PGS_CDRLs_011317.pdf
PDF 2 MB Posted
- Solicitation number
- W900KK-17-R-0003
About this file
NETCM PGS CDRLs
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-ITTS
6. REQUIRING OFFICE
Paragraph 3.2
5. CONTRACT REFERENCE
DI-MGMT-80227
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
Block 2: Contractors Progress, Status and Management Report
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: SHALL BE DUE NO LATER THAN 30 CALENDAR DAYS AFTER
CONTRACT AWARD.
3. BLOCK 13: SHALL BE DUE NO LATER THAN THE 7TH CALENDAR DAY OF
EVERY MONTH AND CONTINUE EVERY MONTH THROUGHOUT THE LIFE OF THE
CONTRACT. REVISIONS AS REQUIRED THROUGHOUT THE CONTRACT PERIOD
OF PERFORMANCE.
4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL
usarmy.orlando.peo-stri.list.pm-itts-netcm-cdrls@mail.mil AND TO THE
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD
(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).
SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE
ADOBE ACROBAT READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN ELECTRONIC
FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE OF THE
ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT THE
CONTRACT SPECIALIST FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE
FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT
ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION OF THESE FILE
TYPES, CONTACT THE CONTRACT SPECIALIST FOR SUBMISSION INSTRUCTIONS.
5. GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.
6. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. FORMAT: THIS REPORT SHALL BE TYPEWRITTEN ON STANDARD SIZE (e.g.
8-1/2" X 11"). ALL ATTACHMENTS SHALL BE IDENTIFIED AND REFERENCED
IN THE TEXT OF THE REPORT. THE REPORT SHALL BE PREPARED IN THE
CONTRACTOR'S FORMAT AND SHALL BE LEGIBLE AND SUITABLE FOR REPRODUCTION.
8. CONTENT: THE REPORT SHALL INCLUDE:
A. A FRONT COVER SHEET WHICH INCLUDES THE CONTRACTOR'S NAME
AND ADDRESS, THE CONTRACT NUMBER, THE NOMENCLATURE OF THE SYSTEM,
THE DATE OF THE REPORT, THE PERIOD COVERED BY THE REPORT, THE
TITLE OF THE REPORT, EITHER THE SERIAL NUMBER OF THE REPORT OR
THE CDRL SEQUENCE NUMBER, THE SECURITY CLASSIFICATION, AND THE
NAME OF THE ISSUING GOVERNMENT ACTIVITY;
B. DESCRIPTION OF THE PROGRESS MADE AGAINST MILESTONES DURING
THE REPORTING PERIOD;
C. RESULTS, POSITIVE OR NEGATIVE, OBTAINED RELATED TO
PREVIOUSLY-IDENTIFIED PROBLEM AREAS, WITH CONCLUSIONS AND RECOMMENDATIONS;
D. ANY SIGNIFICANT CHANGES TO THE CONTRACTOR'S ORGANIZATIONS
OR METHOD OF OPERATION, TO THE PROJECT MANAGEMENT STRUCTURE;
E. PROBLEM AREAS AFFECTING TECHNICAL OR SCHEDULING ELEMENTS,
WITH BACKGROUND AND ANY RECOMMENDATIONS BEYOND THE SCOPE OF THE CONTRACT;
F. ANY TRIPS AND SIGNIFICANT RESULTS;
G. RECORD OF ALL SIGNIFICANT TELEPHONE CALLS AND ANY
16. REMARKS 1SFAE-STRI-ITTS
010 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 2 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
16. REMARKS (Continued)
COMMITMENTS MADE BY TELEPHONE;
H. SUMMARY OF ENGINEERING CHANGE PROPOSAL (ECP) STATUS, INCLUDING IDENTIFICATION OF PROPOSED ECPs, APPROVED ECPs, AND IMPLEMENTED ECPs;
I. PLANS FOR ACTIVITIES DURING THE FOLLOWING REPORTING PERIOD;
J. NAME AND TELEPHONE NUMBER OF PREPARER OF THE REPORT;
K. APPENDIXES FOR ANY NECESSARY TABLES, REFERENCES, PHOTOGRAPHS, ILLUSTRATIONS, AND CHARTS.
9.DO NOT INCLUDE ANY INVOICING OR COSTING INFORMATION AS THERE ARE SEPARATE CDRLs FOR THIS REPORTING.
10. SMALL BUSINESS PARTICIPATION REPORTING: SMALL BUSINESS PARTICIPATION DATA SHALL BE SUBMITTED ON A SEMI-ANNUAL BASIS IN ACCORDANCE WITH THE SMALL BUSINESS PARTICIPATION FORM SET FORTH AS ATTACHMENT 5 (SMALL
BUSINESS PARTICIPATION FORM) IN SECTION J OF THE CONTRACT.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Page 2 of 2 PagesDD FORM 1423-1, FEB 2001
Paragraph 3.2.1, 3.2.2
5. CONTRACT REFERENCE
DI-MGMT-81861
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Format 1, 5 and 6Integrated Program Management Report (IPMR)
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
ONLY FORMAT 1, 5 and 6 IS REQUIRED AS PART OF THIS DID. WHILE EVM
IS NOT A REQUIREMENT OF THIS CONTRACT, THIS CDRL WILL BE
UTILIZED BY THE CONTRACTOR AND GOVERNMENT TEAM TO MONITOR
PROGRESS OF COST/ SCHEDULE/PERFORMANCE AND IMPLEMENT CORRECTIVE
ACTIONS FOR RISK REDUCTION AND SUCCESS OF PROJECT.
1. BLOCK 4:
FORMAT 1 SHALL BE IN XLMS FORMAT IN ADDITION TO GRAPHICAL
REPRESENTATION TO PMB BASELINE CREATED.
REPORTING LEVELS: INTEGRATED MASTER SCHEDULE (IMS) FORMAT 6
REPORTING SHALL INCLUDE A CONTRACTOR WORK BREAKDOWN SCHEDULE
(CWBS) CONSISTENT WITH FORMAT 1. THE CWBS SHALL BE AT A MINIMUM OF LEVEL 3.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY EFFECTIVE 1 JUNE 2015. OTHER REQUEST FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
3. BLOCK 12: INITIAL SUBMISSION IS DUE NO LATER THAN 55 CALENDAR
DAYS AFTER CONTRACT AWARD, AT TIME OF THE START OF WORK MEETING.
4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE THE 7TH CALENDAR
DAY OF EACH MONTH AND CONTINUE MONTHLY THROUGH CONTRACT PERIOD
OF PERFORMANCE.
5. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAILTO
usarmy.orlando.peo-stri.list.pm-itts-netcm-cdrls@mail.mil AND TO THE
CONTRACT SPECIALIST.
THE EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL
DATA ITEM NUMBER, AND REPORTING PERIOD (E.G., W900KK-15-D-0001/004,
CLIN 0002, CDRL A001, 1 MAY 2015). SUBMISSIONS FOR FORMAT 1 SHALL
BE IN XLMS FORMAT CONSISTENT PRACTICES UTILIZED FOR EVM
REPORTING. FORMAT 5 AND 6 WITH SHALL BE IN APPLICATION FORMAT
UTILIZED AND PDF FORMAT AS WELL.
FOR DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10
MB OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS
GREATER THAN 10 MB, CONTACT THE CONTRACT SPECIALIST FOR
SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF COMPRESSED OR ZIP
FILES AND EXECUTABLE FILES ARE NOT ACCEPTED BY THE PEO STRI
FIREWALL. FOR SUBMISSION OF GREATER THAN 10MB, CONTACT THE
CONTRACT SPECIALIST FOR SUBMISSION INSTRUCTIONS.
6. GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
7. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1SFAE-STRI-ITTS
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
Paragraph 3.2.2
5. CONTRACT REFERENCE
DI-MGMT-81651
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contract Invoicing and Payment Report
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
see block 16
11. AS OF DATE
see block 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: SHALL BE DUE NO LATER THAN 30 CALENDAR DAYS AFTER
CONTRACT AWARD.
3. BLOCK 13: SHALL BE DUE NO LATER THAN THE 7TH CALENDAR DAY OF
EACH MONTH AND CONTINUE MONTHLY THROUGHOUT THE CONTRACT PERIOD
OF PERFORMANCE.
4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND TO
THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE
THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD
(E.G., W900KK-15-D-0001/004, CLIN 0002, CDRL A001, 1 MAY 2015).
SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE
ADOBE ACROBAT READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN ELECTRONIC
FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE OF THE
ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT THE COR
FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF COMPRESSED OR
ZIP FILES AND EXECUTABLE FILES ARE NOT ACCEPTED BY THE PEO STRI
FIREWALL. FOR SUBMISSION OF THESE FILE TYPES, CONTACT THE COR
FOR SUBMISSION INSTRUCTIONS.
5. GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.
6. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SFAE-STRI-ITTS-IMO
Paragraph 3.2.2
5. CONTRACT REFERENCE
DI-MGMT-81468
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contract Funds Status Report (CFSR)
2. TITLE OF THE DATA ITEM
A004
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
see block 16
11. AS OF DATE
see block 16
12.DATE OF FIRST
SUBMISSION
BI-MO
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER AWARD OF THE CONTRACT.
3. BLOCK 13: SHALL CONTINUE EVERY TWO MONTHS THROUGH LIFE OF THE CONTRACT.
4. BLOCK 14: REPRODUCIBLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
IN MICROSOFT OFFICE 2013 OR PDF FORMAT COMPATIBLE. GRAPHICS
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH MICROSOFT OFFICE 2013. REPRODUCIBLES SHALL BE
E-MAILED TO:
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND
CONTRACT SPECIALIST.
5. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE; THOUGH ALL ELEMENTS OF THE
DID CONTENT SHALL BE ADDRESSED. IN ADDITION, PROVIDE A
GRAPHICAL REPRESENTATION OF THIS CDRL.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.2.3
5. CONTRACT REFERENCE
DI-MGMT-81808
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contractors Risk Management Plan
2. TITLE OF THE DATA ITEM
A005
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
see block 16
11. AS OF DATE
see block 16
12.DATE OF FIRST
SUBMISSION
BI-MO
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: INITIAL SUBMITTAL SHALL BE DUE 10 WORK DAYS BEFORE
THE START OF WORK MEETING.
3. BLOCK 13: EVERY TWO MONTHS THROUGHOUT THE LIFE OF THE CONTRACT
TO ADDRESS CURRENT PROJECT EFFORTS, UPCOMING MILESTONES, ETC
4. BLOCK 14: The contractor shall submit the data, in the form of attachments, via email to
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL. AND
CONTRACT SPECIALIST.
The email subject line shall include the contract number, CDRL data item number, and reporting period (e.g., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 May 2013). Submissions shall be in Microsoft Office 2013 or PDF compatible format. Graphic packages used to create figures, tables, and charts shall be compatible with Microsoft Word 2013 OR PDF COMPATIBLE FORMAT. For data submission with an electronic file size greater than 10 MB or if the combined size of the attachments to the email is greater than 10 MB, contact the COR for submission instructions. Email in the form of compressed or zip files and executable files are not accepted by the PEO STRI firewall. For submission of these file types, contact the COR for submission instructions.
5. THE GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
6. THE CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.4
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Cybersecurity ArtifactsScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A006
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISCA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
see block 16
11. AS OF DATE
see block 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: SHALL BE DUE NO LATER THAN 10 WORK DAYS PRIOR TO THE
INTEGRATION READY REVIEW (IRR).
3. BLOCK 13: FINAL SUBMISSION SHALL BE DUE NO LATER THAN 10 WORK
DAYS PRIOR TO THE TEST READY REVIEW (TRR).
4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL. AND
THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE
THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD
(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).
SUBMISSIONS REQUIREMENTS TO BE DETERMINED BASED ON WSMR RMF
REQUIREMENTS. SPECIFIC SUBMITTAL REQUIREMENTS AND SAMPLE RMF
CONTRACTOR SUBMITTAL DOCUMENTATION WILL BE DETERMINED AND
FINALIZED PRIOR TO THE CRITICAL DESIGN REVIEW (CDR).
5. GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.5
5. CONTRACT REFERENCE
DI-ADMN-81306
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Program Protection Implementation Plan (PPIP)
2. TITLE OF THE DATA ITEM
A007
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMNA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
see block 16
11. AS OF DATE
see block 16
12.DATE OF FIRST
SUBMISSION
Block 16
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,
ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED,
TITLE 50, U.S.C., APP. 240 ET SEQ.
2. BLOCK 12: INITIAL SUBMITTAL SHALL BE DUE 15 WORK DAYS BEFORE
PRELIMINARY DESIGN REVIEW (PDR).
3. BLOCK 13: SECOND SUBMITTAL DUE 15 DAYS PRIOR TO CRITICAL DESIGN
REVIEW (CDR). FINAL SUBMITTAL DUE 15 DAYS PRIOR TO INTEGRATION
READY REVIEW (IRR).
4. BLOCK 14: The contractor shall submit the data, in the form of attachments, via email to
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND
THE CONTRACT SPECIALIST.
The email subject line shall include the contract number, CDRL data item number, and reporting period (e.g., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 May 2013). Submissions shall be in Microsoft Office 2013 OR COMPATIBLE PDF FORMAT. Graphic packages used to create figures, tables, and charts shall be compatible with Microsoft Word 2013. For data submission with an electronic file size greater than 10 MB or if the combined size of the attachments to the email is greater than 10 MB, contact the COR for submission instructions. Email in the form of compressed or zip files and executable files are not accepted by the PEO STRI firewall. For submission of these file types, contact the COR for submission instructions.
5. THE GOVERNMENT WILL HAVE 20 WORK DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
6. THE CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.6
5. CONTRACT REFERENCE
DI-SESS-81785
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Systems Engineering Management Plan (SEMP)
2. TITLE OF THE DATA ITEM
A008
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. IMMEDIATELY FOLLOWING CONTRACT AWARD, THE CONTRACTOR WILL BE
PROVIDED WITH A COPY OF THE GOVERNMENT'S SYSTEM ENGINEERING PLAN
(SEP) TO COORDINATE THE CONTENT OF THE SEMP. THE SEMP IS
INTENDED TO BE A LIVING DOCUMENT WITH UPDATES THROUGHOUT LIFE
CYLE OF PROJECT.
3. BLOCK 12: 1ST SUBMISSION SHALL BE DUE NO LATER THAN 15 WORK
DAYS PRIOR TO THE SYSTEMS REQUIREMENTS REVIEW (SRR).
4. BLOCK 13:
SECOND AND FINAL SUBMISSION SHALL BE DUE NO LATER THAN 15 WORK
DAYS PRIOR TO THE PRELIMINARY DESIGN REVIEW (PDR).
5. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND TO
THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE
THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD
(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).
SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 OR SEARCHABLE
ADOBE ACROBAT READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN ELECTRONIC
FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE OF THE
ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT THE COR
FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF COMPRESSED OR
ZIP FILES AND EXECUTABLE FILES ARE NOT ACCEPTED BY THE PEO STRI
FIREWALL. FOR SUBMISSION OF THESE FILE TYPES, CONTACT THE COR
FOR SUBMISSION INSTRUCTIONS.
6. GOVERNMENT WILL HAVE 20 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
7. CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
8. REVISIONS TO THE DOCUMENT SHALL CLEARLY INDICATE CHANGES FROM
PREVIOUS VERSIONS THROUGH VERSION/REVISION NUMBER/LETTER,
HIGHLIGHTS, CHANGE BARS, ETC.
9. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.6.2.1, 3.6.2.2, 3.6.2.3
5. CONTRACT REFERENCE
DI-SESS-81497A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A009
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
see block 16
11. AS OF DATE
see block 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
Block 2: Reliability and Maintainability Predictions Report
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2.BLOCK 6: THIS CDRL CONTAINS SUMBITTAL DOCUMENTATION FOR THE
FOLLOWING ANALYSIS REQUIREMENTS:
- SYSTEM RELIABILITY MODEL (SRM)
- FAILURE MODES, EFFECTS & CRITICALITY ANALYSIS (FMECA)
- RELIABILITY ASSESSMENT
THE ABOVE ANALYSIS REQUIREMENTS ARE TO BE PERFORMED FOR EACH
MAJOR SYSTEM COMPRISING THE PGS.
3. BLOCK 12 AND 13: SHALL BE DUE NO LATER THAN 10 WORK DAYS PRIOR
TO THE START OF EACH SCHEDULED MAJOR SYSTEM SYSTEM'S ENGINERING
TECHNICAL REVIEW DURING THE PRELIMINARY AND DETAILED DESIGN PHASE.
4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND TO
THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE
THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD
(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).
SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 AND SEARCHABLE
ADOBE ACROBAT READER (*.PDF) FORMATS. DRAWINGS/SCHEMATICS SHALL
BE IN THEIR NATIVE FORMAT AND SEARCHABLE ADOBE ACROBAT READER
(*.PDF) FORMAT. GRAPHIC PACKAGES USED TO CREATE FIGURES, TABLES,
AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013. FOR
DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS
GREATER THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.
EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE
FILES ARE NOT ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION
OF THESE FILE TYPES, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.
5. GOVERNMENT WILL HAVE 15 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.6.2.4
5. CONTRACT REFERENCE
DI-SESS-81315B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A010
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
Block 16
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
Block 2: FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT (FRACAR)
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 4: SECTION - USE/RELATIONSHIP, CHANGE TO READ AS FOLLOWS:
PROVIDES IMMEDIATE REPORTING OF FAILURE AND SUBSEQUENT DETAILS
FAILURE ANALYSIS RESULTS AND CORRECTIVE ACTION RECOMMENDATION.
3. BLOCK 12: FIRST SUBMISSION TO OCCUR DURING PRELIMINARY
DESIGN/MODELING PHASE.
4. BLOCK 13: SUBSEQUENT SUBMISSIONS TO OCCUR DURING THE DETAILED
DESIGN PHASES, MANUFACTURING PHASES, ASSEMBLY AND TESTING
PHASES. FRACAS REPORTS ARE INTENDED TO BE A METHOD OF
RELIABILITY QUALITY CONTROL AND THUS NEED TO BE UPDATED ON A
REGULAR BASIS UPON OCCURRENCES OF FAILURES.
5. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND
CONTRACT SPECIALIST.
THE EMAIL SUBJECT LINE SHALL INCLUDE THE CONTRACT NUMBER, CDRL
DATA ITEM NUMBER, AND REPORTING PERIOD (E.G., W900KK-12-D-0003,
CLIN 0002, CDRL A001, 1 MAY 2013). SUBMISSIONS SHALL BE IN
MICROSOFT OFFICE 2013 OR PDF COMPATIBLE FORMAT. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN
ELECTRONIC FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE
OF THE ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT
THE COR FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF
COMPRESSED OR ZIP FILES AND EXECUTABLE FILES ARE NOT ACCEPTED
BY THE PEO STRI FIREWALL. FOR SUBMISSION OF THESE FILE TYPES,
CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.
6. GOVERNMENT WILL HAVE 5 WORK DAYS FOR REVIEW ISSUED FRACAS REPORTS.
7. CONTRACTOR SHALL HAVE 5 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
8. REVISIONS TO THE DOCUMENT SHALL CLEARLY INDICATE CHANGES FROM
PREVIOUS VERSIONS THROUGH VERSION/REVISION NUMBER/LETTER,
HIGHLIGHTS, CHANGE BARS, ETC.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.6.10
5. CONTRACT REFERENCE
DI-IPSC-81432A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
System/Subsystem Design Description (SSDD)
2. TITLE OF THE DATA ITEM
A011
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER IPSCA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 22 JANUARY 2015. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND
CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE THE
CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD
(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).
SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 AND/OR SEARCHABLE
ADOBE ACROBAT READER (*.PDF) FORMATS. DRAWINGS/SCHEMATICS SHALL
BE IN THEIR NATIVE FORMAT AND SEARCHABLE ADOBE ACROBAT READER
(*.PDF) FORMAT. GRAPHIC PACKAGES USED TO CREATE FIGURES, TABLES,
AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013. FOR
DATA SUBMISSION WITH AN ELECTRONIC FILE SIZE GREATER THAN 10 MB
OR IF THE COMBINED SIZE OF THE ATTACHMENTS TO THE EMAIL IS
GREATER THAN 10 MB, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.
EMAIL IN THE FORM OF COMPRESSED OR ZIP FILES AND EXECUTABLE
FILES ARE NOT ACCEPTED BY THE PEO STRI FIREWALL. FOR SUBMISSION
OF THESE FILE TYPES, CONTACT THE COR FOR SUBMISSION INSTRUCTIONS.
3. BLOCK 10, 12, 13:
FOR MAJOR DESIGN REVIEWS SRR/PDR/CDR/IRR/TRR (3.6.9.1, 3.6.9.2,
3.6.9.3, 3.7.2, 3.7.3): LEVEL OF DETAIL SHALL BE ABLE TO REFLECT
INFORMATION ADEQUATE FOR REVIEW.
SHALL BE DUE NO LATER THAN 15 WORK DAYS PRIOR TO THE START OF
EACH SCHEDULED REVIEW.
GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
CONTRACTOR SHALL HAVE 15 WORK DAYS SUBSEQUENT TO DESIGN REVIEW
TO INCORPORATE GOVERNMENT COMMENTS.
FINAL SUBMITTAL:
SHALL BE DUE 45 DAYS PRIOR TO SYSTEM VERIFICAION REVIEW (SVR):
GOVERNMENT WILL HAVE 10 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT
COMMENTS AND DELIVER FINAL
PACKAGE DURING THE SVR.
16. REMARKS 1SFAE-STIR-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.6.11
5. CONTRACT REFERENCE
DI-SAFT-80102C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SAFETY ASSESSMENT REPORT
2. TITLE OF THE DATA ITEM
A012
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
11. AS OF DATE
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: FIRST SUBMISSION SHALL BE DUE NO LATER THAN 20 WORK
DAYS PRIOR TO CRITICAL DESIGN REVIEW (CDR).
3. BLOCK 13: SECOND SUBMISSION SHALL BE DUE NO LATER THAN 20 WORK
DAYS PRIOR TO THE INTEGRATION READINESS REVIEW (IRR).
4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND
THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE
THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD
(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).
SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2013 OR SEARCHABLE
ADOBE ACROBAT READER (*.PDF) FORMATS. GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE 2013. FOR DATA SUBMISSION WITH AN ELECTRONIC
FILE SIZE GREATER THAN 10 MB OR IF THE COMBINED SIZE OF THE
ATTACHMENTS TO THE EMAIL IS GREATER THAN 10 MB, CONTACT THE COR
FOR SUBMISSION INSTRUCTIONS. EMAIL IN THE FORM OF COMPRESSED OR
ZIP FILES AND EXECUTABLE FILES ARE NOT ACCEPTED BY THE PEO STRI
FIREWALL. FOR SUBMISSION OF THESE FILE TYPES, CONTACT THE
CONTRACTING SPECIALIST FOR SUBMISSION INSTRUCTIONS.
5. GOVERNMENT WILL HAVE 20 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
8. REVISIONS TO THE DOCUMENT SHALL CLEARLY INDICATE CHANGES FROM
PREVIOUS VERSIONS THROUGH VERSION/REVISION NUMBER/LETTER,
HIGHLIGHTS, CHANGE BARS, ETC.
9. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.6.12
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Anti-Terrorism (AT) Level 1 Awareness TraiScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A013
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISCA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: FIRST SUBMISSION OF CERTIFICATES OF COMPLETION IS DUE
30 DAYS AFTER CONTRACT AWARD.
3. BLOCK 13: ADDITIONAL SUBMISSIONS ARE REQUIRED AS NEW EMPLOYEES
ARE ADDED TO SUPPORT THE CONTRACT. SUBSEQUENT TRAINING AND
SUBMISSIONS ARE DUE NLT 30 DAYS FOLLOWING THE EMPLOYEE'S DATE OF HIRE.
4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND
THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE
THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD
(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).
CERTIFICATE SUBMISSIONS SHALL BE IN SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS.
5. GOVERNMENT WILL HAVE 5 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT SHALL BE A PRINT OUT OF THE COMPLETED
TRAINING CERTIFICATE.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.6.14
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Threat Awareness and Reporting Program (TAScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A014
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISCA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
13-JAN-2017
H. DATEG. PREPARED BY
Serrano, Erick
1. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS DUE TO CRITICAL
TECHNOLOGY 1 JUNE 2015. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO U.S. ARMY PEO STRI/SFAE-STRI-ITTS.
2. BLOCK 12: FIRST SUBMISSION OF CERTIFICATES OF COMPLETION IS DUE
30 DAYS AFTER CONTRACT AWARD.
3. BLOCK 13: ADDITIONAL SUBMISSIONS ARE REQUIRED AS NEW EMPLOYEES
ARE ADDED TO SUPPORT THE CONTRACT. SUBSEQUENT TRAINING AND
SUBMISSIONS ARE DUE NLT 30 DAYS FOLLOWING THE EMPLOYEE'S DATE OF HIRE.
4. BLOCK 14: CONTRACTOR SHALL SUBMIT THE DATA, IN THE FORM OF
ATTACHMENTS, VIA EMAIL TO
USARMY.ORLANDO.PEO-STRI.LIST.PM-ITTS-NETCM-CDRLS@MAIL.MIL AND
THE CONTRACT SPECIALIST. THE EMAIL SUBJECT LINE SHALL INCLUDE
THE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, AND REPORTING PERIOD
(E.G., W900KK-12-D-0003, CLIN 0002, CDRL A001, 1 MAY 2013).
CERTIFICATE SUBMISSIONS SHALL BE IN SEARCHABLE ADOBE ACROBAT
READER (*.PDF) FORMATS.
5. GOVERNMENT WILL HAVE 5 WORK DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. CONTRACTOR SHALL HAVE 10 WORK DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT SHALL BE A PRINT OUT OF THE COMPLETED
TRAINING CERTIFICATE.
16. REMARKS 1SFAE-STRI-ITTS-I
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
Paragraph 3.6.15
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
iWatch TrainngScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A015
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-17-R-0003
E. CONTRACT/PR NO.
Prompt Gamma Simulator
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISCA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .