criteria. The North American Industry Classification System (NAICS) Code is 333 – Machinery Manufacturing/333318, Other Commercial and Service Industry Machinery Manufacturing, small business size standard 1000. The Government will utilize the subjective trade-off analysis in determining the best value.

L.2.5 Offerors shall ensure that each proposal Volume submitted contains only the information relevant to that specific Volume. The Offerors are cautioned that each Volume of the proposal is evaluated stand-alone against the criteria set forth in the Proposal Submission Instructions and Evaluation Criteria and if the data is not contained in the appropriate volume of the proposal, it will not be evaluated.

L.2.6 Offerors shall assume that any data previously submitted in response to another solicitation, whether submitted to the Army Contracting Command – Orlando (ACC-ORL) or another agency, will not be available during this proposal evaluation and source selection process. Offerors’ previously submitted proposal data shall not be incorporated into the proposal by referring to another proposal or other source.

L.2.7 Features or capabilities proposed by the Offeror which exceeds the requirements of this solicitation will be incorporated into the awardee’s contract award.

L.2.8 The Government requests that the proposal be valid for at least 180 calendar days from the proposal due date. Files shall not contain classified information.

Offerors are cautioned that in order for their proposal to be eligible for award, the proposal shall be in compliance with the terms and conditions set forth in this solicitation.

L.2.9 If an Offeror believes that the requirements and/or instructions in the RFP contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contract Specialist and Contracting Officer in writing (email is acceptable) with supporting rationale.

L.2.10 Assertions should be made for technical or computer software to be furnished with restrictions. Offerors must complete the assertion list requirements of DFARS provision 252.227-7017.

L.2.11 Proposals shall not contain classified information and Proprietary information shall be clearly marked.

L.2.12 The Government may issue one or more Solicitation amendment(s) prior to the deadline for final proposal submissions based upon the questions received.

However, the Government does not anticipate that the closing date for receipt of offers will be extended. Offerors are encouraged to carefully review all Solicitation requirements and submit questions to the Government early in the proposal preparation cycle.

L.2.13 Contracts with PEO STRI range from Unclassified//For Official Use Only (FOUO) up to Top Secret / Sensitive Compartmented Informaion (TS/SCI) and in accordance with 48 CFR clause 752.204-70, Partner vetting pre-award requirements, 752.216-71 Partner vetting in IDIQ contracts, AR 380-49 Industrial Security and AR 380-10 Foreign Disclosure and Contacts with Foreign Representatives, all contractors (Prime and Subs) and or Offerors must be vetted for eligibility, suitability, national status e.g. Foreign contractor or USA Foreign Owned, Controlled and Influenced (FOCI) when bidding on government contracts.

All Contractor(s) and or Offeror(s) (Prime and Subs) who do not meet the vetting process listed below are considered ineligible for award. The Contractor(s) and or Offeror(s) (Prime and Subs) will be notified by the contracting officer of their deficiencies and provided information on what they would need to do to become competitive.

Joint Ventures (JV) must meet the vetting process and submit their JV agreement which should indicate the authority of any of the joint ventures to direct or decide matters affecting the JV business organization. Depending on the JV business structure, the terms of the JV agreement, and the clearance statues, the government will determine the JV’s ability to receive technical data packages or be cleared. (see DoDM 5220.22 Vol 2, 1 Aug 2018, section 4 FCLs chapter 4.8c(6).

SECURITY VETTING CRITERIA CONTRACTOR(S) and or OFFEROR(S) THAT REQUIRE ACCESS TO UNCLASSIFIED//FOUO CONTRACTS with

TECHNICAL DATA PACKAGES

All contractor(s) and or Offeror(s) (Prime and Subs) must certify in writing to the Contracting Officer that their company and or subcontractor(s) are or not;

Foreign Owned or under USA Foreign Owned, Controlled or Influenced (FOCI) status.

Also, the contractor shall certify if they are in a merger and or purchasing discussions with a Foreign company or USA FOCI company. This certification should be provided to the contracting officer using the company letterhead answering the above questions and providing the following:

Full company name Cage Code Identify country of origin.

All contractors, prospective contractors or Offerors will be vetted to verify their eligibility to receive contract unclassified technical data packages containing Controlled Unclassified Information (CUI), Controlled Technical Information (CTI), International Traffic in Arms Regulations (ITAR) and or Export Administration Regulations (EAR) information. The PEO STRI Industrial Security Specialist (ISS) in accordance with the regulations listed in the second paragraph and in coordination with the Contracting Officer is responsible for ensuring that all contractor(s) and or Offeror(s) (Prime and Subs) who have interest to bid on a DA contract are vetted for eligibility to receive the appropriate level of information, this includes proper mitigation of Foreign and USA Foreign Ownership Control or Influence (FOCI) companies.

Failure or inability to verify contractor eligibility for receipt of CUI, ITAR and or EAR information will make the contractor ineligible to receive contract technical data packages unless the following has been met:

a. All contractor(s) must be organized and existing under the laws of any of the fifty States, the District of Columbia, or Puerto Rico, and be located in the U.S. or its territories.

b. All contractor(s) and or Offeror(s) must be registered in the System for Award Management (SAM) database

c. All contractor(s) and or Offeror(s) (Prime and Subs) must have a reputation for integrity and lawful conduct in its business dealings. The company and its Key Management Personnel (KMP) must not be barred from participation in Government contracts.

d. All contractor(s) and or Offeror(s) (Prime and Subs) that are not Foreign or not under USA FOCI status and do not have a facility clearance must provide information about previous contracts or government work.

e. All contractor(s) and or Offeror(s) (Prime and Subs) must not be under Foreign Owned or USA FOCI or must have USA FOCI mitigated with the following;

Be registered with the U.S. State Department and provide a copy of the registration along with the appropriate DSP license or Technical Assistance Agreement (TAA) documents to the contracting officer. Visit or contact the U.S. State Department at http://www.pmddtc.state.gov/ to meet this requirement.

Canadian Companies must provide to the contracting officer, a copy of their DD2345 Military Critical Technical Data Agreement form signed by the United States/Canada Joint Certification Office in order to receive unclassified TDPs.

The prime contract shall not provide any unclassified Technical Data Packages (TDP) to USA FOCI or Foreign companies unless they possess a valid State Department license and or TAA. Data will be distributed per the provisions listed in the State Department licenses.

If a prime contractor has a subcontractor who is an approved USA FOCI and/or Foreign company, the prime contractor must generate, maintain and provide a copy of a Technology Control Plan (TCP) to the government, COR and have it available upon request from the Government. Information on the TCP can be obtained on at https://www.dcsa.mil/mc/ctp/foci/action/sample_tech_con_plan/

The contractor shall protect and properly mark and control all Export Control documents and information and Technical Data Packages marked distribution B- F.

L.3 PROPOSAL SUBMISSION REQUIREMENTS

L.3.1 Submitting Proposals. Proposals can be submitted by hand delivery, postal mail or by using DoD SAFE (https://safe.apps.mil), an on-line secure application for electronic file transfer. If submitting physical proposals, Offerors shall provide at least two DVD/CD-ROM (one original and one copy). Proposals submitted in any format other than described in this paragraph will be considered noncompliant and will not be evaluated by the Government.

L.3.2 Mailing Proposals. The outside shipping container shall be marked with the Solicitation Number. Proposals shall be mailed or emailed to the following address:

Army Contracting Command-Orlando ATTN: Mr. Chris Crouch Contract Specialist, Alpha Division U.S. Army Contracting Command ACC-Orlando Partnership II Building, 3100 Technology Parkway Orlando, FL 32826-3224 Ofc: (407) 208-3320, DSN 970-3320 christopher.l.crouch.civ@mail.mil

L.3.3 Hand Delivery of Proposals. Offerors wishing to hand deliver their proposal shall contact the Primary POC, Mr. Chris Crouch, by phone or email to coordinate delivery. If the Primary POC cannot be reached, Offerors are advised to contact the alternate POC Mr. Eric Hertl. Coordination shall be confirmed at least 48 hours prior to delivery. The Primary and/or Alternate POC will meet the Offeror in the lobby of the Partnership II building. The physical address is:

Partnership II Building 3100 Technology Parkway Orlando, FL 32826

L.3.4 Proposal Volumes The Offeror’s proposal shall consist of five (5) volumes as set forth below

Volume Title Physical Copies (if used) Maximum Pages

I Technical- Factor 1 2 DVD/CD Sets 30 II Management – Factor 2 2 DVD/CD Sets 20

III

Small Business Particiation – Factor 3 2 DVD/CD Sets No page limit

IV

Past Performance - Factor 4 2 DVD/CD Sets No page limit

V Price- Factor 5 2 DVD/CD Sets No page limit

VI Admin Volume 2 DVD/CD Sets No page limit NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government. Cover pages, table of contents, past performance, solicitation fill-ins, and addendums do not count toward page count.

Each paragraph should be single spaced, and shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be produced in landscape mode.

With the exception of Dollar Values required in the Small Business Participation volume (Volume III) and the Admin Volume (Volume VI), pricing information shall not be included in any volume other than Volume V, Price. The titles and contents of the volumes and books shall be as defined in the table below. Page limitation for each volume shall be strictly adhered. The Government will not evaluate any information after the designated page limit of the volume.

L.3.5 Proposal Files

L.3.5.1 Format. The submission shall be clearly indexed and logically assembled.

Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in Microsoft (MS) Word. MS Word (doc) files shall use the following page setup parameters:

Margins – Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”

The following additional restrictions apply:

L.3.5.2 File Packaging. Offerors shall submit 2 sets of the entire proposal (5 volumes) in electronic format, using non re-writable DVD/CD-ROM (in uncompressed files). Each proposal volume shall consist of the separate electronic file(s), submitted on separate DVD/CDs. All files shall be clearly identified with a filename appropriate to the content (e.g., Volume-I_Technical_Appendix-A). All DVD/CDs shall be appropriately labeled with the Title of Proposal, Solicitation/Opportunity Number, Proposal Volume number and Title, Offeror’s

Name and address, Copy Number, and Amendment Number (if applicable). Use separate files to permit rapid location of all portions, including Sub-Factors, exhibits, annexes, and attachments, if any. If files are compressed, the necessary decompression program must be included. When submitting their proposal, Offerors shall follow these instructions:

a. Electronic storage media shall be submitted in one of the following formats: pre-recorded (pressed) CD-ROM or DVD.

b. All files on each DVD/CD’s shall be directly supported by MS Office 2013 and verified to be free of any virus or malware. Failure to submit in the correct format is grounds for non-compliance determination, at the sole discretion of the PCO.

• Word documents – Set "Save as type" to "Word Document (*.docx)" only.

• Excel spreadsheets – Set "Save as type" to "Microsoft Excel

Workbook (*.xlsx)."

• PowerPoint presentations – Set "Save as type" to "Microsoft

PowerPoint 2013 Presentation (*.pptx)."

• Microsoft Project - There are no special “save” functions required.

c. Submit PDF documents using only Adobe Acrobat 9.0 or later. A PDF version of all electronic documents produced and submitted in native format shall also be included as a control copy. Do NOT submit any documents in PDF format that are copied as “images.” The PDF format shall be searchable.

d. When creating PDF and MS Office files, always create to enable textual search and copy functions.

e. Self-Extracting .exe files are not acceptable.

L.4 CONTENT REQUIREMENT

Volumes shall be organized as detailed in the corresponding sections.

L.4.1 VOLUME I: Factor 1 – Technical

L.4.1.1 The Offeror shall describe its proposed technical approach and processes to be employed in performing this contract. The Offeror shall describe its technical approach and processes in the following areas:

a. Subfactor 1.1—Connectivity. The Offeror shall describe their approach to meet the Delivery Order 01 requirement identified in Delivery Order 01 SOW paragraph 3.1.1 and SRD section 3.9. The Offeror’s description shall include thorough details covering efficiently and effectively networking the existing WTCS systems at the WSOCs together. The Offeror’s description shall also include thorough details covering safeguards used to prevent the WTCS training network from impacting the WSOCs operational network. The Offeror shall identify any risks and associated mitigation strategies associated with their approach including the likelihood of occurance and severity of impact to the effort before and after mitigation.

b. Subfactor 1.2—Approach to Sample Order. The Offeror shall describe their approach to meet the Sample Order requirement identified in the Sample Order SOW. The Offeror shall describe their overall holistic approach to upgrade and/or integrate satellite control systems on WTCS. The Offeror’s description shall include thorough details covering integration with and impacts to the current satellite control systems integrated on WTCS. The Offeror shall identify any risks and associated mitigation strategies associated with their approach including the likelihood of occurance and severity of impact to the effort before and after mitigation.The Offeror’s description shall assume that new and updated versions of the satellite control systems are provided as GFI Software.

c. Subfactor 1.3.—Data Rights and Rights in Computer Software. The Government has a need to oversee, modify, operate and sustain the WTCS V2 training devices. In order to perform these functions, the Government desires a minimum of Government Purpose Rights for all technical data and computer software developed under the awarded contract. The Offeror shall identify the rights in technical data and/or rights in computer software to be provided to the Government for all deliverables. Each Offeror’s response to solicitation provision DFARS Subpart 252.227-7017 shall be included as part of the technical volume.

If anything less than Government Purpose Rights is offered for technical data or computer software to be provided under the awarded contract, the Offeror shall explain its rationale for providing such rights and how the Offeror’s proposed rights will support the Government in overseeing, modifying, operating, and sustaining the WTCS V2 training devices using competitive contracting procedures.

d. Subfactor 1.4.—Technical Experience. The Offeror shall describe previous experience with complex software systems. The Offeror shall describe specifically their experience with relevant hardware, software, and courseware production, complex software systems. The Offeror shall describe specifically their experience with integrating GFI Software demonstrating the ability to efficiently and effectively complete the work.

L.4.2 VOLUME II: Factor 2 – Management

L.4.2.1 The Offeror shall describe its proposed management approach and processes to be employed in performing this contract. The Offeror shall describe its management approach and processes in the following areas:

a. Subfactor 2.1—Overall Management Approach. The management process and contract management tools as well as all resources, facilities, equipment, and personnel that will be involved in completing the tasks described in SOW paragraph 3.2.1 and dictated by the requirements identified in the System Specification, demonstrating efficient and effective management practices.

b. Subfactor 2.2—Delivery Schedule. The Offeror shall provide an Integrated Master Schedule (IMS) that reflects its understanding of the program requirements for WTCS V2 program that may be performed concurrently. The IMS shall address the Offeror’s major milestones identified, critical paths, configuration, manufacturing, integration, testing to include, fielding, Cybersecurity RMF, and subcontractor partnership(s) based on the estimated quantities. Offerors shall provide their proposed delivery schedule IAW FAR clause 52.211-8 in Section F as part of the technical proposal. The Offeror shall submit the IMS in Microsoft Project and PDF format.

c. .

L.4.3 VOLUME III: Factor 3 – Small Business Participation

L.4.3.1. The Small Business Participation Commitment Document shall stand on its own merit without reference to a separate Small Business Subcontracting Plan that is required for large businesses (to be submitted with Volume VI). The Small Business Participation Commitment Document will be incorporated into any resulting contract award.

L.4.3.2. The Offeror, regardless of whether a Small or Large Business, shall submit a Small Business Participation Commitment Document that clearly demonstrates a viable plan for meeting or exceeding the Small Business Participation requirement of no less than 30% of Total Proposed Price (cumulative of all DOs) for EACH 12-months of the five year ordering period (starting from the period of performance start date for the IDIQ contract) with representation from small business (SB), small disadvantaged business (SDB), service disabled veteran owned small business (SDVOSB), woman owned small business (WOSB) and Historically Underutilized Business Zone small business (HUBZones). For example, if the total amount of DOs awarded within a 12 month ordering period (For a total of five-12 month ordering periods following the basic award date) have a funded value of $1,000,000, the contractor should satisfy the 30% Small Business Participation requirement of at least $300,000 over this 12 month period. A Small Business Offeror can meet the Small Business Participation requirement through performance as a SB, or a combination of performance and SB subcontracting.

Offerors shall submit a single Small Business Participation Commitment Document IAW DFARS 215.304. The commitment document shall include the following:

a. Type of Business of prime contractor (Check all applicable boxes):

{ } Large { } Small (also check type of Small Business below) { } Small Disadvantaged Business { } Woman-Owned Small Business

{ } Historically Underutilized Business Zone Small Business { } Service Disabled Veteran Owned Small Business

b. Total Proposed Price: (from Total Proposed Price Spreadsheet)

c. Dollar Value performed by Offeror as Prime Contractor: $__________

d. Dollar Value and Percentage of Total Proposed Price awarded to both large and small businesses. All percentages should use Total Proposed Price from the Total Proposed Price Spreadsheet as a baseline. Include only first tier subcontractors. Fill in all applicable sections of the table below.

Dollar Value Percentage of Total Proposed Price

Large: $ % Small:

(see Note 1)

Total: $ Total Proposed Price

100% (see Note 2)

Note 1: Small includes: Small Business (SB), Small Disadvantaged Business (SDB), Women-Owned Small Business (WOSB), Historically Underutilized Business Zones (HUBZones), and Service-Disabled Veteran-Owned Small Business (SDVOSB). Only include once regardless if represented in multiple groups.

Note 2: Include the Prime Offeror’s dollars and percentage(s). When combined, Large and Small Business totals must equal 100% of the Total Proposed Price.

e. Using the Total Proposed Price Spreadsheet schedule, the Offeror shall populate the following table to identify all anticipated Prime and subcontracted supplies/services.

When combined, Prime and anticipated subcontracted totals must equal 100% of the Total Proposed Price. The sum of the Estimated Total Dollars for Each Service/Supply for the stated SB subcontractors should ultimately lead to achieving the Small Business Participation requirement of no less than 30% for EACH 12 months of the five year ordering period. The Offeror shall create as many rows and tables as necessary to adequately identify all subcontractors for EACH 12 months of the five year ordering period (starting from the period of performance start date for the IDIQ contract).

Pursuant to Section 8(d) of the Small Business Act, a concern is Small for subcontracts which relate to Government procurements if it does not exceed the size standard for the North American Industry Classification System (NAICS) code that the prime contractor believes best describes the product or services being acquired by the subcontract. In other words, the size of the Offeror’s subcontractors and suppliers is determined by the NAICS code of the subcontract, which may or may not be the same NAICS code as the one for Offeror’s contract with the Government.

Name of Company (Include

CAGE

Code)

Anticipated NAICS Code for Each Subcontractor

Type of Service/Supply

Estimated Total Dollars for Each Service/Supply

Prime Offeror:

N/A

Large:

Small:

The Offeror shall provide a short description of the specific services to be provided and the nature of complexity by each SB, the rationale supporting SB selection(s), and the estimated total dollar value for each service. Complexity is defined as the level of involvement for performance of functions provided by the SB concerns.

The Offeror shall provide an explanation pertaining to the process the Offeror uses for identifying and selecting SBs for subcontracted work and how the process will be used on this contract to meet the Offeror’s SB Participation requirement.

f. Extent of Commitment: The Offeror shall provide documentation regarding individual and enforceable commitments to utilize any SB firms, as defined in FAR Part 19, as subcontractors. Copies of such commitments shall be provided as part of Offeror’s Small Business Participation Volume IV.

g. Prior Performance Information: All Offerors shall substantiate past utilization of SBs. This evidence shall consist of three past relevant contracts to include evidence of attainment of Small Business Participation requirements as a percentage of Total Contract Value/Price over the past three calendar years to include requirement identification and achievement. A SB Offeror shall include its own performance in the documentation. Any information concerning long-term relationships with SB subcontractors, such as mentor-protégé relationships, supporting the Offeror's past utilization of SBs on relevant contracts, should be reported.

h. Prior Performance Information: All Offerors are to provide a description of performance, over the past three calendar years, in complying with the requirements of FAR 52.219-8, Utilization of Small Business Concerns to include a description and available documentation of the methods employed to promote SB utilization, the internal methods used to monitor such utilization, and any other information substantiating that the Offeror will satisfy the requirements of FAR 52.219-8.

L.4.3.3. Large Business Offerors shall provide proof of compliance with the requirements of FAR 52.219-9, Small Business Subcontracting Plan, for the past three calendar years under three separate relevant contracts, including documentation of the requirements such as copies of SF 294 Individual Subcontract Report using the Electronic

Subcontracting Reporting System or SF 295, Summary Subcontract Report if the Offeror has a Comprehensive Small Business Subcontracting Plan. If submitting SF 295 as a result of a Comprehensive Small Business Subcontracting Plan, provide actual achievements that correlate with the past three calendar years under the three separate relevant contracts identified. Large Businesses that have never held a contract incorporating 52.219-9 shall so state.

Offerors consisting of a joint venture (JV) that do not have three past relevant contracts can satisfy the above requirements by submitting the information of that of the managing partner of the joint venture. Offerors shall provide evidence of a corporate guarantee if one has been developed as part of the JV.

L.4.4 VOLUME IV: Factor 4 – Past Performance

L.4.4.1 The Offeror shall provide descriptions for at least two recent projects (and no more than four projects). Recent is defined as a contract that is ongoing or has been completed within the past three (3) years from the solicitation issuance date.

Relevant efforts are defined as software concurrency upgrades and software integration projects. The Offeror may include projects from predecessor companies, proposed WTCS V2 key personnel, and/or subcontractors. If an Offeror (or predecessor companies, proposed WTCS V2 key personnel, and/or subcontractors) does not have current or past relevant performance, the Offeror shall so state. Along with each project description, the Offeror shall provide a brief description of what role the key personnel and/or subcontractor referenced will play as it relates to WTCS V2 (no need for brief description if project description is relating to the WTCS V2 prime Offeror).

L.4.4.2 All past performance submitted in response to this solicitation shall have been performed as a prime contractor, subcontractor, or JV partner.

“Prime” contractor means the contractor has privity-of-contract with the Government or with the owner of a project or job, and has the full responsibility for its completion. The prime is responsible for all contractual obligations under a mutually binding legal relationship. When the Government awards a contract to a contractor, the contractor is considered the “prime” contractor. For example, “prime” contractors are identified as such on the cover page of contracts or task orders such as:

SF 1449 – Solicitation/Contract/Order for Commercial Items – (Block 17a identifies the prime contractor)

SF 26 – Award/Contract – (Block 7 identifies the prime contractor) SF 33 – Solicitation, Offer, and Award – (Block 15A identifies the prime contractor) Department of Defense (DD) Form 1155 – Order for Supplies or

Services (Block 9 identifies the prime contractor)

Optional Form 307 – Contract Award (Block 7 identifies the prime contractor)

GSA Form 300 – Order for Supplies and Services (Block 6 identifies the prime contractor)

“Subcontractor” means the contractor has privity-of-contract with a prime contractor. When a prime contractor awards a contract to a contractor, the contractor is considered a subcontractor.

If the Offeror represents the combining of two or more companies, a JV for the purpose of this solicitation, the JV will be evaluated as a single Offeror. The experience of each JV partner will be evaluated based on each partner’s role in cited past work and in the proposed JV role for this project.

L.4.4.3 Subcontractor Consent. Past Performance information pertaining to a subcontractor (if applicable) cannot be disclosed to the prime Offeror without the subcontractor’s consent; provide, within the Past Performance Volume, a letter from subcontractors stating their consent to the release of their past performance information to the prime contractor.

L.4.4.4 The Government will use information submitted by the Offeror and is free to use other sources such as other Federal Government offices, databases, and commercial sources, to assess past performance.

L.4.4.5 All information identified in the list below is required for any project associated with the prime Offeror (or predecessor company) and/or subcontractor(s):

Project/Contract Name, Contract Number, Delivery/Task Order and Location

Detailed Scope of Services Offeror’s Role (prime, subcontractor, JV) Contract Type and percentage of work self-performed Percentage and Type of Work Subcontracted Work conditions and/or challenges overcome Awarded cost/price Final cost/price (if applicable) Reason for the Cost Growth (if applicable) Scheduled Completion Date Actual Completion Date (if applicable) Government PCO or Contracting Officer Representative (COR) for

Reference (Name, Organization, Telephone Number, Email)

L.4.4.6 New Corporate Entities. New corporate entities may submit data on prior contracts involving its offices and employees. However, in addition to the other requirements in this section, the Offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above. Letters of Commitment shall be included in the proposal for these employees in order to be considered.

L.4.4.7 Past Performance Questionnaire. All contracts identified in a Past Performance Questionnaire must have the following completed and submitted.

The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to Christopher.l.crouch.civ@mail.mil. The Offeror shall e-mail to the Contracting Officer a list of all the POCs who were sent a questionnaire. The Government must receive this list no later than the proposal due date. The POC List shall be submitted in a table in MS Word to include the following fields: Solicitation Number;

Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E- Mail to POC (month/day).

L.4.4.8 Submissions. Offerors are discouraged from providing points of contact with another contractors’ facility, i.e., in case an Offeror (or one of his/her team members) is in a subcontract with another contractor who has submitted a proposal on the same requirement. Offerors shall provide and submit the prime contract number and all Governmental agency POCs in lieu of subcontract numbers or prime contract POCs in situations as described above.

L.4.4.9 Small Business Participation Past Performance. All Offerors shall submit information substantiating the Offerors’ past performance in complying with FAR 52.219-8, Utilization of Small Business Concerns, maximizing opportunities for U.S. small business subcontractors. Offerors shall also provide a statement indicating whether any negative information has been reported in the past six years concerning the Offerors’ past compliance with FAR 52.219-8. If any such negative information has been reported, the Offeror may submit explanations or comments responding to such negative information. Offerors with no prior contracts containing FAR 52.219-8 shall certify the same.

L.4.5 VOLUME IV: Factor 5 – Price Volume

L.4.5.1 There is no page limit on this volume. No cost or pricing data shall be included in any other volume. Volume V –Price Volume shall identify and include the Offeror’s CAGE Code. Offerors shall complete attachment 1 - Price Workbook.

L.4.5.2 Certified Cost and Pricing Data: Certified Cost and Pricing Data will not be required if adequate competition exists. If the Government determines adequate competition was not obtained, the Government reserves the right to request certified cost and pricing data.

L.4.5.3 Labor Rate Buildup: It is the Government’s intention to set labor ceiling rates (not-to-exceed, fully burdened labor rates) on this contract. Rate buildup information shall be provided in accordance with the instructions in Attachment 1 to include a clear description of the Offeror’s mathematical rate buildup methodology (that is, what each indirect rate is applied to/how the indirect rates and profit are applied).

L.4.5.4 Total Evaluated Price: The total evaluated price will consist of the sum of the proposed prices for the first delivery order and the for the sample task order as calculated in the Attachment 1, Price Workbook.

L.4.5.5 Proposed Labor Ceiling Rates Supporting Data: The Offeror shall provide sufficient information to support the reasonableness of their proposed labor ceiling rates (direct labor rates and indirect rates). Subcontractors may submit their proprietary cost/price information directly to the Government. Offerors are responsible for ensuring their subcontractors submit all required information prior to the proposal due date. A current FPRA (Forward Pricing Rate Agreement) or FPRR (Forward Pricing Rate Recommendation) with their cognizant ACO is preferred. If none is available, the Offeror will provide the following:

a. For direct labor rates: Offeror will submit the Basis of Estimate, along with supporting documentation and references, for Year 1 proposed direct labor rates for each and every proposed category. This may include current actual average rates, salary surveys, letters of intent, etc. The Government will evaluate the reasonableness of the supporting evidence (methodology, documentation, and source references) the Offeror utilized to develop the proposed direct rate. Offeror shall provide two years of actual direct labor rates, if available.

b. For indirect rates (for each and every proposed indirect rate): Offeror will identify the start and end of their fiscal year and the allocation/application base for each indirect rate. Offeror will state whether or not the prior years’ actuals have been audited by DCAA. Offeror will submit forecasted rates for each fiscal year covered in the solicitation (base, pool and calculated rate), and the actual pool, base, and calculated rates for the last two completed fiscal years. If Offeror does not have a budget or detailed forecast for all fiscal years covered in the solicitation, only the calculated rate information will be required for those fiscal years. Offeror will submit actual sales for each of the last two completed fiscal years and year-to-date actual sales. Offeror will submit forecasted sales (for the current fiscal year end and each fiscal year covered by this solicitation).

If a proposed rate is substantially less than the corresponding historical rate, the Offeror will provide narrative to explain the underlying reason(s) for the reduced rate.

L.4.5.6 Cognizant DCMA ACO and DCAA Supervisory Auditor: The Offeror shall submit contact information (name, telephone number and email address) for their cognizant DCMA ACO and cognizant DCAA supervisory auditor. If the Offeror is not assigned to DCMA for contract administration or is not assigned to DCAA for contract audit, the Offeror will identify their cognizant federal agency or agencies (and include the individual contact information). The Offeror shall submit a copy of the most recent ACO letter regarding the status of their accounting system. If the Offeror’s accounting system was disapproved or deemed to be not adequate, the Offeror will identify all deficiencies along with steps taken, or to be taken, to correct the deficiencies and a timeline to include audit by the cognizant audit agency after corrective action has been implemented. If the Offeror’s accounting system has never been audited by their cognizant federal audit agency, the Offeror will so state. If the Offeror does not have a DCAA approved accounting system, the Offeror shall complete the attached DCAA Checklist and SF1408.

L.4.5.7 Compliance. Failure to comply with the RFP requirements for Cost/Price information may result in an adverse assessment of an Offeror’s proposal and reduce or eliminate its chance of being selected for award. Offerors shall ensure that the information presented in this volume is consistent and correlates with the information contained in the other proposal volumes. Also, the Offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the SF33 and continuation sheets.

L.4.5.8 Offerors may decide to provide additional files to support its price proposal.

Such files must be clearly marked and may not be password protected. Electronic links are only permissible within the workbook and the links must be intact and maintained through all revisions. The Offeror shall not include pivot tables in Excel spreadsheets.

L.4.5.9 Basic ID/IQ Contract Maximum Allowable Labor Rates: The Government has determined that the Sample Order is representative of the work anticipated to be performed over the life of this contract. Therefore, the offeror shall provide the labor categories and labor rates necessary to perform the work by completing the “Labor Rates” tab in Attachment 1. The Government has provided labor categories for use on this contract. The Offeror shall input fully burdened labor rates, and its estimate of the number of hours to complete the Sample Order. These fully burdened labor rates will be incorporated as an attachment to the contract as maximum allowable rates to be used when pricing future delivery orders. The proposed labor categories are not all inclusive. Additional labor categories may be proposed and negotiated at the order level if deemed necessary and acceptable by the Government to accomplish the delivery order requirements. The rates proposed for the additional labor categories should be commensurate with the pricing/estimating methodology employed to establish the rates awarded with the basic contract. Fully burdened labor rate escalation will be capped at 5% per contract year. Any new rates will be evaluated for fair and reasonableness, in accordance with FAR Subpart 15.4.

L.4.6 VOLUME V: Admin Volume

L.4.6.1 Section 1 – Executive Summary. A letter formally transmitting the proposal shall include:

a. Table of Contents. A list that identifies the location of all major topics provided in each volume.

b. Statement of Compliance. Each Offeror shall include a statement indicating complete compliance with the solicitation, or detailed analysis of any objections, exceptions, contingencies, or additions.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .