W81XWH-17-R-0009_Amendment_0002_07-19-2017.pdf
PDF 274 KB Posted
- Attached to
- General Laboratory Supplies, Chemicals, Scientific and Laboratory Equipment, and Animal Supplies
- Solicitation number
- W81XWH-17-R-0009
- Issued by
-
Department of the Army Medical Command
About this file
W81XWH-17-R-0009 Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W81XWH-17-R-0009_Q&A_FINAL_07-19-2017.pdf | ||
| Exhibit_C_Supply_List_Amendment_0002_07-19-2017.xlsx | XLSX spreadsheet | |
| SF_30_W81XWH-17-R-0009_Amendment_00001.pdf | ||
| Copy_of_Exhibit_C_Supply_List_Amendment_01_07-12-2017.xlsx | XLSX spreadsheet | |
| W81XWH-17-R-0009_Exhibit_B_Past_Performance_Questionnaire_without_ARL_07-07-2017.pdf | ||
| W81XWH-17-R-0009_Exhibit_A_-_Pricing_Sheet_FINAL_07-07-2017.xlsx | XLSX spreadsheet | |
| Exhibit_C_Supply_List_without_ARL_07-07-2017.xlsx | XLSX spreadsheet | |
| W81XWH-17-R-0009_FINAL_07-07-2017.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See SF-30, Block 14 Continuation Page for description of Amendment.
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W81XWH-17-R-0009
X 9B. DATED (SEE ITEM 11)
07-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2017
CODE
USA MED RESEARCH ACQ ACTIVITY
820 CHANDLER ST
FORT DETRICK MD 21702-5014
W81XWH 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W81XWH-17-R-0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SF-30 BLOCK 14 CONTINUATION
The purpose of this amendment is to:
(1) Release the Government's answers to the questions submitted prior to the closing date for receipt of questions on
14 July 2017.
(2) Revise Exhibit C - Supply List to correct the total number of supplies from 420 to 418.
(3) Revise Section A.2.1, paragraph (2), page 58 of the solicitation posted on 7 July 2017 to change the paragraph from:
"The Offeror is capable of delivering a minimum of 80% or 336 of the 420 supply items in Attachments A through G as evidence from #1 above” to
"The Offeror is capable of delivering a minimum of 80% or 334 of the 418 supply items in Attachments A through G as evidence from #1 above."
(4) Revise Section A.2.3, page 59, of the solicitation posted on 7 July 2017 to change the second sentence from:
"The Offeror's price proposal is a result of completing Exhibit C which is the 30 random sample of supplies found as Attachment J."
to
"The Offeror's price proposal is a result of completing Exhibit A Price Sheet which is the 30 random sample of supplies found as Attachment J.”
(5) Renumber Exhibit C – Supply List starting on line 182 through line 418.
The date for receipt of proposals is NOT extended.
SECTION SF 1449 - CONTINUATION SHEET
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Exhibit A - Price Sheet 4 07-JUL-2017
Exhibit B Exhibit B - Past
Performance
Questionnaire
6 07-JUL-2017
Exhibit C Exhibit C - Supply List 15 12-JUL-2017 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Exhibit A - Price Sheet 4 07-JUL-2017
Exhibit B Exhibit B - Past
Performance
Questionnaire
6 07-JUL-2017
Exhibit C Exhibit C - Supply List 15 19-JUL-2017
The following have been modified:
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
**INCLUDES ADDENDUM. STARTING AT SECTION “A” BELOW**
A. BASIS FOR AWARD
A.1.1. Award of Multiple-Award Blanket Purchase Agreements (BPA) shall be made on a competitive basis, using the best value Lowest Price Technically Acceptable (LPTA) source selection procedures among price and non-price factors IAW FAR 15.101-2. The LPTA source selection process is appropriate when best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. The Government may award up to five (5) Multiple-Award (MA) BPAs to the lowest priced technically acceptable Offerors; however, the
Government reserves the right to make the final determination on the number of BPAs to award based on the
Offerors ability to provide the required supplies, mission requirements, and the Government’s administrative costs to efficiently administer each BPA awarded as a result of this solicitation.
A.1.2. The resulting Call Orders from the BPAs shall be competitive Firm-Fixed Price (FFP) Contract Line Item
Numbers (CLINs) for general laboratory supplies, chemicals, scientific and laboratory equipment, and animal supplies. The Government anticipates the use of cost reimbursable CLINs for shipping and handling of the supplies.
A.1.3. The Government intends to evaluate and award without discussions; however, the Government reserves the right to conduct discussions. If discussions are required, they will be conducted with Offerors IAW Federal
Acquisition Regulation (FAR) 15.306.
A.1.4. Past Performance will be evaluated independently from the other non-price evaluation factor in accordance with FAR 15.305 and DFARS 215.305. The comparative assessment required by FAR 15.305(a)(2)(i) for Past
Performance does not apply. Therefore, past performance will be rated on an “acceptable” or “unacceptable” basis.
The evaluation factors are listed below:
Factor 1 – Technical Capability/Specifications
Factor 2 – Corporate Experience
Factor 3 – Past Performance
Factor 4 – Price
A.1.4. The non-price Factors 1, 2, and 3 will be evaluated to determine whether the Offeror’s proposal is acceptable or unacceptable.
A.1.5. The Government will not assume that the Offeror possesses any capability or knowledge unless it is specified in the proposal.
A.1.6. The non-price Factors 1, 2, and 3 will be rated individually from Factor 4. If Factors 1, 2, and 3 above receives an individual rating of “Unacceptable”, the collective overall rating will also be “Unacceptable.” Only proposals receiving an overall rating of “Acceptable” will be considered for award.
A.2. EVALUATION CRITERIA
A.2.1. Factor 1 – Technical Capability/Specifications: The Offeror’s proposal will be evaluated to the degree which the Offeror meets all of the following:
(1) The Offeror shall provide a response to all supply items in Attachments A through G by stating “Yes” or “No” in the column titled “Capable of Supplying” under Exhibit C. A response to each line item is required and failure to provide a response will be interpreted as “No” (non-response = No).
(2) The Offeror is capable of delivering a minimum of 80% or 334 of the 418 supply items in Attachments A through G as evidence from #1 above. (AMENDMENT 0002)
(3) The Offeror shall provide three (3) different copies of previous shipping records, dated within the last three (3) years as evidence of the capacity to accommodate the special handling, packaging, or temperature sensitive medical products for shipment of the required supplies.
(4) The Offeror shall provide a Draft Quality Control Plan (QCP) regardless of the number of products the Offeror is capable of delivering. The Draft QCP cannot exceed five (5) pages and must address the following:
(a) A description of internal review procedures that facilitate high-quality standards (i.e., inspection, identifying and correcting deficiencies) to ensure compliance with BPA requirements.
(b) Identification of individuals responsible for ensuring quality control.
(c) Whether or not subcontractors are used and, if so, the quality control measures used to ensure acceptable subcontractor performance.
(d) How potential problem areas and solutions are handled.
(e) The procedures for ensuring quality performance when meeting urgent requirements.
(f) How quality control will be managed when completing multiple projects for multiple agencies simultaneously.
A.2.2. Factor 2 – Corporate Experience: The Offeror must submit a narrative description of its corporate experience. This narrative cannot exceed two pages and must address the following:
(1) The number of years of corporate experience in providing the supplies described under Attachments A through
G, regardless of the specific products being proposed – a minimum of two (2) years of corporate experience within the last 10 years is required.
(2) The Offeror’s number of employees, experience in the field, and resources to enable it to fulfill the requirements.
(3) Brief history of the Offeror’s activities contributing to the development of expertise and capabilities related to this requirement.
(4) Information that demonstrates the Offeror's organizational and accounting controls.
(5) A description of the resources presently in-house and the ability to acquire the type and kind of supplies required.
(6) How the proposed subcontractor’s corporate experience is identical, similar, or related to providing the required supplies.
A.2.2. Factor 3 - Past Performance: The past performance shall be evaluated on the basis of the Offeror’s demonstrated recent and relevant record of performance in providing general laboratory supplies, chemical, scientific, and laboratory equipment, and animal supplies that meets the requirements of the SoN. The Government will use available sources to obtain past performance information from established systems such as the Past
Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information
System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; and may be obtained from other sources available to the Government, such as the Defense Contract Management Agency (DCMA) and
Contracting Officers to determine the how well the Offeror performed on prior contracts within the past three (3) years.
(a) The past performance evaluation performed does not establish, create, or change the existing record and history of the Offeror’s past performance on past contracts; rather, the past performance evaluation process gathers information on how well the Offeror performed on those past contracts.
(b) Recency is defined as past performance efforts in the past three (3) years.
(c) Relevancy is defined as how relevant a recent effort accomplished by the Offeror is to the requirement.
The Government will measure the extent of similarity of recent efforts in terms of size, scope, complexity, dollar value, and award type to this requirement.
(d) In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305
(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/ unacceptability, a neutral rating shall be considered “acceptable.”
A.2.3. Factor 4 – Price: The price will be evaluated separately from the non-price evaluation factors. The Offeror’s price proposal is the result of completing Exhibit A Price Sheet (AMENDMENT 0002) which is the 30 random sample of supplies found as Attachment J. Price proposal evaluation is to determine whether the Offeror’s price proposal is fair and reasonable in accordance with FAR 15.404-1(b). The Government will evaluate the consistency, completeness, fairness and reasonableness of the Offeror’s price proposal. Price analysis will be used to determine the total evaluated price to support the selection of the lowest priced, technically acceptable Offeror.
A.3. EVALUATION RATING STANDARDS
A.3.1. RATING STANDARDS FOR THE NON-PRICE PROPOSAL (EXCLUDING PAST
PERFORMANCE)
Rating Description
Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
A.3.2. RATING STANDARDS FOR PAST PERFORMANCE
Rating Description
Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the
Offeror’s performance record is unknown.
Unacceptable Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.
A.4. DEFINITIONS
Term Definition
Clarifications Limited exchanges between the Government and Offerors that may occur when award without discussions is contemplated.
Discussions Negotiations conducted in a competitive acquisition. Discussions take place after establishment of the competitive range.
Recency
As it pertains to past performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.
*For the purpose of this requirement, Recency is defined as past performance efforts in the past three (3) years.
Relevancy
As it pertains to past performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.
*For the purpose of this requirement, the Government will measure the extent of similarity of recent efforts in terms of size, scope, complexity, dollar value, and award type to this requirement.
**END OF ADDENDUM**
b. A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.
Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .