Technical_Exhibit_1-PRS.docx

DOCX document 38 KB Posted

Attached to
DRAFT SOLICITATION: Unmanned Aircraft Systems Instruction and Mission Support (UAS IMS)
Solicitation number
W900KK-17-R-0019
Issued by

About this file

Technical Exhibit 1-PRS (Draft)

View the file

Other files

File Type Posted
Questions_and_Answers.pdf PDF
QA_Set_One.pdf PDF
W900KK-17-R-0019_draft.docx DOCX document
Technical_Exhibit_2-UAS_Labor_Cat._Description.docx DOCX document
Attachment_H-Training_Limits.xls XLS spreadsheet
Attachment_G-DD254.pdf PDF
Attachment_I-Base_PWS.docx DOCX document
Attachment_A-Nondisclosure.docx DOCX document
Attachment_C-Travel_Authorization_Form.docx DOCX document
Attachment_02-Compliance_Matrix.xlsx XLSX spreadsheet
Attachment_06-UAS_Course_Data.docx DOCX document
Attachment_05-TO_0001_PWS.docx DOCX document
Course_Management_For_Reference_Documents.zip ZIP file
Attachment_F-Government_Provided_Work_Stations.docx DOCX document
Attachment_E-Customer_Feedback_Form.docx DOCX document
Technical_Exhibit_3-CDRL.docx DOCX document
Attachment_04-CostPriceWorkbook.xlsx XLSX spreadsheet
Attachment_B-Sensitive_Date_Nondisclosure.docx DOCX document
Attachment_03-Pre-Award_Survey_of_Prospective_Contractor_Accounting_System.pdf PDF
Attachment_K-AR_95-20.pdf PDF
Attachment_D-Problem_Notification_Form.docx DOCX document
Attachment_01-UAS_IMS_Clarification_Form.doc DOC document
UAS_IMS_PWS_Draft_11_APR_17.docx DOCX document
UAS_FBO_10Apr17.pdf PDF
UAS_IMS_Draft_CPFF_language_10_APR_17.docx DOCX document
UAS_IMS_Draft_EvalCriteria_10_APR_17.docx DOCX document
UAS_IMS_Draft_Section_B_10_APR_17.docx DOCX document
UAS_SiteVisitMap_VanDemanGateToChaffeeParadeField.pdf PDF
REVISED_UAS_Site_Visit_Instruction_07APR17.docx DOCX document
UAS_Site_Visit_Instruction.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Requirement Summary (PRS)

Due to the range of deliverables at each TO, the sample PRS below is to be used as a guide to develop TO PRS. The specific PRS will be identified in each task order.

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PWS
Key Requirement
Method of Surveillance
Performance Metrics
Evaluation Method
Plan
6.2.2
UAS Unmanned Ground School Common Core Instruction
Planned Sampling
All authorized instructor positions are filled and are certified to instruct IAW the PWS, on site and support the Government within 90 days of hire.

Quality No more than 20% of instructors receive a score of 70-79% on quarterly instructor evaluation.

CPARs rating
1
6.2.3
UAS Unmanned Scout Operations Common Core Instruction
Planned Sampling
All authorized instructor positions are filled and are certified to instruct IAW the PWS, on site and support the Government within 90 days of hire.

Quality No more than 20% of instructors receive a score of 70-79% on quarterly instructor evaluation.

CPARs rating
2
6.2.4
UAS Shadow Mission Systems Instruction
Planned Sampling
All instructor positions are filled and certified to instruct IAW with the PWS requirements within 60 days of hire date.

Quality- 80% of all instructors have completed the EP/DP MOI Process of all equipment and are certified to instruct IAW the PWS.

No more than 20% of instructors receive a score of 70-79% on quarterly instructor evaluation

CPARs rating
3
6.2.5
UAS Flight Operations Instruction
Planned Sampling
Fill Rate with Proponent Certification of at least 80% of all authorized Contractor instructor positions are filled and are certified to instruct.

Quality 90% of all instructors complete the MOI Process timely and maintain currency IAW AR 95-20.

More than 90% of all instructor standardization evaluations at 80% or better.

CPARs rating
4

6.2.6

UAS Instructor Operator Instruction
Planned Sampling
Fill Rate with Proponent Certification at least 75% of all authorized Contractor instructor positions are filled and are certified to instruct. Quality – 75% of all contract instructors complete the MOI process timely and maintain currency IAW AR 95-20. More than 90% of all instructor standardization evaluations at 80% or better.
CPARs rating
5

6.2.7-6.2.8

UAS Shadow & Gray Eagle Maintainenance Instruction
Planned Sampling
Fill Rate with Proponent Certification At least 85% of all authorized Contractor instructor positions are filled and are certified to instruct IAW the PWS

Quality – 100% of contract instructors pass an instructor evaluation. Pass is defined as a minimum score of 2.0 with no single area rated lower than 2.0

CPARs rating
6
6.2.9
UAS Instrument Flight Rules Instruction
Planned Sampling
All authorized instructor positions are filled and are certified to instruct IAW the PWS within 60 days of hire.

Quality – No more than 20% of instructors receive a score of 70-79% on quarterly instructor evaluation.

CPARs rating
7
6.2.10
UAS Warrant Officers Course Instruction
Planned Sampling
All authorized instructor positions are filled and certified to instruct IAW the PWS within 90 days of hire date.

Quality- No more than 20% of instructors receive a score of 70-79% on quarterly instructor evaluation

CPARs rating
9
6.3
IT Network Administration
Planned Sampling
Workforce:: At least 90% of new hires are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

Quality: At least 90% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times

CPARs rating
11
6.4.1-6.4.3
1. Ground Flight Observers

2. Flight Line Operations Support

3. Mission Support

Planned Sampling
Workforce: At least 90% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

2. Have a valid Class II Flight Physical within 20 working days from hire date and individual Flight Physicals are maintained in accordance with established Flight Physical policies and procedures.

3. Are licensed on required support vehicles within 90 working days from hire date Quality: At least 90% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times

CPARs rating
14
6..5
Special Training Material Support
Planned Sampling
Workforce: At least 90% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

Quality: At least 90% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times

CPARs rating
15
6.6.1-6.6.2
1. Maintenance Training Tool Room

2. Logistics Specialist Support

Planned Sampling
Workforce: At least 90% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

Quality: At least 90% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times CPARs rating

6.2.2 UGS Common Core Instruction PRS Matrix:

Elements Level of performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Fill Rate with Proponent Certification
All instructor positions are filled and certified to instruct IAW the PWS requirements
All instructor positions are filled and certified to instruct IAW the PWS requirements within 60 days of hire date.
All authorized instructor positions are filled and are certified to instruct IAW with the PWS requirements within 90 days.
Vacant instructor positions require more than 90 working days of vacancy to be certified to instruct IAW the PWS requirements
One or more instructor positions unfilled greater than 30 days.
Quality
All instructors receive a 95 - 100% score on their quarterly instructor evaluation.
All instructors receive an 80 - 94% score on their quarterly instructor evaluation.
No more than 20% of instructors receive a score of 70-79% on quarterly instructor evaluation
More than 20% of instructors receives a score of 60-69% on their quarterly instructor evaluation
More than one instructor receives a score of less than 60% on their quarterly instructor evaluation.

6.2.3 USO Common Core Instruction PRS Matrix

Level of Performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Fill Rate with Proponent Certification
All instructor positions are filled and certified to instruct IAW the PWS requirements.
All instructor positions are filled and certified to instruct IAW with the PWS requirements within 60 days of hire date.
All instructor positions are filled and certified to instruct IAW with the PWS requirements within 90 days of hire date.
Vacant instructor positions require more than 90 working days of vacancy to be certified to instruct IAW the PWS requirements
One or more instructor positions unfilled greater than 30 days.
Quality
All instructors receive a 95-100% score on their quarterly instructor evaluation
All instructors receive an 80 - 94% score on their quarterly instructor evaluation
No more than 20% of instructors receive a score of 70-79% on quarterly instructor evaluation
More than 20% of instructors receives a score of 60-69% on their quarterly instructor evaluation
More than one instructor receives a score of less than 60% on their quarterly instructor evaluation

6.2.4 UAS Shadow Mission Systems Instruction PRS Matrix

Level of Performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Fill Rate with Proponent Certification
All instructor positions are filled and certified to instruct IAW the PWS requirements
All instructor positions are filled and certified to instruct IAW the PWS requirements within 45 days of hire date.
All instructor positions are filled and certified to instruct IAW with the PWS requirements within 60 days of hire date.
Vacant instructor positions require more than 60 working days of vacancy to be certified to instruct IAW the PWS requirements
One or more instructor positions unfilled greater than 30 days.
Quality
All instructors have completed the EP/DP MOI Process of all equipment and are certified to instruct IAW the PWS.

All instructors receive a 95-100% score on their quarterly instructor evaluation 90% of all instructors have completed the EP/DP MOI Process of all equipment and are certified to instruct IAW the PWS.

All instructors receive an 80 - 94% score on their quarterly instructor evaluation.

80% of all instructors have completed the EP/DP MOI Process of all equipment and are certified to instruct IAW the PWS..

No more than 20% of instructors receive a score of 70-79% on quarterly instructor evaluation 70% of all instructors have completed the EP/DP MOI Process of all equipment and are certified to instruct IAW the PWS.

No more than 20% of instructors receives a score of 60-69% on their quarterly instructor evaluation More than one instructor receives a score of less than 60% on their quarterly instructor evaluation.

6.2.5 UAS Flight Operations Instruction PRS Matrix

Level of Performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Fill Rate with Proponent Certification
All authorized instructor positions are filled and are certified to instruct IAW the PWS.
At least 90% of all authorized instructor positions are filled and are certified to instruct IAW the PWS.
At least 80% of all authorized instructor positions are filled and are certified to instruct IAW the PWS.
At least 70% of all authorized instructor positions are filled and are certified to instruct IAW the PWS.
Less than 70% of all authorized instructor positions are filled and are certified to instruct IAW the PWS.

One or more instructor positions unfilled greater than 30 days.

Quality
All instructors have complete the MOI Process timely and maintain currency IAW AR 95-20

All instructors pass their standardization evaluations with a score of 80% or better.

95% of all instructors complete the MOI Process timely and maintain currency IAW AR 95-20

More than 95% of all instructor standardization evaluations at 80% or better.

90% of all instructors complete the MOI Process timely and maintain currency IAW AR 95-20

More than 90% of instructors pass their standardization evaluations with a score of 80% or better No more than 5% persons failing to meet their APART, currency and MOI process requirements.

No more than 5% instructors fail their standardization evaluation with a score of less than 80%.

More than 5% instructors failing to meet their APART, currency and MOI process requirements.

More than 5% of instructors fail their standardization evaluation with a score of less than 80%.

6.2.6 UAS IO Course Instruction PRS Matrix

Level of Performance

Exceptional
Satisfactory
Unsatisfactory
Fill Rate with Proponent Certification
All instructor positions are filled and certified to instruct.
At least 75% of all authorized instructor positions are filled and are certified to instruct.
One or more instructor positions unfilled greater than 30 days.
Quality
All instructors have complete the MOI Process timely and maintain currency IAW AR 95-20

All instructors pass their standardization evaluations with a score of 80% or better At least 75% of instructors have completed the MOI Process timely and maintain currency IAW AR 95-20 More than 90% of instructors pass their standardization evaluations with a score of 80% or better.

More than 25% persons failing to meet their APART, currency and MOI process requirements.

More than 25% instructors failing their standardization evaluation less than 79%.

6.2.7-6.2.8 UAS Shadow & Gray Eagle Maintenance Instruction PRS Matrix

Level of Performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Fill Rate with Proponent Certification
All instructor positions are filled and are certified to instruct IAW the PWS.
At least 90% of all authorized instructor positions are filled and are certified to instruct IAW the PWS.
At least 85% of all authorized instructor positions are filled and are certified to instruct IAW the PWS
At least 80% of all authorized instructor positions are filled and are certified to instruct IAW the PWS.
Less than 79% of instructor positions are filled and are certified to instruct IAW the PWS.

One or more instructor positions unfilled greater than 30 days.

Quality
All instructor evaluations have a minimum score of 4.0, with no single area being rated lower than 3.0, and no personnel failing their evaluation
At least 50% of instructor evaluations have a minimum score of 4.0, with no single area being rated lower than 3.0, and no personnel failing their evaluation.
100% of Contract instructors pass an instructor evaluation. Pass is defined as a minimum score of 2.0 with no single area rated lower than 2.0.
No more than one person failing their evaluation.
More than one person failing their evaluation

6.2.9 UAS IFR Instruction PRS Matrix

Level of Performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Fill Rate with Proponent Certification
All authorized instructor positions are filled and certified to instruct IAW the PWS.
All instructor positions are filled and certified to instruct IAW the PWS requirements within 45 days of hire date
All authorized instructor positions are filled and are certified to instruct IAW with the PWS requirements within 60 days of hire date.
All authorized instructor positions are filled and are not certified to instruct IAW the PWS requirements within 60 days of date.
One or more instructor positions unfilled greater than 30 days.
Quality
All instructors receive a 95 - 100% score on their quarterly instructor evaluation
All instructors receive an 80 - 94% score on their quarterly instructor evaluation
No more than 20% of instructors receive a score of 70-79% on quarterly instructor evaluation
More than 20% of instructors receives a score of 60-69% on their quarterly instructor evaluation
One or more instructor receives a score of less than 59% on their quarterly instructor evaluation

6.2.10 UAS Warrant Officers Course Instruction PRS Matrix

Level of Performance

Exceptional
Satisfactory
Unsatisfactory
Fill Rate with Proponent Certification
All instructor positions are filled and are certified to instruct IAW the PWS.
All authorized instructor positions are filled and certified to instruct IAW the PWS within 90 days of hire date.
One or more instructor positions unfilled greater than 30 days.
Quality
All instructors receive a 90-100% score on their quarterly instructor evaluation
No more than 20% of instructors receive a score of 70-89% on quarterly instructor evaluation
One or more instructor receives a score of less than 69% on their quarterly instructor evaluation

6.3 IT Network Administration PRS Matrix

Levels of Performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Workforce
All new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

At least 95% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

At least 90% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

At least 85% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

Under 80% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

One or more positions unfilled greater than 30 days.

Quality
100 percent of operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 95% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 90% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 85% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
Under 80% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times

6.4.1-6.4.3 Flight Line Operations and Mission Support: Ground Flight Observers, Flight Line Operations Support, and Mission Support PRS Matrix

Levels of Performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Workforce
All new hires:

1. Are qualified and current in tasks stipulated in the PWS within 30 working days from hire date.

2. Have a valid Class II Flight Physical within 20 working days from hire date and individual Flight Physicals are maintained in accordance with established Flight Physical policies and procedures.

3. Are licensed on required support vehicles within 90 working days from hire date At least 95% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 30 working days from hire date.

2. Have a valid Class II Flight Physical within 20 working days from hire date and individual Flight Physicals are maintained in accordance with established Flight Physical policies and procedures.

3. Are licensed on required support vehicles within 90 working days from hire date At least 90% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 30 working days from hire date.

2. Have a valid Class II Flight Physical within 20 working days from hire date and individual Flight Physicals are maintained in accordance with established Flight Physical policies and procedures.

3. Are licensed on required support vehicles within 90 working days from hire date At least 80% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 30 working days from hire date.

2. Have a valid Class II Flight Physical within 20 working days from hire date and individual Flight Physicals are maintained in accordance with established Flight Physical policies and procedures.

3. Are licensed on required support vehicles within 90 working days from hire date

Under 80% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 30 working days from hire date.

2. Have a valid Class II Flight Physical within 20 working days from hire date and individual Flight Physicals are maintained in accordance with established Flight Physical policies and procedures.

3. Are licensed on required support vehicles within 90 working days from hire date

4. One or more positions unfilled greater than 30 days.

Quality
100 percent of operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 95% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 90% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 80% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
Under 80% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times

6.5 Special Training Material Support PRS Matrix

Levels of Performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Workforce
All new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

At least 95% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

At least 90% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

At least 85% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

Under 80% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

One or more positions unfilled greater than 30 days.

Quality
100 percent of operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 95% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 90% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 85% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
Under 80% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times

6.6-6.6.2 Logistics Support: Maintenance Training Tool Room and Logistics Specialist Support PRS Matrix

Levels of Performance

Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Workforce
All new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

At least 95% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

At least 90% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

At least 85% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

Under 80% of new hires:

1. Are qualified and current in tasks stipulated in the PWS within 60 working days from hire date.

One or more positions unfilled greater than 30 days.

Quality
100 percent of operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 95% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 90% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
At least 85% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times
Under 80% of all operational support tasks as defined in the PWS are completed within scheduled completion dates/times