Sources Sought for Erbil Airbase Taxiway
Solicitation number
W5J9JE20-PN2018-0093
Issued by

About this file

This document is a sources sought notice for the planning, design, and construction of an alternate taxiway at Erbil Airbase in Iraq. The U.S. Army Corps of Engineers, Transatlantic Afghanistan District is seeking capable sources for the project with an estimated value between $5-10 million. Responses are requested by May 8, 2020 to identify qualified sources in NAICS code 236220 for commercial and institutional building construction. The project will utilize a two-phase design-build acquisition including a request for qualifications and a request for proposal with anticipated award in September 2020. The scope of work involves demolishing an existing pump house, abandoning a water well, relocating a fiber optic line, excavating and grading the site, installing a concrete taxiway and subsurface drainage, and cutting an existing taxiway and service road to install culverts for drainage. Bonding will be required and offerors must provide bonding capacity information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MARKET RESEARCH QUESTIONNAIRE

ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ

(PLANNING, DESIGN, AND CONSTRUCTION)

W5J9JE20-PN2018-0093

Company Name: ________________________________________

Company Address: ________________________________________

Point of Contact: _________________ Email: _______________ Phone: ____________

1. If solicitation is published do you plan to submit a proposal?

Yes No

2. Does your firm have an active (updated) or are currently registered in the following e- Business systems?

a. Joint Contingency Contracting System (JCCS) [ https://www.jccs.gov/]:

Yes No

JCCS Identification (ID):

b. System for Award Management (SAM) [https://sam.gov/)

Yes No

Commercial and Government Entity (CAGE) Code: _________________

Dun and Bradstreet (DUNS) Number: ____________

NOTE: Your firm must have an active and completed registration in the mentioned systems prior to submission of a proposal.

3. Does your firm have bonding capability?

Yes No

Name of your surety your firm: ____________________________________________

Single bonding capability: $___________

Aggregate bonding capability: $______________ https://www.jccs.gov/

If no, will the firm have bonding capability prior to the release of this requirement’s solicitation publication (anticipated June 2020)?

Yes No

4. Other information provided.

5. Does your firm have experience in design and construction of the facilities and structures mentioned on this publication?

Yes No

Provide your experience as a Prime contractor completing design and construction projects valued between $5.0 million (M) and $10.0M, in size or more – minimum of three (3) relevant projects. (See Attached Experience Form)

Ensure you your response aligns with the Project Scope mentioned in this publication. In addition, ensure that the provided three references are contactable (e.g., phone or email).

EXPERIENCE FORM

ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ

(PLANNING, DESIGN, AND CONSTRUCTION)

W5J9JE20-PN2018-0093

NOTE: Firms that perform as a subcontractor shall include the contracting agency or entity’s name and point of contact as well as the name of the Prime contractor. The “customer” is not the prime contractor; it is the contracting agency or entity that administers the contract.

Project Number: _____________________________

Name of Offeror: ________________________________________

Contract Number: ____________________________

Contract Title: _______________________________

Location (City or Province): ____________________

Contracting Agency/Entity: ____________________________________________

Contracting Point of Contact Name: ______________________ Email: _________________

Name of Prime Contractor (if applicable): _____________________________________

Prime Point of Contact Name: : ______________________ Email: _________________

Offeror Performed as a (check one and list percentage of self-performance):

Prime Subcontractor Joint-Venture Partnership

______% Self-Performed

Contract Amount: Original Amount $______________ Final Amount $_____________

Self-Performed $_______________

Contract Award Date:

Contract Duration (Period of Performance): __________ to ___________

Original Completion Date:

Actual Completion Date:

Provide a short narrative on the description of the project scope and the offeror’s specific roles and responsibilities in performing the work to include the technical approach to the project:

ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ

(PLANNING, DESIGN, AND CONSTRUCTION)

W5J9JE20-PN2018-0093

NOTE: Firms that perform as a subcontractor shall include the contracting agency or entity’s name and point of contact as well as the name of the Prime contractor. The “customer” is not the prime contractor; it is the contracting agency or entity that administers the contract.

Project Number: _____________________________

Name of Offeror: ________________________________________

Contract Number: ____________________________

Contract Title: _______________________________

Location (City or Province): ____________________

Contracting Agency/Entity: ____________________________________________

Contracting Point of Contact Name: ______________________ Email: _________________

Name of Prime Contractor (if applicable): _____________________________________

Prime Point of Contact Name: : ______________________ Email: ___________________

Offeror Performed as a (check one and list percentage of self-performance):

Prime Subcontractor Joint-Venture Partnership

______% Self-Performed

Contract Amount: Original Amount $______________ Final Amount $_____________

Self-Performed $_______________

Contract Award Date:

Contract Duration (Period of Performance): __________ to ___________

ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ

(PLANNING, DESIGN, AND CONSTRUCTION)

W5J9JE20-PN2018-0093

NOTE: Firms that perform as a subcontractor shall include the contracting agency or entity’s name and point of contact as well as the name of the Prime contractor. The “customer” is not the prime contractor; it is the contracting agency or entity that administers the contract.

Project Number: _____________________________

Name of Offeror: ________________________________________

Contract Number: ____________________________

Contract Title: _______________________________

Location (City or Province): ____________________

Contracting Agency/Entity: ____________________________________________

Contracting Point of Contact Name: ______________________ Email: _________________

Name of Prime Contractor (if applicable): _____________________________________

Prime Point of Contact Name: : ______________________ Email: _________________

Offeror Performed as a (check one and list percentage of self-performance):

Prime Subcontractor Joint-Venture Partnership

______% Self-Performed

Contract Amount: Original Amount $______________ Final Amount $_____________

Self-Performed $_______________

Contract Award Date:

Contract Duration (Period of Performance): __________ to ___________

Company Name:
Company Address:
Point of Contact:
Email:
Phone:
Commercial and Government Entity CAGE Code:
Dun and Bradstreet DUNS Number:
Name of your surety your firm:
Single bonding capability:
Aggregate bonding capability:
4 Other information provided:
Project Number:
Name of Offeror:
Contract Number:
Contract Title:
Location City or Province:
Contracting AgencyEntity:
Contracting Point of Contact Name:
Email_2:
Name of Prime Contractor if applicable:
Prime Point of Contact Name:
Email_3:
SelfPerformed:
Contract Amount Original Amount:
Final Amount:
SelfPerformed_2:
and responsibilities in performing the work to include the technical approach to the project:
Project Number_2:
Name of Offeror_2:
Contract Number_2:
Contract Title_2:
Location City or Province_2:
Email_4:
Name of Prime Contractor if applicable_2:
Prime Point of Contact Name_2:
Email_5:
SelfPerformed_3:
Contract Amount Original Amount:
Final Amount_2:
SelfPerformed_4:
and responsibilities in performing the work to include the technical approach to the project_2:
Project Number_3:
Name of Offeror_3:
Contract Number_3:
Contract Title_3:
Location City or Province_3:
Email_6:
Name of Prime Contractor if applicable_3:
Prime Point of Contact Name_3:
Email_7:
SelfPerformed_5:
Contract Amount Original Amount_2:
Final Amount_3:
SelfPerformed_6:
and responsibilities in performing the work to include the technical approach to the project_3:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Date16_af_date:
Date17_af_date:
Date18_af_date:
Date19_af_date:
Contracting AgencyEntity_2:
Contracting Point of Contact Name_2:
Contract Award Date_2:
Date23_af_date:
Date24_af_date:
Date25_af_date:
Date26_af_date:
Date28_af_date:
Date29_af_date:
Date30_af_date:
Date31_af_date:
Contracting Agency/Entity_3:
Contracting Point of Contact Name_3:
Check Box33: Off
Check Box34: Off
Check Box35: Off
Date36_af_date:
Contract Award Date:
Check Box38: Off
Check Box39: Off
Check Box40: Off

File details come from the government source that posted it. Updated .