W900KK-17-R-0003_Final_Solicitation_13_Jan_2017.pdf.docx_V.docx
DOCX document 423 KB Posted
- Solicitation number
- W900KK-17-R-0003
About this file
NETCM PGS RFP
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W900KK-17-R-0003
Section A - Solicitation/Contract Form
SUPPLIES SERVICES AND PRICE
This solicitation will result in a single award “C” type Cost Plus Fixed Fee Completion Contract. The period of performance is 3 years (36 months period).
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
NETCM PGS
CPFF
Nuclear Effects Test Capability Modernization (NETCM) Prompt Gamma Simulator (PGS) development to include activities from contract award through final Government acceptance with the exception of CLIN 0003, NETCM PGS Testing and Acceptance which is separately priced and in accordance with NETCM PGS Statement of Work, PEO STRI-15-W001 Attachment 1, Performance Specification, PRF-PT-000659, Attachment 2.
FOB: Destination
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
NETCM PGS CDRLs
FFP
Contract Data Requirements Lists (CDRLs), in accordance with Section J, Exhibits A.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
NETCM PGS Testing and Acceptance
CPFF
NETCM PGS testing and acceptance in accordance with NETCM PGS Statement of Work, PEO STRI-15-W001 Attachment 1, and Performance Specification, PRF-PT-000659, Attachment 2.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
NETCM PGS Training
FFP
Training in accordance with applicable sections of NETCM PGS Statement of Work, PEO STRI-15-W001 Attachment 1, and Performance Specification, PRF-PT-000659, Attachment 2.
NET AMT
Section C - Descriptions and Specifications
C.1 REQUIREMENTS DOCUMENTS
C.1 The Statement of Work (PEO STRI-15-W001) and the Performance Specification (PRF-PT-00659) for the overall effort are attached in Section J of this document.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION
Inspection and acceptance of technical data and information will be performed by an authorized requiring activity representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be performed by the requiring activity representative and evidenced via execution of an electronic Receiving Report submitted by the contractor in the Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) module within the Wide Area Work Flow e-Business suite.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-8 |
| Inspection Of Research And Development Cost Reimbursement |
| MAY 2001 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
Section F - Deliveries or Performance
F.1 DELIVERY
All items shall be delivered by the Contractor, F.O.B. Destination, all transportation charges prepaid, to the destinations specified in the contract. The term "delivery" means successful completion of all requirements set forth in the individual Delivery Order, to include manufacturing/installation, inspection and acceptance, as specified. Delivery is considered complete upon execution of an unconditional DD Form 250, Material Inspection and Receiving Report for items requiring submission of a DD Form 250 through the Wide Area Work Flow (WAWF) system, and/or upon receipt of a second endorsement acceptance by the Procuring Contracting Officer on PEO STRI 4330/60, Data Item Transmittal/ Acceptance/Rejection Form, which is provided as an attachment to this contract.
The Government anticipates delivery to the following location:
White Sands Missile Range, Survivability, Vulnerability Assessment Directorate, ATTN: TEDTWSVN (Mr.Gustavo Sierra), White Sands Missile Range, NM 88002. Point of Contact: Mr. Gustavo Sierra (575) 678-2038. Building Number yet to be determined as is currently under design and construction.
TECHNICAL DATA AND INFORMATION
| Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit A, attached hereto, and the following: | ||
| (a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, which are listed in Block 6 of the DD Form 1423. | ||
| (1) PCO, Marnita Harris, ACC-ORL-OPB | ||
| (2) ACO, Code (See block 6 for code and office address) | ||
| (b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO. | ||
| (c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6. | ||
| (d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above. | ||
| (e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government. | ||
| (f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection. | ||
| (g) DD Form 1423, Block 14 Mailing Addresses: Mr. Bob Arora, 12211 Science Drive, ATTN: SFAE-STRI-ITTS, Orlando, FL 32826-3224 |
COR: Bob Arora, PM ITTS-IMO, 12211 Science Drive, Orlando, Florida 32826
PCO: Marnita R. Harris, ACC-ORL-OPB, via Contract Specialist (CS)
CS: Ramon Otero, ACC-ORL-OPB, ramon.otero10.civ@mail.mil
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 0001 |
| 26-JUL-2020 |
| 1 |
| U.S. ARMY WHITE SANDS MISSILE RANGE |
GUSTAVO L. SIERRA
SHIPPING AND RECEIVING
BLDG 1
WHITE SANDS NM 880002
575.678.2038
W81C39
| 0002 |
| 26-JUL-2020 |
(SAME AS PREVIOUS LOCATION)
W81C39
| 0003 |
| 26-MAY-2020 |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
W81C39
| 0004 |
| 26-JUL-2020 |
(SAME AS PREVIOUS LOCATION)
W81C39
| 52.211-17 |
| Delivery of Excess Quantities |
| SEP 1989 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
Section G - Contract Administration Data
CONTRACTOR’S AUTHORIZED CONTRACT COORDINATOR AND TECHNICAL LIAISON
| (a) The contractor shall state below the name and telephone numbers of the contractor’s employees responsible for coordination of contract functions/liaison with the Contracting Officer and/or Contract administrator, and providing technical assistance as required regarding product specifications, functionality, etc. | |||
| CONTRACT COORDINATOR: | |||
| NAME: | _______________________________________ | ||
| PHONE (BUS): ___________________________________ | |||
| PHONE (AFTER HOURS): _________________________ | |||
| ALTERNATE: | |||
| NAME: | _______________________________________ | ||
| PHONE (BUS): ___________________________________ | |||
| PHONE (AFTER HOURS): _________________________ | |||
| (b) The contractor shall notify the Contracting Officer and/or Contract Administrator in advance, in writing, of any changes in the above listed personnel. |
DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE (COR)
| (a) The Contracting Officer has designated Mr. Bob Arora, 12211 Science Drive, Orlando, FL 32826 as the authorized Contracting Officer’s Representative (COR) for this contract. |
| (b) The duties of the COR are limited to the following: |
1. Ensure contractor personnel requiring access to the Government facilities adhere to the check-in and out procedures.
2. Work cooperatively with members of the acquisition team.
3. Review, comment, and report on the contractor's progress and ensure the contractor complies with reporting requirements.
4. Read and understand the COR’s role and responsibilities in the Contractor Performance Assessment Reporting Systems (CPARS) process to include maintaining documentation that supports the CPARS assessments.
5. Provide an independent government estimate of desired or ordered work.
6. Keep track of funds expended and remaining funds available so as not to overspend on the contract or order.
7. Accept services and/or deliverables when completed, unless otherwise specified in the contract or order, and certify when all deliverables have been accepted by the government.
8. Pay particular attention to the timely review of invoices (as applicable).
9. Obtain refresher training as required by reference a. or as required by the Contracting Officer.
10. Promptly notify and provide recommended corrective action to the Contracting Officer and the COR’s superior of any of the following:
a. Any violation of or deviation from the technical requirements of the contract.
b. Inefficient or wasteful methods in use by the contractor, including the contractor exceeding the requirements of the order or contract.
c. Any contractor request for changes to the contract.
d. Issues that require clarification or resolution.
e. Instances where funds may be insufficient to complete the contract or order.
f. Conditions requiring a replacement for you as COR.
g. Improper use of government material, equipment, or property.
11. Ensure the contract does not become a vehicle for personal services as described in reference 2.b.
12. Review engineering studies, design, or value engineering proposals submitted by the contractor to determine their feasibility.
13. When required, review, comment, and report on the annual and final performance assessment reports of the contractor as to compliance with technical instructions, timeliness, and any problems associated with the contract or order, in a timely manner.
14. Address contribution in the annual performance review.
DISCLOSURE, USE AND PROTECTION OF PROPRIETARY INFORMATION
| (a) During the performance of this contract, the Government may use an independent services contractor (ISC), who is neither an agent nor employee of the Government. The ISC may be used to conduct reviews, evaluations, or independent verification and validations of technical documents submitted to the Government during performance. |
| (b) The use of an ISC is solely for the convenience of the Government. The ISC has no obligation to the prime contractor. The prime contractor is required to provide full cooperation, working facilities and access to the ISC for the purposes stated in paragraph (a) above. |
| (c) Since the ISC is neither an employee nor agent of the Government, any findings, recommendations, analyses, or conclusions of such a contractor are not those of the Government. |
| (d) The prime contractor acknowledges that the Government has the right to use ISCs as stated in paragraph (a) above. It is possible that under such an arrangement the ISC may require access to or the use of information (other than restricted cost or pricing data), which is proprietary to the prime contractor. |
| (e) To protect any such proprietary information from disclosure or use, and to establish the respective rights and duties of both the ISC and prime contractor, the prime contractor agrees to enter into a direct agreement with any ISC as the Government requires. A properly executed copy (per FAR 9.505-4) of the agreement will be provided to the Procuring Contracting Officer. |
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
| (a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the contractor’s facilities or in any other manner communicates with contractor personnel during the performance of this contract shall constitute a change under the “Changes” clause of this contract. |
| (b) The contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract. |
| (c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer’s. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer is: Ms. Marnita Harris, Procuring Contracting Officer, 12211 Science Drive, Orlando, FL 32826 Phone: (407) 208-3294. |
CLAUSES INCORPORATED BY FULL TEXT
252.204-0002 LINE ITEM SPECIFIC: SEQUENTIAL ACRN ORDER. (SEP 2009)
The payment office shall make payment in sequential ACRN order within the line item, exhausting all funds in the previous ACRN before paying from the next ACRN using the following sequential order: Alpha/Alpha; Alpha/numeric; numeric/alpha; and numeric/numeric.
(End of clause)
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Cost Voucher/Stand Alone/Receiving Report
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
Routing Data Table –Contract Data Requirements List (CDRL) Submittal via Stand-alone Receiving Report – Destination Inspection and Destination Acceptance (Inspection and Acceptance by PEO STRI)
| Field Name in WAWF |
| Data to be entered in WAWF |
| Pay Official DoDAAC |
| TBD - DFAS Office responsible for payment |
| Issue By DoDAAC |
| W900KK |
| Admin By DoDAAC |
| TBD - Office responsible for administration; DCMA, ONR or ACC-ORL (W900KK) |
| Inspect By DoDAAC |
| W906ZL (Program personnel to perform inspection) |
| Ship To Code |
| W906ZL (Engineer) |
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table – Cost Voucher – (Cost Type, Labor Hours or T&M Line Items)
| Field Name in WAWF |
| Data to be entered in WAWF |
| Pay Official DoDAAC |
| TBD DFAS Office responsible for payment |
| Issue By DoDAAC |
| W900KK |
| Admin By DoDAAC |
| TBD Office responsible for administration; DCMA, ONR or ACC-Orlando (W900KK)) |
DCAA Auditor (DoDAAC) (for interim vouchers) TBD DoDAAC for cognizant DCAA office
Service Approver (DoDAAC) (for final voucher) DoDAAC of office responsible for signing/providing acceptance of final Cost Voucher: DCMA (if DCMA administers) or ACC-Orlando (W900KK)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
| NAME |
| EMAIL ADDRESS |
| TELEPHONE # |
| TITLE / WAWF ROLE (S) |
| Bob Arora |
| bobby.arora.civ@mail.mil |
| 407-384-3976 |
| COR/Inspector & Acceptor (I/A) |
| Erick Serrano |
| erick.s.serrano.civ@mail.mil |
| 407-384-5128 |
| PD or Eng/Alternate Acceptor |
| Marnita R. Harris |
| marnita.r.harris.civ@mail.mil |
| 407-208-3294 |
| Contracting Officer (PCO Acceptor) |
| Ramon Otero |
| ramon.otero10.civ@mail.mil |
| 407-208-3481 |
| Contract Specialist/Issue By View Only (IBVO) |
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contac
| NAME |
| EMAIL ADDRESS |
| TELEPHONE # |
| WAWF ROLE |
| Ron Crowder |
| ronald.j.crowder.civ@mail.mil |
| 407-208-3032 |
| Group Administrator (GAM) Primary |
| Thomas Bunch |
| thomas.j.bunch.civ@mail.mil |
| 407-384-3792 |
| GAM Alternate |
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
Section H - Special Contract Requirements
H.1 SMALL BUSINESS PARTICIPATION
Small Business Participation data shall be submitted on a quarterly basis in accordance with the Small Business Participation form as Attached in Section J. If, at any time during contract performance, the Contracting Officer determines that Small Business participation levels are not being maintained at or above the goal, the Contractor will be required to submit a plan for reallocating resources in a manner that will ensure the goal will be met. The reallocation plan shall be submitted no later than 15 days after notice from the Contracting Officer and implementation should begin within 20 days thereafter.
Awardees proposed Small Business Participation Plan and goals will be incorporated into the resulting contract as a Section J attachment. Small Business participation dollars and percentages shall be measured by comparing the total actual contract dollars performed by Small Business concerns to the total yearly obligated value of the contract. Failure to meet the overall Small Business Participation in each 12 months of performance beginning upon contract award will affect the assessment provided in the Contractor Performance Assessment Report under Utilization of Small Business.
H.2 GOVERNMENT INSTALLATION WORK SCHEDULE
| (a) The Holidays applicable to this contract are: New Year’s Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day. |
| (b) In the event that the contractor is prevented from performance as the result of an Executive Order or an administrative leave determination that applies to the using activity, such time may be charged to the contract as a direct cost provided such charges are consistent with the contractor’s accounting practices. In the event that any of the above holidays occur on a Saturday or Sunday, then such holiday shall be observed as they are by the assigned Government employees at the using activity. |
H.3 AVAILABILITY OF DATA ITEM DESCRIPTIONS (DIDs)
All Data Item Descriptions (DIDs) are available online via the Acquisition Streamlining and Standardization Information System located at http://quicksearch.dla.mil.
H.4 LIABILITY INSURANCE
| The following types of insurance are required in accordance with the Clause entitled, [ “FAR 52.228-5, “Insurance--Work on a Government Installation” and shall be maintained in the minimum amounts shown: |
| (a) Comprehensive General Liability: $200,000 per person and $500,000 or other per accident for bodily injury. |
| (b) Automobile Insurance: $200,000 per person and $500,000 per accident for bodily injury and $500,000 per accident for property damage. |
| (c) Standard Workman’s Compensation and Employer’s Liability Insurance (or, where maritime employment is involved, Longshoremen’s and Harbor Worker’s Compensation Insurance) in the minimum amount of $100,000. |
| (d) Aircraft public and passenger liability: $$200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability; $ $200,000 per occurrence for property damage. Passenger bodily injury liability limits of $200,000 per passenger, multiplied by the number of seats or number of passengers, whichever is greater. |
H.5 REIMBURSEMENT OF TRAVEL, PER DIEM, AND SPECIAL MATERIAL COSTS
(a) Area of Travel. Performance under this contract may require travel by contractor personnel. If travel, domestic or overseas, is required, the contractor is responsible for making all necessary arrangements for its personnel. These include but are not limited to: medical examinations, immunizations, passports/visas/etc., and security clearances.
| (b) Travel Policy. The Government will reimburse the contractor for allowable travel costs incurred by the contractor in performance of the contract in accordance with FAR Subpart 31.2. Travel required for tasks assigned under this contract shall be governed in accordance with: Joint Travel Regulations, prescribed by the General Services Administration for travel in the conterminous 48 United States, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense, for travel in Alaska, Hawaii, The Commonwealth of Puerto Rico, and territories and possessions of the United States (hereinafter JTR); and Standardized Regulations (Government Civilians, Foreign Areas), Section 925, "Maximum Travel Per Diem Allowances for Foreign Areas," prescribed by the Department of State, for travel in areas not covered in the JTR (hereinafter the SR). | |
| (c) Travel. Travel and subsistence are authorized for travel beyond a fifty-mile radius of the contractor’s office whenever a task assignment requires work to be accomplished at a temporary alternate worksite. No travel or subsistence shall be charged for work performed within a fifty-mile radius of the contractor’s office. The contractor shall not be paid for travel or subsistence for contractor personnel who reside in the metropolitan area in which the tasks are being performed. Travel performed for personal convenience, in conjunction with personal recreation, or daily travel to and from work at the contractor’s facility will not be reimbursed. | |
| (1) For travel costs other than described in paragraph (c) above, the contractor shall be paid on the basis of actual amount paid to the extent that such travel is necessary for the performance of services under the contract and is authorized by the COR in writing. | |
| (2) When transportation by privately owned conveyance is authorized, the contractor shall be paid on a mileage basis not to exceed the applicable Government transportation rate as contained in the JTR or SR. Authorization for the use of privately owned conveyance shall be indicated in the basic contract. Distances traveled between points shall be shown on invoices as listed in standard highway mileage guides. Reimbursement will not exceed the mileage shown in the standard highway mileage guides. | |
| (3) The contractor agrees, in the performance of necessary travel, to use the lowest cost mode commensurate with the requirements of the mission as set forth in the basic. When it is necessary to use air or rail travel, the contractor agrees to use coach, tourist class, or similar accommodations to the extent consistent with the successful and economical accomplishment of the mission for which the travel is being performed. | |
| (4) The contractor’s invoices shall include receipts or other evidence substantiating actual costs incurred for authorized travel. In no event will such payments exceed the rates of common carriers. | |
| (d) Vehicle and/or Truck Rentals. The contractor shall be reimbursed for actual rental/lease of special vehicles and/or trucks (i.e., of a type not normally used by the contractor in the conduct of its business) only if authorized in the basic contract or upon approval by the COR. Reimbursement of such rental shall be made based on actual amounts paid by the contractor. Use of rental/lease costs of vehicles and/or trucks that are of a type normally used by the contractor in the conduct of its business are not subject to reimbursement. | |
| (e) Car Rental. The contractor shall be reimbursed for car rental, exclusive of mileage charges, as authorized in the basic contract or upon approval by the COR, when the services are required to be performed beyond the normal commuting distance from the contractor’s facilities. Car rental for a team on TDY at one site will be allowed for a minimum of four (4) persons per car, provided that such number or greater comprise the TDY team. | |
| (f) Per Diem. The contractor shall not be paid for per diem for contractor personnel who reside in the metropolitan areas in which the tasks are being performed. Per Diem shall not be paid on services performed within a fifty-mile radius of the contractor’s home office or the contractor’s local office. Per Diem is authorized for contractor personnel beyond a fifty-mile radius of the contractor’s home or local offices whenever a task assigned requires work to be done at a temporary alternate worksite. Per Diem shall be paid to the contractor only to the extent that overnight stay is necessary and authorized under this contract. The authorized per diem rate shall be the same as the prevailing per diem in the worksite locality. These rates will be based on rates contained in the JTR or SR. The applicable rate is authorized at a flat seventy-five (75%) percent on the day of departure from contractor’s home or local office, and on the day of return. Reimbursement to the contractor for per diem shall be limited to actual payments to per diem defined herein. The contractor shall provide actual payments of per diem defined herein. The contractor shall provide supporting documentation for per diem expenses as evidence of actual payment. | |
| (g) Shipboard Stays. Whenever work assignments require temporary duty aboard a Government ship, the contractor will be reimbursed in accordance with the Joint Travel Regulations, Paragraph C4558, Per Diem For Travel By Ship. | |
| (h) Special Material. “Special material” includes only the costs of material, supplies, or services which is peculiar to the ordered data and which is not suitable for use in the course of the contractor’s normal business. It shall be furnished pursuant to specific authorization approved by the COR. The contractor will be required to support all material costs claimed by its costs less any applicable discounts. “Special materials” include, but are not limited to, graphic reproduction expenses, or technical illustrative or design requirements needing special processing. |
H.6 ALLOTMENT OF FUNDS - INCREMENTALLY FUNDED COST-REIMBURSEMENT CONTRACT OTHER THAN COST-SHARING CONTRACT
For the purposes of paragraph (b) of the “Limitation of Funds” Clause of this contract-
| (a) The amount available for payment and allotted to this incrementally funded contract is $[If contract, enter dollar amount; if solicitation, state “to be determined”]; |
| (b) The items covered by such amount are Item(s) [Insert CLINs]; and |
| (c) The period of performance for which it is estimated the allotted amount will cover is [Insert the period of performance (calendar date]. |
H.7 AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
| (a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the contractor’s facilities or in any other manner communicates with contractor personnel during the performance of this contract shall constitute a change under the “Changes” Clause of this contract. |
| (b) The contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract. |
| (c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer’s. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer is: Marnita Harris, ACC-Orlando 12211 Science Drive, Orlando Florida 32826-3224, 407-208-3294, email: marnita.r.harris.civ@mail.mil. |
Section I - Contract Clauses
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| OCT 2015 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights |
| APR 2014 |
| 52.204-2 |
| Security Requirements |
| AUG 1996 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2016 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| JUL 2013 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.209-11 |
| Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under and Federal Law |
| FEB 2016 |
| 52.210-1 |
| Market Research |
| APR 2011 |
| 52.211-5 |
| Material Requirements |
| AUG 2000 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-11 |
| Price Reduction for Defective Certified Cost or Pricing Data--Modifications |
| AUG 2011 |
| 52.215-12 |
| Subcontractor Certified Cost or Pricing Data |
| OCT 2010 |
| 52.215-13 |
| Subcontractor Certified Cost or Pricing Data--Modifications |
| OCT 2010 |
| 52.215-14 |
| Integrity of Unit Prices |
| OCT 2010 |
| 52.215-16 |
| Facilities Capital Cost of Money |
| JUN 2003 |
| 52.215-20 |
| Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data |
| OCT 2010 |
| 52.215-22 |
| Limitations on Pass-Through Charges--Identification of Subcontract Effort |
| OCT 2009 |
| 52.215-23 |
| Limitations on Pass-Through Charges |
| OCT 2009 |
| 52.216-8 |
| Fixed Fee |
| JUN 2011 |
| 52.216-24 |
| Limitation Of Government Liability |
| APR 1984 |
| 52.216-25 |
| Contract Definitization |
| OCT 2010 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| NOV 2016 |
| 52.219-9 |
| Small Business Subcontracting Plan |
| NOV 2016 |
| 52.219-9 Alt II |
| Small Business Subcontracting Plan (NOV 2016) Alternate II |
| NOV 2016 |
| 52.219-16 |
| Liquidated Damages-Subcontracting Plan |
| JAN 1999 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-19 |
| Child Labor -- Cooperation with Authorities and Remedies |
| OCT 2016 |
| 52.222-20 |
| Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 |
| MAY 2014 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| SEP 2016 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| OCT 2015 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-37 |
| Employment Reports on Veterans |
| FEB 2016 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| MAR 2015 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2011 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-10 |
| Waste Reduction Program |
| MAY 2011 |
| 52.223-11 |
| Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons. |
| JUN 2016 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-1 |
| Buy American--Supplies |
| MAY 2014 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.225-25 |
| Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications. |
| OCT 2015 |
| 52.226-1 |
| Utilization Of Indian Organizations And Indian-Owned Economic Enterprises |
| JUN 2000 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.228-7 |
| Insurance--Liability To Third Persons |
| MAR 1996 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.229-10 |
| State of New Mexico Gross Receipts and Compensating Tax |
| APR 2003 |
| 52.230-2 |
| Cost Accounting Standards |
| OCT 2015 |
| 52.230-3 |
| Disclosure And Consistency Of Cost Accounting Practices |
| OCT 2015 |
| 52.230-6 |
| Administration of Cost Accounting Standards |
| JUN 2010 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-11 |
| Extras |
| APR 1984 |
| 52.232-16 |
| Progress Payments |
| APR 2012 |
| 52.232-16 Alt III |
| Progress Payments (Apr 2012) - Alternate III |
| APR 2003 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-18 |
| Availability Of Funds |
| APR 1984 |
| 52.232-23 Alt I |
| Assignment of Claims (May 2014) - Alternate I |
| APR 1984 |
| 52.232-25 |
| Prompt Payment |
| JUL 2013 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-2 |
| Service Of Protest |
| SEP 2006 |
| 52.233-3 Alt I |
| Protest After Award (Aug 1996) - Alternate I |
| JUN 1985 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.242-1 |
| Notice of Intent to Disallow Costs |
| APR 1984 |
| 52.242-3 |
| Penalties for Unallowable Costs |
| MAY 2014 |
| 52.242-4 |
| Certification of Final Indirect Costs |
| JAN 1997 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.243-2 |
| Changes--Cost-Reimbursement |
| AUG 1987 |
| 52.243-2 Alt V |
| Changes--Cost-Reimbursement (Aug 1987) - Alternate V |
| APR 1984 |
| 52.243-6 |
| Change Order Accounting |
| APR 1984 |
| 52.243-7 |
| Notification Of Changes |
| APR 1984 |
| 52.244-5 |
| Competition In Subcontracting |
| DEC 1996 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| NOV 2016 |
| 52.246-23 |
| Limitation Of Liability |
| FEB 1997 |
| 52.246-24 |
| Limitation Of Liability--High-Value Items |
| FEB 1997 |
| 52.248-1 |
| Value Engineering |
| OCT 2010 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-6 |
| Termination (Cost Reimbursement) |
| MAY 2004 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 52.249-14 |
| Excusable Delays |
| APR 1984 |
| 52.252-6 |
| Authorized Deviations In Clauses |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7004 |
| Display of Hotline Posters |
| OCT 2016 |
| 252.203-7996 (Dev) |
| Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements - Representation (Deviation 2016-O0003) |
| OCT 2015 |
| 252.203-7997 (Dev) |
| Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements (Deviation 2016-O0003) |
| OCT 2015 |
| 252.204-7000 |
| Disclosure Of Information |
| OCT 2016 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 Alt A |
| System for Award Management Alternate A |
| FEB 2014 |
| 252.204-7005 |
| Oral Attestation of Security Responsibilities |
| NOV 2001 |
| 252.204-7008 |
| Compliance With Safeguarding Covered Defense Information Controls |
| OCT 2016 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| OCT 2015 |
| 252.211-7003 |
| Item Unique Identification and Valuation |
| MAR 2016 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.211-7008 |
| Use of Government-Assigned Serial Numbers |
| SEP 2010 |
| 252.215-7002 |
| Cost Estimating System Requirements |
| DEC 2012 |
| 252.219-7003 (Dev) |
| Small Business Subcontracting Plan (DOD Contracts)--Basic (Deviation 2016-O0009) |
| AUG 2016 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| AUG 2016 |
| 252.225-7003 |
| Report of Intended Performance Outside the United States and Canada--Submission with Offer |
| OCT 2015 |
| 252.225-7006 |
| Acquisition of the AmericanFlag |
| AUG 2015 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| AUG 2016 |
| 252.225-7031 |
| Secondary Arab Boycott Of Israel |
| JUN 2005 |
| 252.226-7001 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| SEP 2004 |
| 252.227-7013 |
| Rights in Technical Data--Noncommercial Items |
| FEB 2014 |
| 252.227-7014 |
| Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation |
| FEB 2014 |
| 252.227-7016 |
| Rights in Bid or Proposal Information |
| JAN 2011 |
| 252.227-7017 |
| Identification and Assertion of Use, Release, or Disclosure Restrictions |
| JAN 2011 |
| 252.227-7019 |
| Validation of Asserted Restrictions--Computer Software |
| SEP 2016 |
| 252.227-7027 |
| Deferred Ordering Of Technical Data Or Computer Software |
| APR 1988 |
| 252.227-7037 |
| Validation of Restrictive Markings on Technical Data |
| SEP 2016 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.239-7001 |
| Information Assurance Contractor Training and Certification |
| JAN 2008 |
| 252.239-7010 |
| Cloud Computing Services |
| OCT 2016 |
| 252.242-7004 |
| Material Management And Accounting System |
| MAY 2011 |
| 252.242-7005 |
| Contractor Business Systems |
| FEB 2012 |
| 252.246-7007 |
| Contractor Counterfeit Electronic Part Detection and Avoidance System |
| AUG 2016 |
CLAUSES INCORPORATED BY FULL TEXT
52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
(a) The Contractor shall make the following notifications in writing:
(1) When the Contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records, the Contractor shall notify the Administrative Contracting Officer (ACO) within 30 days.
(2) The Contractor shall also notify the ACO within 30 days whenever changes to asset valuations or any other cost changes have occurred or are certain to occur as a result of a change in ownership.
(b) The Contractor shall--
(1) Maintain current, accurate, and complete inventory records of assets and their costs;
(2) Provide the ACO or designated representative ready access to the records upon request;
(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of the Contractor's ownership changes; and
(4) Retain and continue to maintain depreciation and amortization schedules based on the asset records maintained before each Contractor ownership change.
The Contractor shall include the substance of this clause in all subcontracts under this contract that meet the applicability requirement of FAR 15.408(k).
52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013)
(a) Invoicing.
(1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.
(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains Alternate I to the clause at 52.232-25.
(3) The designated payment office will make interim payments for contract financing on the “30th” day after the designated billing office receives a proper payment request.
In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(b) Reimbursing costs. (1) For the purpose of reimbursing allowable costs (except as provided in subparagraph (b)(2) of the clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term "costs" includes only--
(i) Those recorded costs that, at the time of the request for reimbursement, the Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;
(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for--
(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made--
(1) In accordance with the terms and conditions of a subcontract or invoice; and
(2) Ordinarily within 30 days of the submission of the Contractor's payment request to the Government;
(B) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;
(C) Direct labor;
(D) Direct travel;
(E) Other direct in-house costs; and
(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and
(iii) The amount of financing payments that have been paid by cash, check, or other forms of payment to subcontractors.
(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless--
(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's indirect costs for payment purposes).
(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) of this clause, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) of this clause.
(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.
(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.
(d) Final indirect cost rates. (1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with Subpart 42.7 of the Federal Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.
(2)(i) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. Reasonable extensions, for exceptional circumstances only, may be requested in writing by the Contractor and granted in writing by the Contracting Officer. The Contractor shall support its proposal with adequate supporting data.
(ii) The proposed rates shall be based on the Contractor's actual cost experience for that period. The appropriate Government representative and the Contractor shall establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.
(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official:
(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.
(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).
(C) Overhead expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.
(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) and expense reallocation to final indirect cost pools.
(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.
(F) Facilities capital cost of money factors computation.
(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost element.
(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.
(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.
(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).
(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.
(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.
(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.
(N) Certificate of final indirect costs (see 52.242-4, Certification of Final Indirect Costs).
(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).
(iv) The following supplemental information is not required to determine if a proposal is adequate, but may be required during the audit process:
(A) Comparative analysis of indirect expense pools detailed by account to prior fiscal year and budgetary data.
(B) General organizational information and limitation on allowability of compensation for certain contractor personnel. See 31.205-6(p). Additional salary reference information is available at http://www.whitehouse.gov/omb/procurement_index_exec_comp/.
(C) Identification of prime contracts under which the contractor performs as a subcontractor.
(D) Description of accounting system (excludes contractors required to submit a CAS Disclosure Statement or contractors where the description of the accounting system has not changed from the previous year's submission).
(E) Procedures for identifying and excluding unallowable costs from the costs claimed and billed (excludes contractors where the procedures have not changed from the previous year's submission).
(F) Certified financial statements and other financial data (e.g., trial balance, compilation, review, etc.).
(G) Management letter from outside CPAs concerning any internal control weaknesses.
(H) Actions that have been and/or will be implemented to correct the weaknesses described in the management letter from subparagraph G) of this section.
(I) List of all internal audit reports issued since the last disclosure of internal audit reports to the Government.
(J) Annual internal audit plan of scheduled audits to be performed in the fiscal year when the final indirect cost rate submission is made.
(K) Federal and State income tax returns.
(L) Securities and Exchange Commission 10-K annual report.
(M) Minutes from board of directors meetings.
(N) Listing of delay claims and termination claims submitted which contain costs relating to the subject fiscal year.
(O) Contract briefings, which generally include a synopsis of all pertinent contract provisions, such as: Contract type, contract amount, product or service(s) to be provided, contract performance period, rate ceilings, advance approval requirements, pre-contract cost allowability limitations, and billing limitations.
(v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed, as required in paragraph (d)(2)(iii)(I) of this section, within 60 days after settlement of final indirect cost rates.
(3) The Contractor and the appropriate Government representative shall execute a written understanding setting forth the final indirect cost rates.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .