This sources sought notice provides information on an upcoming federal contract opportunity for planning, design, and construction services related to an alternate taxiway project at Erbil Airbase in Iraq. The U.S. Army Corps of Engineers seeks sources capable of performing the work in two phases, with Phase 1 involving taxiway construction and Phase 2 involving taxiway and road culvert installation. Interested firms should have experience with projects valued between $5-10 million and be able to provide bonding for this project. Responses are due by May 8, 2020 and should include details on three relevant past projects using the provided forms, as well as System for Award Management and Joint Contingency Contracting System registration information. A two-phase solicitation process will begin with a request for qualifications in September 2020 and result in award by September 2020.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Market Research Questionnaire.pdf | ||
| Market Research Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT
ERBIL AIRBASE ALTERNATE TAXIWAY, ERBIL AIRBASE, IRAQ
(PLANNING, DESIGN, AND CONSTRUCTION)
Project Number: 2018-0093
NOTE: This is a Sources Sought publication ONLY. This announcement is issued solely for information and planning purposes only (i.e., market research) – it does not constitute a Request for Quote (RFQ), Invitation for Bid (IFB), or a Request for Proposal (RFP); or a promise to issue an RFQ, IFB, or RFQ in the future. This publication does not obligate the United States (US) Government to any contract award. This notice does not restrict the Government as to the ultimate acquisition approach. Responses to this publication shall be for informational purposes only. The Government will not pay for any information or administrative costs incurred in response to this publication. Submittals will not be returned to the responder.
Limit document submission to a maximum of 10 pages, one-sided (including attachments and questionnaires). Hard copies or facsimile submission will not be accepted. Cover Letters and extraneous materials (e.g., brochures, pamphlets, etc.) will not be considered. Request for a meeting or personal visits to discuss this publication is not permitted.
1. CONTRACT INFORMATION. The US Army Corps of Engineers (USACE), Transatlantic Afghanistan District is seeking capable sources for the planning, design, and construction of the Erbil Airbase Alternate Taxiway, Erbil Airbase, Iraq.
2. PROJECT SCOPE: The contractor shall be responsible for the design, material, labor, and equipment to accomplish the following two phases of this requirement:
Phase 1
This portion of the work is for the emplacement of a concrete pavement taxiway matching roughly in dimension to the USG provided concept drawings. The work consists of but is not limited to the following:
All existing conditions survey and design documents.
Geotechnical report of the existing soil characteristics and to ensure no unfavorable conditions under the proposed alternate taxiway.
Demolition, removal and disposal of an existing pump house structure.
The proper plugging and abandonment of a water well of unknown depth.
Removal of any existing piping or plumbing infrastructure that is associated with the water well.
The accommodation or potential reroute of an existing fiber optic line.
Excavation and haul of site materials as necessitated by Contractor provided design documents.
Preparation and testing of subgrade as outlined in Contractor provided design documents.
Providing engineered fill and testing as outlined in Contractor provided design documents.
Re-shape: cut, fill and contour of the area to preclude the ponding of water.
Concrete Pavement (PCC) to include all formwork, reinforcement steel, dowel bars, tie-bars, crack inducers (as necessary), saw cutting (in most cases widened joints), joint filler, backer rod, pourable sealant, airfield grade striping and visual navigation aids as outlined in the Contractor provided design documents.
Shoulder work and Safety Zone work as outlined in the Contractor provided design documents.
Provide and install a pavement subsurface drainage system along the proposed taxiway.
Prepare existing pavement with smooth saw cuts to ensure that the transition from the new taxiway to the existing pavement is smooth.
Phase 2
This phase will commence upon the completion of Phase 1.
The Contractor will cut existing taxiway (R02A) in order to emplace a culvert that will convey water to the drainage system on the western side of Erbil International Airport (EIA). The existing asphalt is between 9 inches and 10.5 inches (228.6 mm to 266.7 mm) thick. The contractor will ensure that the cut section is repaired to accommodate the same aircraft utilized in the Phase 1 design, using asphalt instead of concrete.
The service road along the west side of R02A will also need to be cut to emplace a culvert to convey the water into the existing drainage system. The service road is a gravel/asphalt road.
Properly shape and grade the surrounding terrain to ensure the tie in to surface drainage structures that enables positive drainage with minimal maintenance. The contractor will ensure that the service road is repaired once the culvert is emplaced.
The Contractor will ensure proper barricades are emplaced and coordination with base management for the closure of both the gravel road and R02A.
Pursuant to the Federal Acquisition Regulation Part 36, https://www.acquisition.gov/content/part-36-construction-and-architect-engineer-contracts, the magnitude for this project is between $5.0 million (M) and $10.0M.
3. PROPOSAL PROCEDURES: The Government anticipates soliciting the procurement using full and open competition. One solicitation will be issued for the acquisition consisting of a Request for Qualification (RFQ) during Phase One pursuant to FAR Subpart 36.3, Two-Phase Design-Build Selection Procedures; and a Request for Proposal (RFP) for Phase Two pursuant to FAR 15.101-1, Tradeoff Process.
The anticipated award date is September 2020.
4. SUBMISSION REQUIREMENTS: The Government is seeking to identify qualified sources under the anticipated North American Industry Classification System (NAICS) Code
236220 – Commercial and Institutional Building Construction, either singly or as part of a Joint- Venture. Size Standard $36.5M.
5. BONDING CAPACITY: Bonding will be required for this project. Provide the name of the surety identifying your firm’s single and aggregate bonding capability, if applicable.
In response to this sources sought, please submit the attached Market Research Questionnaire and Experience Form, along with other documents (e.g., bonding information) relative to the firm’s capabilities; and submit electronically via email no later than 8 May 2020 at 10:00 AM local (Afghanistan) time to Contract Specialist(s) Travis Specht at Travis.J.Specht@usace.army.mil and Temekka Ellis at Temekka.S.Ellis@usace.army.mil, and Contracting Officer Michael Hughes at Michael.W.Hughes@usace.army.mil.
MARKET RESEARCH QUESTIONNAIRE
W5J9JE20-PN2018-0093
Company Name:
Company Address:
Point of Contact:
Email Phone
1. If solicitation is published do you plan to submit a proposal?
Yes No
2. Provide your experience as a Prime contractor completing design and construction projects valued between $5.0 million (M) and $10.0M, in size or more – minimum of three (3) relevant projects. (See Attached Experience Form)
3. Does your firm have an active (updated) or are currently registered in the following e- Business systems?
a. Joint Contingency Contracting System (JCCS) [ https://www.jccs.gov/]:
If yes, provide JCCS Identification (ID):
b. System for Award Management (SAM) [https://sam.gov/)
If yes, provide Dun and Bradstreet (DUNS) Number: and Commercial and Government Entity (CAGE) Code:
NOTE: Your firm must have an active and completed registration in the mentioned systems prior to submission of a proposal.
4. Does your firm have experience in design and construction of the facilities and structures mentioned on this publication? If so, identify contract/project using the Experience Form provided. Ensure you your response aligns with the Project Scope mentioned in this publication.
In addition, ensure that the provided three references are contactable (e.g., phone or email).
5. Does your firm have bonding capability?
If no, will the firm have bonding capability prior to the release of this requirement’s solicitation publication (anticipated June 2020)?
6. Other information provided.
EXPERIENCE FORM
NOTE: Firms that perform as a subcontractor shall include the contracting agency or entity’s name and point of contact as well as the name of the Prime contractor. The “customer” is not the prime contractor; it is the contracting agency or entity that administers the contract.
Project Number:
Name of Offeror:
Contract Number:
Contract Title:
Location (City or Province):
Contracting Agency/Entity:
Contracting Point of Contact Name: Email:
Name of Prime Contractor (if applicable):
Prime Point of Contact Name: Email Address:
Offeror Performed as a (check one and list percentage of self-performance):
Prime Subcontractor Joint-Venture Partnership
% Self-Performed
Contract Amount: Original Amount $ Final Amount $
Self-Performed $
Contract Award Date:
Contract Duration (Period of Performance):
Original Completion Date:
Actual Completion Date:
Provide a short narrative on the description of the project scope and the offeror’s specific roles and responsibilities in performing the work to include the technical approach to the project:
prime contractor; it is the contracting agency or entity that administers the contract.
Project Number:
Name of Offeror:
Contract Number:
Name of Prime Contractor (if applicable):
Prime Point of Contact Name: Email Address:
Offeror Performed as a (check one and list percentage of self-performance):
Prime Subcontractor Joint-Venture Partnership
% Self-Performed
Contract Amount: Original Amount $ Final Amount $
Self-Performed $
Contract Award Date:
Contract Duration (Period of Performance):
prime contractor; it is the contracting agency or entity that administers the contract.
Project Number:
Name of Offeror:
Contract Number:
Name of Prime Contractor (if applicable):
Prime Point of Contact Name: Email Address:
Offeror Performed as a (check one and list percentage of self-performance):
Prime Subcontractor Joint-Venture Partnership
% Self-Performed
Contract Amount: Original Amount $ Final Amount $
Self-Performed $
Contract Award Date:
Contract Duration (Period of Performance):
File details come from the government source that posted it. Updated .