NETCM PGS CDRLs

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFAE-STRI-ITTS

6. REQUIRING OFFICE

Paragraph 3.2

5. CONTRACT REFERENCE

DI-MGMT-80227

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

Block 2: Contractors Progress, Status and Management Report

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 12: SHALL BE DUE NO LATER THAN 30 CALENDAR DAYS AFTER

CONTRACT AWARD.

3. BLOCK 13: SHALL BE DUE NO LATER THAN THE 7TH CALENDAR DAY OF

EVERY MONTH AND CONTINUE EVERY MONTH THROUGHOUT THE LIFE OF THE

CONTRACT. REVISIONS AS REQUIRED THROUGHOUT THE CONTRACT PERIOD

OF PERFORMANCE.

4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL

usarmy.orlando.peo-stri.list.pm-itts-netcm-cdrls@mail.mil AND TO THE

CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE

CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD

(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).

SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE

ADOBE ACROBAT READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH

MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN ELECTRONIC

FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE OF THE

ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT THE

CONTRACT SPECIALIST FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE

FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT

ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION OF THESE FILE

TYPES, CONTACT THE CONTRACT SPECIALIST FOR SUBMISSION INSTRUCTIONS.

5. GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

6. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. FORMAT: THIS REPORT SHALL BE TYPEWRITTEN ON STANDARD SIZE (e.g.

8-1/2" X 11"). ALL ATTACHMENTS SHALL BE IDENTIFIED AND REFERENCED

IN THE TEXT OF THE REPORT. THE REPORT SHALL BE PREPARED IN THE

CONTRACTOR'S FORMAT AND SHALL BE LEGIBLE AND SUITABLE FOR REPRODUCTION.

8. CONTENT: THE REPORT SHALL INCLUDE:

A. A FRONT COVER SHEET WHICH INCLUDES THE CONTRACTOR'S NAME

AND ADDRESS, THE CONTRACT NUMBER, THE NOMENCLATURE OF THE SYSTEM,

THE DATE OF THE REPORT, THE PERIOD COVERED BY THE REPORT, THE

TITLE OF THE REPORT, EITHER THE SERIAL NUMBER OF THE REPORT OR

THE CDRL SEQUENCE NUMBER, THE SECURITY CLASSIFICATION, AND THE

NAME OF THE ISSUING GOVERNMENT ACTIVITY;

B. DESCRIPTION OF THE PROGRESS MADE AGAINST MILESTONES DURING

THE REPORTING PERIOD;

C. RESULTS, POSITIVE OR NEGATIVE, OBTAINED RELATED TO

PREVIOUSLY-IDENTIFIED PROBLEM AREAS, WITH CONCLUSIONS AND RECOMMENDATIONS;

D. ANY SIGNIFICANT CHANGES TO THE CONTRACTOR'S ORGANIZATIONS

OR METHOD OF OPERATION, TO THE PROJECT MANAGEMENT STRUCTURE;

E. PROBLEM AREAS AFFECTING TECHNICAL OR SCHEDULING ELEMENTS,

WITH BACKGROUND AND ANY RECOMMENDATIONS BEYOND THE SCOPE OF THE CONTRACT;

F. ANY TRIPS AND SIGNIFICANT RESULTS;

G. RECORD OF ALL SIGNIFICANT TELEPHONE CALLS AND ANY

16. REMARKS 1SFAE-STRI-ITTS

010 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 2 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

16. REMARKS (Continued)

COMMITMENTS MADE BY TELEPHONE;

H. SUMMARY OF ENGINEERING CHANGE PROPOSAL (ECP) STATUS, INCLUDING IDENTIFICATION OF PROPOSED ECPs, APPROVED ECPs, AND IMPLEMENTED ECPs;

I. PLANS FOR ACTIVITIES DURING THE FOLLOWING REPORTING PERIOD;

J. NAME AND TELEPHONE NUMBER OF PREPARER OF THE REPORT;

K. APPENDIXES FOR ANY NECESSARY TABLES, REFERENCES, PHOTOGRAPHS, ILLUSTRATIONS, AND CHARTS.

9.DO NOT INCLUDE ANY INVOICING OR COSTING INFORMATION AS THERE ARE SEPARATE CDRLs FOR THIS REPORTING.

10. SMALL BUSINESS PARTICIPATION REPORTING: SMALL BUSINESS PARTICIPATION DATA SHALL BE SUBMITTED ON A SEMI-ANNUAL BASIS IN ACCORDANCE WITH THE SMALL BUSINESS PARTICIPATION FORM SET FORTH AS ATTACHMENT 5 (SMALL

BUSINESS PARTICIPATION FORM) IN SECTION J OF THE CONTRACT.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Page 2 of 2 PagesDD FORM 1423-1, FEB 2001

Paragraph 3.2.1, 3.2.2

5. CONTRACT REFERENCE

DI-MGMT-81861

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Format 1, 5 and 6Integrated Program Management Report (IPMR)

2. TITLE OF THE DATA ITEM

A002

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

ONLY FORMAT 1, 5 and 6 IS REQUIRED AS PART OF THIS DID. WHILE EVM

IS NOT A REQUIREMENT OF THIS CONTRACT, THIS CDRL WILL BE

UTILIZED BY THE CONTRACTOR AND GOVERNMENT TEAM TO MONITOR

PROGRESS OF COST/ SCHEDULE/PERFORMANCE AND IMPLEMENT CORRECTIVE

ACTIONS FOR RISK REDUCTION AND SUCCESS OF PROJECT.

1. BLOCK 4:

FORMAT 1 SHALL BE IN XLMS FORMAT IN ADDITION TO GRAPHICAL

REPRESENTATION TO PMB BASELINE CREATED.

REPORTING LEVELS: INTEGRATED MASTER SCHEDULE (IMS) FORMAT 6

REPORTING SHALL INCLUDE A CONTRACTOR WORK BREAKDOWN SCHEDULE

(CWBS) CONSISTENT WITH FORMAT 1. THE CWBS SHALL BE AT A MINIMUM OF LEVEL 3.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL

TECHNOLOGY EFFECTIVE 1 JUNE 2015. OTHER REQUEST FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

3. BLOCK 12: INITIAL SUBMISSION IS DUE NO LATER THAN 55 CALENDAR

DAYS AFTER CONTRACT AWARD, AT TIME OF THE START OF WORK MEETING.

4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE THE 7TH CALENDAR

DAY OF EACH MONTH AND CONTINUE MONTHLY THROUGH CONTRACT PERIOD

OF PERFORMANCE.

5. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAILTO

usarmy.orlando.peo-stri.list.pm-itts-netcm-cdrls@mail.mil AND TO THE

CONTRACT SPECIALIST.

THE EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL

DATA ITEM NUMBER, AND REPORTING PERIOD (E.G., W900KK-15-D-0001/004,

CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS FOR FORMAT 1 SHALL

BE IN XLMS FORMAT CONSISTENT PRACTICES UTILIZED FOR EVM

REPORTING. FORMAT 5 AND 6 WITH SHALL BE IN APPLICATION FORMAT

UTILIZED AND PDF FORMAT AS WELL.

FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10

MB OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS

GREATER THAN 10 MB, CONTACT THE CONTRACT SPECIALIST FOR

SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF COMPRESSED OR ZIP

FILES AND EXECUTABLE FILES ARE NOT ACCEPTED BY THE PEO STRI

FIREWALL. FOR SUBMISSION OF GREATER THAN 10MB, CONTACT THE

CONTRACT SPECIALIST FOR SUBMISSION INSTRUCTIONS.

6. GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

7. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1SFAE-STRI-ITTS

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

Paragraph 3.2.2

5. CONTRACT REFERENCE

DI-MGMT-81651

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Contract Invoicing and Payment Report

2. TITLE OF THE DATA ITEM

A003

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

see block 16

11. AS OF DATE

see block 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 12: SHALL BE DUE NO LATER THAN 30 CALENDAR DAYS AFTER

CONTRACT AWARD.

3. BLOCK 13: SHALL BE DUE NO LATER THAN THE 7TH CALENDAR DAY OF

EACH MONTH AND CONTINUE MONTHLY THROUGHOUT THE CONTRACT PERIOD

OF PERFORMANCE.

4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL TO

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND TO

THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE

THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD

(E.G., W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015).

SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE

ADOBE ACROBAT READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH

MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN ELECTRONIC

FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE OF THE

ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT THE COR

FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF COMPRESSED OR

ZIP FILES AND EXECUTABLE FILES ARE NOT ACCEPTED BY THE PEO STRI

FIREWALL. FOR SUBMISSION OF THESE FILE TYPES, CONTACT THE COR

FOR SUBMISSION INSTRUCTIONS.

5. GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

6. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SFAE-STRI-ITTS-IMO

Paragraph 3.2.2

5. CONTRACT REFERENCE

DI-MGMT-81468

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Contract Funds Status Report (CFSR)

2. TITLE OF THE DATA ITEM

A004

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

see block 16

11. AS OF DATE

see block 16

12.DATE OF FIRST

SUBMISSION

BI-MO

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER AWARD OF THE CONTRACT.

3. BLOCK 13: SHALL CONTINUE EVERY TWO MONTHS THROUGH LIFE OF THE CONTRACT.

4. BLOCK 14: REPRODUCIBLES SHALL BE DELIVERED VIA ELECTRONIC MAIL

IN MICROSOFT OFFICE 2013 OR PDF FORMAT COMPATIBLE. GRAPHICS

PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE

COMPATIBLE WITH MICROSOFT OFFICE 2013. REPRODUCIBLES SHALL BE

E-MAILED TO:

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND

CONTRACT SPECIALIST.

5. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

6. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT IS ACCEPTABLE; THOUGH ALL ELEMENTS OF THE

DID CONTENT SHALL BE ADDRESSED. IN ADDITION, PROVIDE A

GRAPHICAL REPRESENTATION OF THIS CDRL.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.2.3

5. CONTRACT REFERENCE

DI-MGMT-81808

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Contractors Risk Management Plan

2. TITLE OF THE DATA ITEM

A005

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

see block 16

11. AS OF DATE

see block 16

12.DATE OF FIRST

SUBMISSION

BI-MO

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 12: INITIAL SUBMITTAL SHALL BE DUE 10 WORK DAYS BEFORE

THE START OF WORK MEETING.

3. BLOCK 13: EVERY TWO MONTHS THROUGHOUT THE LIFE OF THE CONTRACT

TO ADDRESS CURRENT PROJECT EFFORTS, UPCOMING MILESTONES, ETC

4. BLOCK 14: The contractor shall submit the data, in the form of attachments, via email to

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL. AND

CONTRACT SPECIALIST.

The email subject line shall include the contract number, CDRL data item number, and reporting period (e.g., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 May 2013). Submissions shall be in Microsoft Office 2013 or PDF compatible format. Graphic packages used to create figures, tables, and charts shall be compatible with Microsoft Word 2013 OR PDF COMPATIBLE FORMAT. For data submission with an electronic file size greater than 10 MB or if the combined size of the attachments to the email is greater than 10 MB, contact the COR for submission instructions. Email in the form of compressed or zip files and executable files are not accepted by the PEO STRI firewall. For submission of these file types, contact the COR for submission instructions.

5. THE GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION.

6. THE CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.4

5. CONTRACT REFERENCE

DI-MISC-80711A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Cybersecurity ArtifactsScientific and Technical Reports

2. TITLE OF THE DATA ITEM

A006

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MISCA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

see block 16

11. AS OF DATE

see block 16

12.DATE OF FIRST

SUBMISSION

2TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 12: SHALL BE DUE NO LATER THAN 10 WORK DAYS PRIOR TO THE

INTEGRATION READY REVIEW (IRR).

3. BLOCK 13: FINAL SUBMISSION SHALL BE DUE NO LATER THAN 10 WORK

DAYS PRIOR TO THE TEST READY REVIEW (TRR).

4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL TO

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL. AND

THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE

THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD

(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).

SUBMISSIONS REQUIREMENTS TO BE DETERMINED BASED ON WSMR RMF

REQUIREMENTS. SPECIFIC SUBMITTAL REQUIREMENTS AND SAMPLE RMF

CONTRACTOR SUBMITTAL DOCUMENTATION WILL BE DETERMINED AND

FINALIZED PRIOR TO THE CRITICAL DESIGN REVIEW (CDR).

5. GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

6. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.5

5. CONTRACT REFERENCE

DI-ADMN-81306

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Program Protection Implementation Plan (PPIP)

2. TITLE OF THE DATA ITEM

A007

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMNA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

see block 16

11. AS OF DATE

see block 16

12.DATE OF FIRST

SUBMISSION

Block 16

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED,

TITLE 50, U.S.C., APP. 240 ET SEQ.

2. BLOCK 12: INITIAL SUBMITTAL SHALL BE DUE 15 WORK DAYS BEFORE

PRELIMINARY DESIGN REVIEW (PDR).

3. BLOCK 13: SECOND SUBMITTAL DUE 15 DAYS PRIOR TO CRITICAL DESIGN

REVIEW (CDR). FINAL SUBMITTAL DUE 15 DAYS PRIOR TO INTEGRATION

READY REVIEW (IRR).

4. BLOCK 14: The contractor shall submit the data, in the form of attachments, via email to

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND

THE CONTRACT SPECIALIST.

The email subject line shall include the contract number, CDRL data item number, and reporting period (e.g., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 May 2013). Submissions shall be in Microsoft Office 2013 OR COMPATIBLE PDF FORMAT. Graphic packages used to create figures, tables, and charts shall be compatible with Microsoft Word 2013. For data submission with an electronic file size greater than 10 MB or if the combined size of the attachments to the email is greater than 10 MB, contact the COR for submission instructions. Email in the form of compressed or zip files and executable files are not accepted by the PEO STRI firewall. For submission of these file types, contact the COR for submission instructions.

5. THE GOVERNMENT WILL HAVE 20 WORK DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION.

6. THE CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.6

5. CONTRACT REFERENCE

DI-SESS-81785

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Systems Engineering Management Plan (SEMP)

2. TITLE OF THE DATA ITEM

A008

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

2TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. IMMEDIATELY FOLLOWING CONTRACT AWARD, THE CONTRACTOR WILL BE

PROVIDED WITH A COPY OF THE GOVERNMENT'S SYSTEM ENGINEERING PLAN

(SEP) TO COORDINATE THE CONTENT OF THE SEMP. THE SEMP IS

INTENDED TO BE A LIVING DOCUMENT WITH UPDATES THROUGHOUT LIFE

CYLE OF PROJECT.

3. BLOCK 12: 1ST SUBMISSION SHALL BE DUE NO LATER THAN 15 WORK

DAYS PRIOR TO THE SYSTEMS REQUIREMENTS REVIEW (SRR).

4. BLOCK 13:

SECOND AND FINAL SUBMISSION SHALL BE DUE NO LATER THAN 15 WORK

DAYS PRIOR TO THE PRELIMINARY DESIGN REVIEW (PDR).

5. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL TO

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND TO

THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE

THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD

(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).

SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 OR SEARCHABLE

ADOBE ACROBAT READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH

MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN ELECTRONIC

FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE OF THE

ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT THE COR

FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF COMPRESSED OR

ZIP FILES AND EXECUTABLE FILES ARE NOT ACCEPTED BY THE PEO STRI

FIREWALL. FOR SUBMISSION OF THESE FILE TYPES, CONTACT THE COR

FOR SUBMISSION INSTRUCTIONS.

6. GOVERNMENT WILL HAVE 20 WORK DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

7. CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

8. REVISIONS TO THE DOCUMENT SHALL CLEARLY INDICATE CHANGES FROM

PREVIOUS VERSIONS THROUGH VERSION/REVISION NUMBER/LETTER,

HIGHLIGHTS, CHANGE BARS, ETC.

9. CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.6.2.1, 3.6.2.2, 3.6.2.3

5. CONTRACT REFERENCE

DI-SESS-81497A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A009

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

see block 16

11. AS OF DATE

see block 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

Block 2: Reliability and Maintainability Predictions Report

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2.BLOCK 6: THIS CDRL CONTAINS SUMBITTAL DOCUMENTATION FOR THE

FOLLOWING ANALYSIS REQUIREMENTS:

- SYSTEM RELIABILITY MODEL (SRM)

- FAILURE MODES, EFFECTS & CRITICALITY ANALYSIS (FMECA)

- RELIABILITY ASSESSMENT

THE ABOVE ANALYSIS REQUIREMENTS ARE TO BE PERFORMED FOR EACH

MAJOR SYSTEM COMPRISING THE PGS.

3. BLOCK 12 AND 13: SHALL BE DUE NO LATER THAN 10 WORK DAYS PRIOR

TO THE START OF EACH SCHEDULED MAJOR SYSTEM SYSTEM'S ENGINERING

TECHNICAL REVIEW DURING THE PRELIMINARY AND DETAILED DESIGN PHASE.

4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL TO

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND TO

THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE

THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD

(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).

SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE

ADOBE ACROBAT READER (*.PDF) FORMATS. DRAWINGS/SCHEMATICS SHALL

BE IN THEIR NATIVE FORMAT AND SEARCHABLE ADOBE ACROBAT READER

(*.PDF) FORMAT. GRAPHIC PACKAGES USED TO CREATE FIGURES, TABLES,

AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013. FOR

DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB

OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS

GREATER THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.

EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE

FILES ARE NOT ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION

OF THESE FILE TYPES, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.

5. GOVERNMENT WILL HAVE 15 WORK DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

6. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.6.2.4

5. CONTRACT REFERENCE

DI-SESS-81315B

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A010

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

Block 16

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

Block 2: FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT (FRACAR)

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 4: SECTION - USE/RELATIONSHIP, CHANGE TO READ AS FOLLOWS:

PROVIDES IMMEDIATE REPORTING OF FAILURE AND SUBSEQUENT DETAILS

FAILURE ANALYSIS RESULTS AND CORRECTIVE ACTION RECOMMENDATION.

3. BLOCK 12: FIRST SUBMISSION TO OCCUR DURING PRELIMINARY

DESIGN/MODELING PHASE.

4. BLOCK 13: SUBSEQUENT SUBMISSIONS TO OCCUR DURING THE DETAILED

DESIGN PHASES, MANUFACTURING PHASES, ASSEMBLY AND TESTING

PHASES. FRACAS REPORTS ARE INTENDED TO BE A METHOD OF

RELIABILITY QUALITY CONTROL AND THUS NEED TO BE UPDATED ON A

REGULAR BASIS UPON OCCURRENCES OF FAILURES.

5. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL TO

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND

CONTRACT SPECIALIST.

THE EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL

DATA ITEM NUMBER, AND REPORTING PERIOD (E.G., W900KK-12-D-0003,

CLIN 0002, CDRL A001, 1 MAY 2013). SUBMISSIONS SHALL BE IN

MICROSOFT OFFICE 2013 OR PDF COMPATIBLE FORMAT. GRAPHIC PACKAGES

USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE

WITH MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN

ELECTRONIC FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE

OF THE ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT

THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF

COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT ACCEPTED

BY THE PEO STRI FIREWALL. FOR SUBMISSION OF THESE FILE TYPES,

CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.

6. GOVERNMENT WILL HAVE 5 WORK DAYS FOR REVIEW ISSUED FRACAS REPORTS.

7. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

8. REVISIONS TO THE DOCUMENT SHALL CLEARLY INDICATE CHANGES FROM

PREVIOUS VERSIONS THROUGH VERSION/REVISION NUMBER/LETTER,

HIGHLIGHTS, CHANGE BARS, ETC.

8. CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.6.10

5. CONTRACT REFERENCE

DI-IPSC-81432A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

System/Subsystem Design Description (SSDD)

2. TITLE OF THE DATA ITEM

A011

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER IPSCA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 22 JANUARY 2015. OTHER REQUESTS FOR THIS DOCUMENT

SHALL BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL TO

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND

CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE

CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD

(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).

SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 AND/OR SEARCHABLE

ADOBE ACROBAT READER (*.PDF) FORMATS. DRAWINGS/SCHEMATICS SHALL

BE IN THEIR NATIVE FORMAT AND SEARCHABLE ADOBE ACROBAT READER

(*.PDF) FORMAT. GRAPHIC PACKAGES USED TO CREATE FIGURES, TABLES,

AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013. FOR

DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB

OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS

GREATER THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.

EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE

FILES ARE NOT ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION

OF THESE FILE TYPES, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.

3. BLOCK 10, 12, 13:

FOR MAJOR DESIGN REVIEWS SRR/PDR/CDR/IRR/TRR (3.6.9.1, 3.6.9.2,

3.6.9.3, 3.7.2, 3.7.3): LEVEL OF DETAIL SHALL BE ABLE TO REFLECT

INFORMATION ADEQUATE FOR REVIEW.

SHALL BE DUE NO LATER THAN 15 WORK DAYS PRIOR TO THE START OF

EACH SCHEDULED REVIEW.

GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

CONTRACTOR SHALL HAVE 15 WORK DAYS SUBSEQUENT TO DESIGN REVIEW

TO INCORPORATE GOVERNMENT COMMENTS.

FINAL SUBMITTAL:

SHALL BE DUE 45 DAYS PRIOR TO SYSTEM VERIFICAION REVIEW (SVR):

GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT

COMMENTS AND DELIVER FINAL

PACKAGE DURING THE SVR.

16. REMARKS 1SFAE-STIR-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.6.11

5. CONTRACT REFERENCE

DI-SAFT-80102C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

SAFETY ASSESSMENT REPORT

2. TITLE OF THE DATA ITEM

A012

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SAFTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

11. AS OF DATE

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

2TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 12: FIRST SUBMISSION SHALL BE DUE NO LATER THAN 20 WORK

DAYS PRIOR TO CRITICAL DESIGN REVIEW (CDR).

3. BLOCK 13: SECOND SUBMISSION SHALL BE DUE NO LATER THAN 20 WORK

DAYS PRIOR TO THE INTEGRATION READINESS REVIEW (IRR).

4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL TO

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND

THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE

THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD

(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).

SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 OR SEARCHABLE

ADOBE ACROBAT READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH

MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN ELECTRONIC

FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE OF THE

ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT THE COR

FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF COMPRESSED OR

ZIP FILES AND EXECUTABLE FILES ARE NOT ACCEPTED BY THE PEO STRI

FIREWALL. FOR SUBMISSION OF THESE FILE TYPES, CONTACT THE

CONTRACTING SPECIALIST FOR SUBMISSION INSTRUCTIONS.

5. GOVERNMENT WILL HAVE 20 WORK DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

6. CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT IS ACCEPTABLE.

8. REVISIONS TO THE DOCUMENT SHALL CLEARLY INDICATE CHANGES FROM

PREVIOUS VERSIONS THROUGH VERSION/REVISION NUMBER/LETTER,

HIGHLIGHTS, CHANGE BARS, ETC.

9. CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.6.12

5. CONTRACT REFERENCE

DI-MISC-80711A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Anti-Terrorism (AT) Level 1 Awareness TraiScientific and Technical Reports

2. TITLE OF THE DATA ITEM

A013

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MISCA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 12: FIRST SUBMISSION OF CERTIFICATES OF COMPLETION IS DUE

30 DAYS AFTER CONTRACT AWARD.

3. BLOCK 13: ADDITIONAL SUBMISSIONS ARE REQUIRED AS NEW EMPLOYEES

ARE ADDED TO SUPPORT THE CONTRACT. SUBSEQUENT TRAINING AND

SUBMISSIONS ARE DUE NLT 30 DAYS FOLLOWING THE EMPLOYEE'S DATE OF HIRE.

4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL TO

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND

THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE

THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD

(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).

CERTIFICATE SUBMISSIONS SHALL BE IN SEARCHABLE ADOBE ACROBAT

READER (*.PDF) FORMATS.

5. GOVERNMENT WILL HAVE 5 WORK DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

6. CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT SHALL BE A PRINT OUT OF THE COMPLETED

TRAINING CERTIFICATE.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.6.14

5. CONTRACT REFERENCE

DI-MISC-80711A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Threat Awareness and Reporting Program (TAScientific and Technical Reports

2. TITLE OF THE DATA ITEM

A014

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MISCA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

LT

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

13-JAN-2017

H. DATEG. PREPARED BY

Serrano, Erick

1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL

TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.

2. BLOCK 12: FIRST SUBMISSION OF CERTIFICATES OF COMPLETION IS DUE

30 DAYS AFTER CONTRACT AWARD.

3. BLOCK 13: ADDITIONAL SUBMISSIONS ARE REQUIRED AS NEW EMPLOYEES

ARE ADDED TO SUPPORT THE CONTRACT. SUBSEQUENT TRAINING AND

SUBMISSIONS ARE DUE NLT 30 DAYS FOLLOWING THE EMPLOYEE'S DATE OF HIRE.

4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF

ATTACHMENTS, VIA EMAIL TO

USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND

THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE

THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD

(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).

CERTIFICATE SUBMISSIONS SHALL BE IN SEARCHABLE ADOBE ACROBAT

READER (*.PDF) FORMATS.

5. GOVERNMENT WILL HAVE 5 WORK DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

6. CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT SHALL BE A PRINT OUT OF THE COMPLETED

TRAINING CERTIFICATE.

16. REMARKS 1SFAE-STRI-ITTS-I

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

Paragraph 3.6.15

5. CONTRACT REFERENCE

DI-MISC-80711A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

iWatch TrainngScientific and Technical Reports

2. TITLE OF THE DATA ITEM

A015

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-17-R-0003

E. CONTRACT/PR NO.

Prompt Gamma Simulator

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MISCA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .