Market Research Questionnaire.pdf
PDF 214 KB Posted
- Attached to
- Sources Sought for Erbil Airbase Taxiway
- Solicitation number
- W5J9JE20-PN2018-0093
About this file
This document is a sources sought notice for the planning, design, and construction of an alternate taxiway at Erbil Airbase in Iraq. The U.S. Army Corps of Engineers, Transatlantic Afghanistan District is seeking capable sources for the project with an estimated value between $5-10 million. Responses are requested by May 8, 2020 to identify qualified sources in NAICS code 236220 for commercial and institutional building construction. The project will utilize a two-phase design-build acquisition including a request for qualifications and a request for proposal with anticipated award in September 2020. The scope of work involves demolishing an existing pump house, abandoning a water well, relocating a fiber optic line, excavating and grading the site, installing a concrete taxiway and subsurface drainage, and cutting an existing taxiway and service road to install culverts for drainage. Bonding will be required and offerors must provide bonding capacity information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Market Research Questionnaire.pdf | ||
| A.01.23 Sources Sought with Vendor Info_Erbil Taxiway.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARKET RESEARCH QUESTIONNAIRE
ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ
(PLANNING, DESIGN, AND CONSTRUCTION)
W5J9JE20-PN2018-0093
Company Name: ________________________________________
Company Address: ________________________________________
Point of Contact: _________________ Email: _______________ Phone: ____________
1. If solicitation is published do you plan to submit a proposal?
Yes No
2. Does your firm have an active (updated) or are currently registered in the following e- Business systems?
a. Joint Contingency Contracting System (JCCS) [ https://www.jccs.gov/]:
Yes No
JCCS Identification (ID):
b. System for Award Management (SAM) [https://sam.gov/)
Yes No
Commercial and Government Entity (CAGE) Code: _________________
Dun and Bradstreet (DUNS) Number: ____________
NOTE: Your firm must have an active and completed registration in the mentioned systems prior to submission of a proposal.
3. Does your firm have bonding capability?
Yes No
Name of your surety your firm: ____________________________________________
Single bonding capability: $___________
Aggregate bonding capability: $______________ https://www.jccs.gov/
If no, will the firm have bonding capability prior to the release of this requirement’s solicitation publication (anticipated June 2020)?
Yes No
4. Other information provided.
5. Does your firm have experience in design and construction of the facilities and structures mentioned on this publication?
Yes No
Provide your experience as a Prime contractor completing design and construction projects valued between $5.0 million (M) and $10.0M, in size or more – minimum of three (3) relevant projects. (See Attached Experience Form)
Ensure you your response aligns with the Project Scope mentioned in this publication. In addition, ensure that the provided three references are contactable (e.g., phone or email).
EXPERIENCE FORM
ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ
(PLANNING, DESIGN, AND CONSTRUCTION)
W5J9JE20-PN2018-0093
NOTE: Firms that perform as a subcontractor shall include the contracting agency or entity’s name and point of contact as well as the name of the Prime contractor. The “customer” is not the prime contractor; it is the contracting agency or entity that administers the contract.
Project Number: _____________________________
Name of Offeror: ________________________________________
Contract Number: ____________________________
Contract Title: _______________________________
Location (City or Province): ____________________
Contracting Agency/Entity: ____________________________________________
Contracting Point of Contact Name: ______________________ Email: _________________
Name of Prime Contractor (if applicable): _____________________________________
Prime Point of Contact Name: : ______________________ Email: _________________
Offeror Performed as a (check one and list percentage of self-performance):
Prime Subcontractor Joint-Venture Partnership
______% Self-Performed
Contract Amount: Original Amount $______________ Final Amount $_____________
Self-Performed $_______________
Contract Award Date:
Contract Duration (Period of Performance): __________ to ___________
Original Completion Date:
Actual Completion Date:
Provide a short narrative on the description of the project scope and the offeror’s specific roles and responsibilities in performing the work to include the technical approach to the project:
ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ
(PLANNING, DESIGN, AND CONSTRUCTION)
W5J9JE20-PN2018-0093
NOTE: Firms that perform as a subcontractor shall include the contracting agency or entity’s name and point of contact as well as the name of the Prime contractor. The “customer” is not the prime contractor; it is the contracting agency or entity that administers the contract.
Project Number: _____________________________
Name of Offeror: ________________________________________
Contract Number: ____________________________
Contract Title: _______________________________
Location (City or Province): ____________________
Contracting Agency/Entity: ____________________________________________
Contracting Point of Contact Name: ______________________ Email: _________________
Name of Prime Contractor (if applicable): _____________________________________
Prime Point of Contact Name: : ______________________ Email: ___________________
Offeror Performed as a (check one and list percentage of self-performance):
Prime Subcontractor Joint-Venture Partnership
______% Self-Performed
Contract Amount: Original Amount $______________ Final Amount $_____________
Self-Performed $_______________
Contract Award Date:
Contract Duration (Period of Performance): __________ to ___________
ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ
(PLANNING, DESIGN, AND CONSTRUCTION)
W5J9JE20-PN2018-0093
NOTE: Firms that perform as a subcontractor shall include the contracting agency or entity’s name and point of contact as well as the name of the Prime contractor. The “customer” is not the prime contractor; it is the contracting agency or entity that administers the contract.
Project Number: _____________________________
Name of Offeror: ________________________________________
Contract Number: ____________________________
Contract Title: _______________________________
Location (City or Province): ____________________
Contracting Agency/Entity: ____________________________________________
Contracting Point of Contact Name: ______________________ Email: _________________
Name of Prime Contractor (if applicable): _____________________________________
Prime Point of Contact Name: : ______________________ Email: _________________
Offeror Performed as a (check one and list percentage of self-performance):
Prime Subcontractor Joint-Venture Partnership
______% Self-Performed
Contract Amount: Original Amount $______________ Final Amount $_____________
Self-Performed $_______________
Contract Award Date:
Contract Duration (Period of Performance): __________ to ___________
| Company Name: |
| Company Address: |
| Point of Contact: |
| Email: |
| Phone: |
| Commercial and Government Entity CAGE Code: |
| Dun and Bradstreet DUNS Number: |
| Name of your surety your firm: |
| Single bonding capability: |
| Aggregate bonding capability: |
| 4 Other information provided: |
| Project Number: |
| Name of Offeror: |
| Contract Number: |
| Contract Title: |
| Location City or Province: |
| Contracting AgencyEntity: |
| Contracting Point of Contact Name: |
| Email_2: |
| Name of Prime Contractor if applicable: |
| Prime Point of Contact Name: |
| Email_3: |
| SelfPerformed: |
| Contract Amount Original Amount: |
| Final Amount: |
| SelfPerformed_2: |
| and responsibilities in performing the work to include the technical approach to the project: |
| Project Number_2: |
| Name of Offeror_2: |
| Contract Number_2: |
| Contract Title_2: |
| Location City or Province_2: |
| Email_4: |
| Name of Prime Contractor if applicable_2: |
| Prime Point of Contact Name_2: |
| Email_5: |
| SelfPerformed_3: |
| Contract Amount Original Amount: |
| Final Amount_2: |
| SelfPerformed_4: |
| and responsibilities in performing the work to include the technical approach to the project_2: |
| Project Number_3: |
| Name of Offeror_3: |
| Contract Number_3: |
| Contract Title_3: |
| Location City or Province_3: |
| Email_6: |
| Name of Prime Contractor if applicable_3: |
| Prime Point of Contact Name_3: |
| Email_7: |
| SelfPerformed_5: |
| Contract Amount Original Amount_2: |
| Final Amount_3: |
| SelfPerformed_6: |
| and responsibilities in performing the work to include the technical approach to the project_3: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Date16_af_date: |
| Date17_af_date: |
| Date18_af_date: |
| Date19_af_date: |
| Contracting AgencyEntity_2: |
| Contracting Point of Contact Name_2: |
| Contract Award Date_2: |
| Date23_af_date: |
| Date24_af_date: |
| Date25_af_date: |
| Date26_af_date: |
| Date28_af_date: |
| Date29_af_date: |
| Date30_af_date: |
| Date31_af_date: |
| Contracting Agency/Entity_3: |
| Contracting Point of Contact Name_3: |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Date36_af_date: |
| Contract Award Date: |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
File details come from the government source that posted it. Updated .