C4S SRR Platoon Level Questions (1).xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- W58RGZ-26-S-C001-0002
About this file
This file is a Questions and Answers document from a federal contract solicitation for a Platoon Level Small Uncrewed Aircraft System (SUAS). The document captures inquiries submitted by potential vendors during the Call for Solutions (C4S) phase of the Uncrewed Aircraft Systems (UAS) Marketplace Commercial Solution Opening (CSO), with responses provided by the U.S. Army government contracting officials.
Key details from the Q&A include: Lockheed Martin inquired about bidding eligibility after receiving provisional status for their Indago 4 sUAS quadrotor under the Interim Approved Product (IAP) process and was directed to follow all Platoon Level UAS C4S instructions; the government clarified that Core Operational Capabilities represent minimum acceptable capabilities as defined in the system characteristics spreadsheet. Skycutter submitted questions regarding delivery timelines and pricing transparency, with the government indicating that the earliest delivery of systems would likely occur in August 2026, and that anticipated costs per aircraft would not be made public, with pricing evaluation occurring during the submission review process. The solicitation number is W58RGZ-26-S-C001-0002, issued by the Department of the Army Materiel Command Contracting Command at Redstone Arsenal, with the stated objective of competitively acquiring innovative commercial VTOL UAS technologies while advancing Army requirements and achieving cost efficiencies in support of the Department of War's strategic objective of achieving Drone Dominance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C4S SRR Platoon Level Questions (2).xlsx | XLSX spreadsheet | |
| Platoon lvl System(Attachment2) rev1.xlsx | XLSX spreadsheet | |
| CLIK (Attachment 3).pdf | ||
| Platoon lvl System Characts (Attachment 2).xlsx | XLSX spreadsheet | |
| C4S Platoon lvl 23APR26 Final.pdf | ||
| Platoon Lvl SOO (Attachment 1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Company Name | POC | Phone | Question | USG Answer | Additional Notes | ||
| 28-Apr | Lockheed Martin | Juan R Gomez | 801.368.7492 | Lockheed has submitted our IAP and received provisional status for our Indago 4 sUAS quadrotor. Considering this fact, what do we need to do to bid on the CSO? | Yes, Please follow all instructions associated with the Platoon Level UAS C4S. | ||
| 28-Apr | Lockheed Martin | Additionally, should we understand the Core Operational Capabilities to be objective requirements? | Core Operational Capabilies are the minimum acceptable capabilites that are defined in the excel sheet (Platoon lvl system characteristics) | ||||
| 29-Apr | Skycutter | Jonathan Douglas-Smith | 44 7400338010 | jon@skycutteruas.co.uk | I was wondering if you have an idea on timescales for delivery of the UAS under this solicitation? | Earliest delivery of any amount of system will likely be AUG 2026 timeframe | |
| Skycutter | And will there be any budgetary information made public on expected price per aircraft? | Anticipated cost of a system/aircraft will not be made public. Pricing in submissions will be evaluated |
mailto:Jon@skycutteruas.co.uk
File details come from the government source that posted it. Updated .