Market Research Questionnaire.pdf
PDF 221 KB Posted
- Attached to
- Sources Sought for Erbil Airbase Taxiway
- Solicitation number
- W5J9JE20-PN2018-0093
About this file
This document includes a market research questionnaire and sources sought notice for a construction project. The U.S. Army Corps of Engineers is seeking sources to design and construct an alternate taxiway at Erbil Airbase in Iraq, with an estimated value between $5-10 million. The project involves surveying, demolition, excavation, drainage, pavement installation, and repairs. Interested parties must complete the questionnaire by May 8th and provide details on relevant experience and bonding capacity. The solicitation will use a two-phase selection process, with a request for qualifications followed by a request for proposal, and award is planned for September 2020.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Market Research Questionnaire.pdf | ||
| A.01.23 Sources Sought with Vendor Info_Erbil Taxiway.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARKET RESEARCH QUESTIONNAIRE
ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ
(PLANNING, DESIGN, AND CONSTRUCTION)
W5J9JE20-PN2018-0093
Company Name:
Company Address:
Point of Contact:
Email: Phone:
1. If solicitation is published do you plan to submit a proposal?
Yes No
2. Does your firm have an active (updated) or are currently registered in the following e- Business systems?
a. Joint Contingency Contracting System (JCCS) [ https://www.jccs.gov/]:
JCCS Identification (ID):
b. System for Award Management (SAM) [https://sam.gov/)
Commercial and Government Entity (CAGE) Code:
Dun and Bradstreet (DUNS) Number:
NOTE: Your firm must have an active and completed registration in the mentioned systems prior to submission of a proposal.
3. Does your firm have bonding capability?
Name of your surety your firm: ____________________________________________
Single bonding capability: $___________
Aggregate bonding capability: $______________ https://www.jccs.gov/ https://www.sam.gov/portal/SAM/
If no, will the firm have bonding capability prior to the release of this requirement’s solicitation publication (anticipated June 2020)?
4. Other information provided.
5. Does your firm have experience in design and construction of the facilities and structures mentioned on this publication?
Provide your experience as a Prime contractor completing design and construction projects valued between $5.0 million (M) and $10.0M, in size or more – minimum of three (3) relevant projects. (See Attached Experience Form)
Ensure you your response aligns with the Project Scope mentioned in this publication. In addition, ensure that the provided three references are contactable (e.g., phone or email).
EXPERIENCE FORM
NOTE: Firms that perform as a subcontractor shall include the contracting agency or entity’s name and point of contact as well as the name of the Prime contractor. The “customer” is not the prime contractor; it is the contracting agency or entity that administers the contract.
Project Number:
Name of Offeror:
Contract Number:
Contract Title:
Location (City or Province):
Contracting Agency/Entity:
Contracting Point of Contact Name: Email:
Name of Prime Contractor (if applicable):
Prime Point of Contact Name: Email:
Offeror Performed as a (check one and list percentage of self-performance):
Prime Subcontractor Joint-Venture Partnership
% Self-Performed
Contract Amount: Original Amount $ Final Amount $
Self-Performed $
Contract Award Date:
Contract Duration (Period of Performance):
Original Completion Date:
Actual Completion Date:
Provide a short narrative on the description of the project scope and the offeror’s specific roles and responsibilities in performing the work to include the technical approach to the project:
prime contractor; it is the contracting agency or entity that administers the contract.
Project Number:
Name of Offeror:
Contract Number:
Name of Prime Contractor (if applicable):
Prime Point of Contact Name: Email:
Offeror Performed as a (check one and list percentage of self-performance):
Prime Subcontractor Joint-Venture Partnership
% Self-Performed
Contract Amount: Original Amount $ Final Amount $
Self-Performed $
Contract Award Date:
Contract Duration (Period of Performance):
prime contractor; it is the contracting agency or entity that administers the contract.
Project Number:
Name of Offeror:
Contract Number:
Name of Prime Contractor (if applicable):
Prime Point of Contact Name: Email:
Offeror Performed as a (check one and list percentage of self-performance):
Prime Subcontractor Joint-Venture Partnership
% Self-Performed
Contract Amount: Original Amount $ Final Amount $
Self-Performed $
Contract Award Date:
Contract Duration (Period of Performance):
| Name of your surety your firm: |
| Single bonding capability: |
| Aggregate bonding capability: |
| 4 Other information provided: |
| and responsibilities in performing the work to include the technical approach to the project: |
| and responsibilities in performing the work to include the technical approach to the project_2: |
| and responsibilities in performing the work to include the technical approach to the project_3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Check Box25: Off |
| Text26: |
| Text27: |
| Check Box28: Off |
| Check Box29: Off |
| Text30: |
| Date32_af_date: |
| Date33_af_date: |
| Date34_af_date: |
| Text35: |
| Text36: |
| Text37: |
| Text38: |
| Text39: |
| Text40: |
| Text41: |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Text45: |
| Text46: |
| Text47: |
| Date48_af_date: |
| Date49_af_date: |
| Date50_af_date: |
| Text51: |
| Text52: |
| Text53: |
| Text56: |
| Text57: |
| Text58: |
| Text59: |
| Text60: |
| Text61: |
| Text62: |
| Text63: |
| Check Box64: Off |
| Check Box65: Off |
| Check Box66: Off |
| Text67: |
| Text68: |
| Text69: |
| Text70: |
| Date71_af_date: |
| Text72: |
| Date73_af_date: |
| Text74: |
File details come from the government source that posted it. Updated .