Att9-SOFRAPTORIV-PWS-TO-0001-SetUpPlan-Draft.pdf
PDF 198 KB Posted
- Attached to
- SOF RAPTOR IV - Draft RFP Federal contract opportunity
- Solicitation number
- W900KK-19-R-0078
About this file
This performance work statement outlines requirements for a program management setup plan to support the SOF RAPTOR IV contract. The contractor shall develop procedures to phase in performance within one month of award in Spring 2019, including an executive summary, work execution plan during setup, and schedule with milestones. During the contract phase-in period the contractor must obtain certifications and clearances, security clearances for personnel, and attend meetings to support task order proposals and statements of work. The proposed price for the program management setup plan cannot exceed $10,000.
Att9-SOFRAPTORIV-PWS-TO-0001-SetUpPan-Draft
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOF_RAPTOR_IV_Presolicitation_Conference_slides_20Sep2018.pdf | ||
| Att1b-SOFRAPTORIV-PWS-STO-SA-Draft.pdf | ||
| Att1-SOFRAPTORIVBase-PWS-Draft.pdf | ||
| Att1d-SOFRAPTORIV-PWS-STO-CRF-Draft.pdf | ||
| Att6-SOFRAPTORIV-Example-CDRL-Report-Draft.pdf | ||
| Att3-SOFRAPTORIV-QASP-Draft.pdf.pdf | ||
| Att1c-SOFRAPTORIV-PWS-STO-STS-Draft.pdf | ||
| Att7-SOFRAPTORIV-PricingWorkbook-Draft.xls | XLS spreadsheet | |
| Att1a-SOFRAPTORIV-PWS-STO-UW-Draft.pdf | ||
| W900KK19R0078-SOFRAPTORIV-Solicitation-draft.pdf | ||
| Att5-SOFRAPTORIV-ProposalAdequacyChecklist-Draft.pdf | ||
| Att8-SOFRAPTORIV-SolicitationClarificationForm-Draft.doc | DOC document | |
| Att2-SOFRAPTORIV-DD254-Draft.pdf | ||
| Att4-SOFRAPTORIV-LaborCategories-Draft.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOF RAPTOR IV
TASK ORDER 0001 – PROGRAM MANAGEMENT SETUP PLAN
PERFORMANCE WORK STATEMENT (PWS)
1. Program Management Setup Plan. The Contractor shall be required to provide a setup plan to be implemented following contract award. The following details are provided and shall be considered in the Contractors process:
1.1 Phase-In Periods. The Contractor shall develop procedures for phasing in Contractor performance to the level required within the time allowed under the terms of this contract starting from time of award (Spring 2019) to one month after contract award. The Contractor shall include their plans for a Program Management Setup Plan in accordance with the suggested outline provided below.
1.1.1 Setup Plan
a. Executive Summary:
The purpose of the executive summary is to describe the setup plan at a high level and what the plan should accomplish. This section should include an overview of the management plan setup (i.e. location, long lead challenges, confirmed teaming arrangements and/or the timeframe/period of transition.)
b. Work Execution during Setup:
Discuss the level of work which is to be performed during the setup period.
c. Schedule:
This section should contain schedule of the setup plan. The complexity of the setup will dictate the level of detail required in the schedule. However, all major milestones as well as setup start and completion dates should be included at a minimum.
1.2 Phase-In Period – Contract. The period between contract award and contract commencement will constitute the Contract phase-in period. During the Contract phase-in period, the Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this contract. Therefore, the Contractor should be completely established, have all processes/plans in place and be ready to propose any new efforts issued by PM STS by xx 2019, or one month from contract award. The Contractor shall take all actions required for a smooth transition to support total contract operations as proposed and accepted. During the Contract phase-in period, the Contract shall at a minimum: obtain all required certifications and clearances, obtain all required personnel security clearances, attend post-award meetings as required, and be postured to propose on any new task order Requests for
Proposals and Statements of Work required to support the Government under this contract.
1.3 Budget. The proposed price of the Program Management Setup Plan shall not exceed the Government’s budgetary constraint of $10,000.