W58RGZ24B0015 Amendment 0002 Conformed.pdf

PDF 177 KB Posted

Attached to
Apache AH-64 Pump, Submerged, Aircraft
Solicitation number
W58RGZ-24-B-0015
Issued by

About this file

This is a solicitation for an indefinite delivery indefinite quantity contract for maintenance and overhaul of the Apache AH-64 Pump, Submerged, Aircraft. The competition is open only to small businesses under NAICS code 336412 with 1500 employee size standard. Bids must come from firms registered under this NAICS code in the SBA DSBS database or will be deemed non-responsive. The awardee must also be registered in this NAICS code. The contract will have a term of five years as a firm-fixed-price IDIQ. The solicitation is being conducted using FAR Part 14 sealed bidding procedures. The award will go to the responsible bidder providing the most advantageous bid based solely on price and any price-related factors included in the solicitation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Offeror To Complete Block 12, 17, 23, 24, & 30

1. Requisition Number Page Of

2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date

7. For Solicitation Information Call:

A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time

9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:

Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program

Hubzone Small Business EDWOSB

Service-Disabled Veteran-Owned Small Business NAICS:

Email: 8(A) Size Standard:

11. Delivery For FOB Destination Unless Block Is Marked

12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating

See Schedule 14. Method Of Solicitation RFQ IFB RFP

15. Deliver To Code 16. Administered By Code

Telephone No.

17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code

Telephone No.

17b. Check If Remittance Is Different And Put Such Address In Offer

18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

(Use Reverse and/or Attach Additional Sheets As Necessary)

25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)

27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.

27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.

28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.

Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:

30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)

30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed

Authorized For Local Reproduction Previous Edition Is Not Usable

Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212

W58RGZ-24-B-0015 2023NOV28

NICOLE R. RIFFE (000)000-0000

NICOLE.R.RIFFE.CIV@ARMY.MIL

2024JAN25 01:00pm

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280 X

X 100

336412

X

X DOA1

X

SEE SCHEDULE

SEE SCHEDULE

X X

X 1

1 64 nicole.r.riffe.civ Highlight

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

32a. Quantity In Column 21 Has Been

Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________

32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative

32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative

32g. E-Mail of Authorized Government Representative

33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final

38. S/R Account No. 39. S/R Voucher Number 40. Paid By

41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)

42c. Date Rec’d (YY/MM/DD) 42d. Total Containers

Standard Form 1449 (Rev. 2/2012) Back

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED

Buyer Name: NICOLE R. RIFFE

Buyer Office Symbol/Telephone Number: CCAM-ALA/(000)000-0000

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A-1. Notice of total Small Business set-aside: competition for this action is open to all responsible firms who qualify as a small business under NAICS code 336412. and the size standard is 1500 employees. Only bidders registered as a Small Business for NAICS code

336412 in the Small Business Administrations (SBA) Dynamic Small Business Search (DSBS) website are eligible to submit a bid. If a bidder that does not have NAICS Code 336412 submits a bid, the bid will be deemed non-responsive and shall not be considered for award.

In addition, the awardee of the resultant contract must be registered with NAICS code 333412 at the time of award.

A-2. This will be a 5 year Firm-Fixed-Price (FFP), Maintenance and Overhaul (M&O), Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to far 52.216-22. This solicitation is for an Invitation For Bids (IFB) for resulting contract award to the responsible bidder whose bid, conforming to the invitation for bids, will be the most advantageous to the Government considering only price and any price-related factors included herein IAW FAR Part 14, Sealed Bidding.

A-3. The Pump, Submerged, Aircraft is not a Critical Safety Item (CSI). There is an adequate Depot Maintenance Work Requirement (DMWR):

DMWR-1-2915-350; dated 09/14/2012, Change #1

A-4. No Government Furnished Material (GFM) other than the reparables will be provided.

A-5. Access to FedMall is not authorized.

A-6. The government is only obligated to purchase the minimum quantity. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of delivery orders and not by the contract itself.

A-7. Shipping instructions will be provided in each individual delivery order.

A-8. The contractor may be requested to submit additional cost or pricing data if only one offer is received IAW DFARS Clause 252.215-

7008, Only One Offer."

A-9. The yearly estimated quantities listed herein do not commit the government to ordering that or any quantity above the minimum quantity.

System: AH-64Noun: Submerged, Pump

Input National Stock Number (NSN) & Part Number (P/N)_____________________________________________________

Input NSN: 2915-01-159-8522Input P/N: 7-211642052-9

Output NSN & P/N________________

Output NSN: 2915-01-159-8522Output P/N: 7-211642052-9

Minimum quantity: 50

Maximum quantity: 300

The maximum quantity includes 50 each reserved for Foreign Military Sales (FMS). However, if no FMS customers require this item, the

United States Army may utilize the FMS quantity.

Estimated US quantities (CLIN 0002) for ordering periods 1 thru 5 are as follows:

Ordering Period 1 - 50 Minimum

Ordering Period 2 - 50 Estimated

2 64

W58RGZ-24-B-0015 REPRINT

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Ordering Period 3 - 50 Estimated

Ordering Period 4 - 50 Estimated

Ordering Period 5 - 50 Estimated

Estimated FMS quantities (CLIN 0003) for ordering periods 1 thru 5 are as follows:

Ordering Period 1 - 10 Estimated

Ordering Period 2 - 10 Estimated

Ordering Period 3 - 10 Estimated

Ordering Period 4 - 10 Estimated

Ordering Period 5 - 10 Estimated

A-10. The minimum quantity set forth herein shall be obligated on delivery order, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the firm fixed price in effect during the ordering period in which they are ordered.

A-11. The Contractor shall furnish reusable containers in accordance with (IAW) solicitation/contract section C and MILSTD-2073-1, DOD

Standard Practice for Military Packaging and MIL-STD-129, DOD Standard Practice for Military Marking for Shipment and Storage. The contractor shall comply with MIL-STD-2073-1 and the latest version of MIL-STD-129 notwithstanding that Attachment 0001, M&O Packaging

Requirements, references merely MIL-STD-2073-1 and MIL-STD-129, with no reference to the latest versions.

A-12. All ordering periods are in increments of 12 months from the date of award.

Ordering periods are as follows:

The first ordering period is from date of contract award through 366 Days After Contract Award DACA.

The second ordering period is from 367 days after contract award through 731 DACA.

The third ordering period is from 732 days after contract award through 1096 DACA.

The fourth ordering period is from 1097 days after contract award through 1461 DACA.

The fifth ordering period is from 1462 days after contract award through 1827 DACA.

please insert your firm fixed unit price for the 1st, 2nd, 3rd, 4th, and 5th year in the spaces provided under each CLIN/SubCLIN.

Note: the offerors attention is called to the requirements for receipt of reparables which follows:

A-13. The contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for repairable on all shipments. The contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/

The contractor shall prepare this form and include the following corresponding receipt information:

A. Document Number - (Positions 30-44)

B. National Stock Number (NSN) - (Positions 8-22)

C. Condition Code - (Position 71)

D. Unit Price - (Positions 74-80)

E. Total Price - (Block 1)

F. Actual Quantity Received - (Block 10)

G. Nomenclature - (Block 17)

H. Signature and Date - (Blocks 22 and 23)

For questions with the above information, send inquiries to: "mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil "

A-14. The National Defense Authorization Act for Fiscal Year 1993, public law 102-484, section 326, prohibits use of ozone depleting chemicals in department of defense contracts awarded on or after 01 June 1993, unless appropriate authority is granted.

The following websites are provided for the purpose of obtaining/reviewing various da pamphlets and army regulations and technical manuals/bulletins:

- https://quicksearch.dla.mil/qsSearch.aspx -Technical Manuals and Bulletins

- https://armypubs.army.mil -DA Pamphlets and Army Regulations

3 64

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A-15. The Government intends to award only one contract as a result of this solicitation.

A-16. Provide Name, title, telephone numver and e-mail address of person authorized to sign the proposal. The signature of the authorized person shall be provided on page one of this form. Proposals signed by an agent shall be accompanied by evidence of that agents authority, unless that evidence has been previously furnished to the issuing office:

Name: _________________________________________________________

Title:

Telephone number: _____________________________________________

E-mail address: _______________________________________________

A-17. Technical Data can only be distributed to contractors with a current Department of Defense (DD) Form 2345, Militarily Critical

Technical Data Agreement, on file with the Defense Logistics Agency. Prospective bidders wishing to obtain access to the unclassified technical data drawings must have Joint Certification Program (JCP) certification. Instructions for obtaining JCP certification can be found at: https://www.dla.mil/Logistics-Operations/Services/JCP/

DMWR and associated Maintenance and Engineering Orders (MEO) can be obtained by contacting the AMCOM publications office via email to usarmy.redstone.amcom.list.immc-pub-epco@army.mil. Please notify the Contract Specialist, Nicole Riffe, at Nicole.r.riffe.civ@army.mil_________________________________________________ when this request is made.

Solicitation period will not be extended as a result of late requests for technical data.

A-18. The contractor shall comply with the Total Asset Visibility - contractor (TAV-C) reporting instructions IAW Attchment 02

Contractor Overhaul TAV-C Requirements and TAV-C Portal End User SOP. The contractor shall provide the completed Attachment 03 AMC AUP for TAV-C as required for Portal Access.

A-19. The Contractor is required to submit a M&O Plan in accordance with CDRL A004 and Section C Statement of Work paragraph t. titled

"Overhaul Plan Documentation." The documentation shall be submitted within 30 days after contract award.

A-20 Bids submitted on an FOB basis other than FOB Origin shall be rejected as non-responsive

A-21. A PVA is required for this effort.

*** END OF NARRATIVE A0001 ***

The purpose of Amendment 0001 to Solicitation W58RGZ-24-B-0015 is as follows:

A-1. To replace all PVA language in section E, with current PVA requirements.

A-2. To include a deadline for Drop-off requests, and a instructions for the email subject when submitting a Drop-off request in

Section L-5, paragraph B.

A-3. Update to Delivery Schedule language in Section F, to incorporate PVA language increase in days.

A-4. Updated PVA CLIN 0001AA To include 95 working days vs. 90 days.

A-5. Incorporate Attachments and exhibits listed in Section J.

*** END OF NARRATIVE A0002 ***

The purpose of this modification is to

- extend the proposal due date to 25 January 2024 at 1 P.M. Central standard time,

- update the deadline to request a DoD Safe drop off request to 24 January 2023 at 1500, and

- update the Bid Opening to 1 February 2024 at 10:AM.

All DMWR Request shall have been made prior to the original closing date of 11 January 2024.

Note: All proposals shall be sent via the DoD Safe website as instructed in Section L, proposals sent via e-mail will not be considered responsive.

4 64

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE A0003 ***

5 64

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA, PUMP, SUBMERGED AIRCRAFT

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA, PUMP, SUBMERGED AIRCRAFT

This CLIN represents the Product Verification Audit

(PVA) for the Pump, Submerged, NSN: 2915-01-159-8522, as shown in CLIN 0002AA.

This is a Firm Fixed Price CLIN.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with Section E, Product

Verification Audit (PVA) Contract Requirements.

PVA shall be conducted within 95 working days after receipt of reparables. The Contractor shall prepare

3 assets for PVA. The Contractor is required to notify the Government Quality Office for scheduling of the PVA by email to the following address:

usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil

With copy emailed to the Contract Specialist at:

nicole.r.riffe.civ@army.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.

NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:

nicole.r.riffe.civ@army.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

Failure to pass the PVA may lead to Termination for____________________________________________________

Default of the contract.________________________

Payment Instructions: The Contractor will go into_____________________

Wide Area Work Flow (WAWF) to receive payment for the

PVA. The Contractor shall use DODAAC W58RGZ when submitting the PVA invoice in WAWF, making it to the attention of Christopher Caputo. The Contracting

6 64

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Officer will approve the PVA invoice upon formal acceptance/approval of the PVA.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 PUMP, SUBMERGED, AIRCRAFT

NSN: 2915-01-159-8522

Estimated yearly quantities for CLIN 0002AA are:

Ordering Period 1: 50 each minimum qty

Ordering Period 2: 50 each estimated qty

Ordering Period 3: 50 each estimated qty

Ordering Period 4: 50 each estimated qty

Ordering Period 5: 50 each estimated qty

Funds for the ordering period 1 quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative A001)

0002AA OVERHAUL/REPAIR OF PUMP, SUBMERGED (US) $ $ _______________________________________ ______________ __________________

COMMODITY NAME: PUMP, SUBMERGED, AIRCRAFT

INPUT:

NSN: 2915-01-159-8522, P/N: 7-211642052-9

OUTPUT:

NSN: 2915-01-159-8522, P/N: 7-211642052-9

Overhaul/Repair shall be in accordance with clause in Section C entitled 'Statement of

Work/Specifications - Government Specifications'.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in

7 64

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Section C, Statement Of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

Ordering Period 1- U/P $__________ Min Qty 50 ea ________

Ordering period 2- U/P $____________Est Qty 50 ea ________

Ordering Period 3- U/P $___________ Est Qty 50 ea ________

Ordering Period 4- U/P $___________ Est Qty 50 ea ________

Ordering Period 5- U/P $___________ Est Qty 50 ea ________

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR

THIS CLIN.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE ATTACHMENT 1, M&O PACKAGING REQUIREMENTS

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

0003 PUMP, SUBMERGED, AIRCRAFT

NSN: 2915-01-159-8522

Mfr CAGE: 8V613

Mfr Part Number: 7-211642052-9

Estimated yearly quantities for CLIN 0003AA are:

Ordering Period 1: 10 estimated qty

Ordering Period 2: 10 each estimated qty

Ordering Period 3: 10 each estimated qty

Ordering Period 4: 10 each estimated qty

Ordering Period 5: 10 each estimated qty

(End of narrative A001)

8 64

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003AA OVERHAUL/REPAIR OF PUMP, SUBMERGED (FMS) $ $ ________________________________________ ______________ __________________

COMMODITY NAME: PUMP, SUBMERGED, AIRCRAFT

INPUT:

NSN: 2915-01-159-8522, P/N: 7-211642052-9

OUTPUT:

NSN: 2915-01-159-8522, P/N: 7-211642052-9

Overhaul/Repair shall be in accordance with clause in Section C entitled 'Statement of

Work/Specifications - Government

Specifications'.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in

Section C, Statement of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

Ordering Period 1- U/P $_____Est Qty 10 ea, FMS ______

Ordering Period 2- U/P $_____Est Qty 10 ea, FMS ______

Ordering Period 3- U/P $_____Est Qty 10 ea, FMS ______

Ordering Period 4- U/P $_____Est Qty 10 ea, FMS ______

Ordering Period 5- U/P $_____Est Qty 10 ea, FMS ______

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR

THIS CLIN.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

9 64

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Deliveries or Performance _________________________

FOB POINT: Origin

0004 SCRAP/ BER

0004AA SCRAP/ BEYOND ECINOMICAL REPAIR (BER) $ _____________________________________ __________________

SERVICE REQUESTED: SCRAP/ BER

This CLIN is for assets which are beyond economical repair(i.e., scrap) from CLINs 0002AA and 0003AA.

The Government's estimated quantity per ordering period is 1 each.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 - U/P $________ EACH

Ordering Period 2 - U/P $________ EACH

Ordering Period 3 - U/P $________ EACH

Ordering Period 4 - U/P $________ EACH

Ordering Period 5 - U/P $________ EACH

Scrapped assets from CLINs 0002AA and 0003AA shall be in accordance with Section C, entitled

Statement of Work Specifications - Government

Specifications.

Units determined to be scrapped in accordance with Section C shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA and 0003AA, as applicable.

In the event the Procuring Contracting Officer

(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.

The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via

10 64

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0005 SHIPPING CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: SHIPPING CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

Contractor shall furnish containers:

NSN 8145-00-301-2987, P/N: 13414-017

Thes prices apply to US and FMS reusable containers.

Offeror is required to fill in proposed firm-fixed unit price for all five ordering periods:

Ordering Period 1 $_________ EST Qty 1 ea

Ordering Period 2 $_________ EST Qty 1 ea

Ordering Period 3 $_________ EST Qty 1 ea

Ordering Period 4 $_________ EST Qty 1 ea

Ordering Period 5 $_________ EST Qty 1 ea

The Contractor shall provide containers IAW

Attachment 01, M&O Packaging Requirements and Section

C, Statement of Work.

The Government cannot determine, at this time of contract award, how many of the assets to be repaired will be received by the contractor in unserviceable containers or received without containers.

The contractor, IAW Section C, Statement of Work shall submit a Report of Discrepancy (ROD) SF Form

364, through its Government DCMA QAR for verification within 7 working days to the address shown on CDRL

A002. Assets received in unserviceable containers or without a container require approval by the PCO prior

11 64

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

to the purchase of a serviceable container.

Contractor must comply with MIL-STD-2073-1E w/change

4, DOD Standard Practice for Military Packaging and

MIL STD 129R, DOD Standard Practice for Military

Marking for Shipment and Storage, notwithstanding that the Packaging Instructions in Section J, Attachment 01 references merely 2073-1 and MIL-STD-

129, with no reference to the latest versions.

DOD packaging, regulations, standards, and specifications may be obtained online at https://quicksearch.dla.mil/qsSearch.aspx and are available to the public.

This CLIN covers containers for CLINs 0002AA and

0003AA.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMENT LIST (CDRL) _____________________________________

A001 LOGISTICS PRODUCT DATA $ ** NSP ** ______________________ __________________

SERVICE REQUESTED: LOGISTICS PRODUCT DATA

CLIN CONTRACT TYPE:

Firm Fixed Price

Within two business days after a Government QA acceptance the contractor shall submit a copy of the

Wide Area Work Flow (WAWF) receiving reports listing each Serial Number (SN) shipped via e-mail to the address listed below. A final receiving report for each Delivery Order (DO) and or contract closeout shall be via submittal to WAWF; use DODAAC W81D17 for this CLIN.

The Requiring Office will verify final accounting of all TAMMS-A data reported against the contract/DO and verify that all TAMMS-A data has been received. Any discrepancies will be identified within 5 working days after receipt and comments provided to the contractor. The contractor shall correct errors and resubmit within 10 working days after receipt of the requiring office comments.

12 64

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

The contractor shall provide data based on delivery schedules / contract requirements.

TAMMS-A submittal/approval shall be via contractor/vendors use of the TAMMS-A/MCDS web portal https://tamms-a.redstone.army.mil . If the web portal is unavailable or the contractor currently does not have a TAMMS-A/MCDS account, see the

Statement of Work, Section C for additional instructions.

Additional details can be found in Exhibit A- CDRL

A0001 Logistics Product Data.

(End of narrative B001)

Deliveries or Performance _________________________

A002 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________

DISCREPANCY $ ** NSP ** ___________ __________________

SERVICE REQUESTED: SHIPPING & PACKAGING DISC REP

CLIN CONTRACT TYPE:

Firm Fixed Price

DATA ACQUISITION DOCUMENT NUMBER : DI-MGMT-80503 (AS

REQUIRED)

Submission of the Report of Shipping and Packaging

Discrepancy shall occur within 10 days of discovering the discrepancy. Refer to Standard Form

364 located at https://www.gsa.gov/reference/forms# and Exhibit B Report of Shipping (item) and

Packaging Discrepancy for completing the Report of

Discrepancy.

(End of narrative B001)

Deliveries or Performance _________________________

A003 GOVERNMENT PROPERTY (GP) INVENTORY REPORT $ ** NSP ** _________________________________________ __________________

SERVICE REQUESTED: GP INVENTORY REPORT

CLIN CONTRACT TYPE:

Firm Fixed Price

GP Inventory report shall be submitted in accordance with Exhibit C-CDRL A0003 Government Property (GP)

13 64

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inventory Report:

Data shall be delivered to

:usarmy.redstone.amcom.mbx.alc-inventory-management@army.mil

(End of narrative B001)

Deliveries or Performance _________________________

A004 TECHNICAL REPORT - STUDY/SERVICES $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: TECH REPORT - STUDY/ SERVICE

CLIN CONTRACT TYPE:

Firm Fixed Price

As stated in Exhibit D-CDRL A0004 Technical Report -

Study/Services:

Contractor shall deliver report within 30 days after contract award.

Data shall be delivered in accordance with Exhibit D.

(End of narrative B001)

Deliveries or Performance _________________________

14 64

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Statement of Work for

NSN: 2915-01-159-8522

PRID: 2022H224 PART NUMBER: 7-211642052-9 STATUS: R

1. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data, necessary to accomplish the inspection and overhaul for the PUMP, SUBMERGED, AIRCRAFT for the AH64 (hereinafter the component) that is required to return the component to a serviceable condition sufficient to meet the standard of continued airworthiness in accordance with (IAW) Army Regulation

(AR) 70-62. Upon completion of the overhaul, the overhauled components shall be packaged IAW with this contract and shipped to the destination(s) specified in each individual delivery order.

2. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the component to the extent necessary to determine if the component is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer and shall discontinue the overhaul until given further instructions or the authorization for disposition of the component by the PCO.

3. In the event the PCO determines that certain items should be scrapped, the Contractor shall scrap such items at the fixed unit price in Section B. In IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.245-7004 Reporting, Reutilization, and

Disposal (Deviation 2022-O0006), included in this contract, the Contractor shall complete the Plant Clearance Inventory Schedule using the Plant Clearance capability of the GFP Module of the Procurement Integrated Enterprise Environment (PIEE), an electronic equivalent of the Standard Form 1428, Inventory Disposal Schedule. Users shall register for access and obtain training on the PIEE home page https://wawf.eb.mil/piee-landing . Such scrapped components shall count toward the quantities ordered and the Government can replace any components scrapped by the Contractor.

4. The Government has an adequate Depot Maintenance Work Requirement (DMWR) for this effort, DMWR-1-2915-350, Rev Date 09/14/2012, Change #1, Maintenance Engineering Orders (MEOs) E1831, E1830, AND E1829, and a Technical Data Package List.

5. Critical Safety Item (CSI): The PUMP, SUBMERGED, AIRCRAFT is not a CSI.

6. Upon receipt of the components, Contractor shall inspect containers for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Components received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved GFP procedures. Components received improperly packaged, damaged with corrosion/deterioration, or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (See section B, Contract Data Requirements List [CDRL] A002).

7. GFP Attachment: The components being provided to the Contractor are identified and tracked as GFP. The Contractor shall maintain a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) GFP in its possession IAW Federal

Acquisition Regulation (FAR) 52.245-1, and its property management system shall satisfy the requirements of this clause. The Contractor shall record the acquisition, receipt, shipment, consumption, disposal of GFP, and any transfer to another contract utilizing the GFP

Module in PIEE, https://piee.eb.mil , as required by the DFARS Procedures, Guidance, and Information (PGI) 245.103-72 Government-furnished Property Attachments to Solicitations and resultant contracts. GFP training and guidance is located at the Department of

Defense (DoD) Procurement Toolbox at https://dodprocurementtoolbox.com/ .

8. Contractor shall comply with U.S. Army Technical Manual (TM) 1-1500-345-23, Painting and Marking of Army Aircraft, or most recent version, if painting is required in the performance of this contract.

9. Contractor shall submit required data IAW the CDRL, DD Form 1423, Exhibit A - G electronically to the addresses indicated on the DD

Form(s) 1423.

10. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW the detailed instructions as specified in Section E of the solicitation and resultant contract.

11. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in

Department of the Army Pamphlet (DA PAM) 738-751 and TM 1-1500-328-23 as detailed in the attached TAMMS-A instructions. The U.S. Army

Aviation Missile Command (AMCOM) TAMMS-A Customer Support Office is reachable via email at "mailto:usarmy.redstone.amcom.mbx.g3m-snrr@army.mil ". The Contractor shall prepare TAMMS-A data IAW DI-SESS-81758A and the TAMMS-A instructions attached to the solicitation __ and resultant contract (CDRL A001).

12. Product Quality Deficiency Reports (PQDRs): When requested, the Contractor shall assist the cognizant Contract Administration Office in evaluating PQDRs and exhibits for defects reported on components overhauled under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the Contractors Quality Program. The Contractor shall utilize the Product Data Reporting and Evaluation Program

15 64

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(PDREP) to submit a PQDR at https://www.pdrep.csd.disa.mil/pdrep_files/report_tools/pqdr.htm IAW AR 702-7-1, Reporting of Product

Quality Deficiencies within the U.S. Army.

13. The items the Contractor shall overhaul are identified below:

Input NSN_________ P/N ___

2915-01-159-8522 7-211642052-9

Output NSN__________ P/N ___

2915-01-159-8522 7-211642052-9

14. The overhaul planned quantity for 5 years is Minimum 50, Maximum 300. Input will be 30 days after receipt of order. Output shall be as specified in the solicitation and resultant contract schedule. Serviceable assets shall be returned to Department of Defense Activity

Address Directory (DODAAC) W562RM, Plant 7001.

1st year qty 60 4th year qty 60

2nd year qty 60 5th year qty 60

3rd year qty 60

15. Transactional Inventory Procedures - The Contractor shall prepare the following reports:

a. The Contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for repairable on all shipments. The Contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/

The Contractor shall prepare this form and include the following corresponding receipt information:

1) Document Number - (Positions 30-44)

2) National Stock Number (NSN) - (Positions 8-22)

3) Condition Code - (Position 71)

4) Unit Price - (Positions 74-80)

5) Total Price - (Block 1)

6) Actual Quantity Received - (Block 10)

7) Nomenclature - (Block 17)

8) Signature and Date - (Blocks 22 and 23)

For questions with the above information, please contact: "mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil "

b. The Contractor shall perform an annual inventory of all GFP, including items for overhaul and any contractor-acquired property such as containers during the period of performance of this contract. This shall include any subcontractor inventories where GFP has been provided by the Government for overhaul. Contractor shall provide all results, findings, and corrective actions of any annual physical inventories to the Government IAW FAR Clause 52.245-1(f)(1)(iv), Physical Inventory. The Contractor shall prepare a physical inventory report IAW DI-MGMT-80441D (CDRL A003).

c. The Contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 03

"Contractor Overhaul TAV-C Requirements and TAV-C Portal End User Standard Operating Procedures (SOP)".

16. Foreign Military Sales (FMS): Contractor shall always segregate US quantities and FMS quantities and must keep segregated at all times in transit and in storage and shall flow down this requirement to all subcontractors.

17. The replacement cost is $7,331.95 for the component. When price of overhaul exceeds $4,765.77, a review of disposition will be made by the Government.

18. Item Unique Identification (IUID): The Contractor shall apply IUID IAW Military Standard (MIL-STD) MIL-STD-130N, AR 700-145, Item

Unique Identification, and DA PAM 700-145, IUID Procedures, DFARS 211.274-2 Policy for item unique identification, which requires in paragraph (a)(3)(i) that IUID is required regardless of value for any DoD serially managed item (reparable or nonrepairable) or subassembly, component, or part embedded within a subassembly, component, or part. All registered Unique Item Identifiers (UIIs) shall be maintained as received and any UIIs created for component received without one, shall follow any published documentation, such as

DMWRs or Maintenance Engineering Orders (MEO). In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. Maintaining a UII as received means the construction of the UII string shall not change; however, the UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or

"mailto:usarmy.redstone.amcom.mbx.immc-sim-iuid@army.mil ".

19. Shipping Containers and Shipment: Shipping Container NSN: 8145-00-301-2987, P/N: 13414-017 shall be utilized. Contractor shall

16 64

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

utilize the packaging requirements contained in Attachment 01, M&O Packaging Requirements. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor-furnished property. The method of shipment must include tracking of all packages for maintaining government property accountability and visibility. Contractor must comply with MIL-STD-2073-1E, DoD Standard Practice for Military Packaging and MIL-STD-129R, DoD Standard Practice for Military Marking for Shipment and Storage. The

Contractor shall package electronic parts susceptible to static discharge damage IAW ANSI/ESD S20.20-2021 Protection of Electrical and

Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices). If TAMMS-A is required, each individual repaired item must include a copy of all forms required by The Army Maintenance Management System Aviation (TAMMS-A).

20. Overhaul Plan Documentation: The Contractor shall provide overhaul plan documentation to include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul/Repair travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration approved documentation) that the Contractor utilized or shall utilize in the overhaul of the item. The documentation may be in contractor format. The Contractor shall provide documentation IAW DI-MISC-80508B (CDRL A004).

21. NOTE - Applicable Technical Documents: The applicable documents referenced in this Statement of Work (SOW) are listed on the

Contract Document Summary List (DSL) attached to the solicitation and resultant contract. The DSL lists the referenced documents by document ID, title, date, and category. The document versions specified on the DSL take precedence over the generic references (those without the revision letters) cited in the SOW.

*** END OF NARRATIVE C0001 ***

17 64

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

PRODUCT VERIFICATION AUDIT (PVA) CONTRACT REQUIREMENTS______________________________________________________

(a). The Contractor shall present for PVA acceptance THREE available units as specified in this contract. For facilities within the Continental United states, the Contractor shall notify the PCO at least 20 working days prior to being ready for PVA so that a date can be scheduled. For facilities outside the Continental United States, notification shall be provided at least 95 working days prior to being ready for PVA. If a test cell or other specialized equipment is required, notification of PVA readiness shall include the availability of these.

(b). The PVA requirement ensures that the Contractors processes and procedures are adequate to ensure component integrity. It does not relieve the Contractor from maintaining a quality system that will assure the item conforms to contractual requirements.

(c). The Government will designate a PVA Team Chairman who will serve as the primary point of contact for scheduling the PVA and determining the scope of the PVA process. Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. The PVA Team Chairman shall select the PVA candidate at random from the three (3) tendered candidates for acceptance to the Government. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the PVA Chairmans discretion, an alternative method may be utilized wherein the three (3) assets shall be examined at different stages of the overhaul process as evidence of compliance to requirements. If this alternate method is used, the PVA Chairman shall identify the different stages of overhaul for each asset to the

Contractor prior to the audit.

(d). The Contractor shall provide technical personnel; tooling, measuring and test equipment; work area; and clerical assistance, as required, to perform the PVA. Disassembly of overhauled items shall be performed in an area accessible only to audit personnel.

(e). At a minimum, PVA shall include:

(1). An inspection for adherence to preservation, packaging, and marking requirements prior to removal from the shipping container.

(2). A review of shop travelers; production processes, procedures, and tooling; and equipment used to maintain, overhaul, repair, or manufacture the item being audited for adequacy and conformance to contractual requirements.

(3). A verification through objective evidence that all inspection, testing, measuring, and diagnostic equipment used in the inspection/test of the PVA candidate(s) is maintained in accordance with applicable calibration standards.

(4). During and after disassembly, a 100% inspection of all physical characteristics, to include, but not limited to, any dimensions; certifications for materials, processes, and/or procedures; and any other requirements as set forth by the

Depot Maintenance Work Requirement(s) (DMWR), Maintenance Engineering Orders (MEOs), technical drawings, or other applicable specifications.

(5). Functional testing and inspection of applicable accessories and components to include subcontractor certifications for testing and inspections. Processes by subcontractors, such as shot peening, heat treating, etc., may also be audited.

(f). Upon completion of the disassembly and/or testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the Contractor shall satisfy to the PVA Team Chairman that such a defect does not exist in the other two PVA candidates prior to acceptance, and an effective corrective action has been initiated to preclude re-occurrence of the defect.

(g). If there are failures during the PVA, the Contractor shall repeat any or all tests, per Government request. If deemed in the best interests of the Government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. These actions must be coordinated with the cognizant DCMA QAR. The Government shall take action within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

18 64

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(h). The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e., changes in process sources, parts sources, or location where work is to be performed) after official PVA approval from Contracting

Officer, the contractor is required to provide notification of such changes to the PCO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.

(i). The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon receipt of the official PVA approval via the Contracting Officer. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.

(j). If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(k). Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1) Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(l). The Government may waive the requirement for PVA where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver. All waiver requests require a PVA Waiver Worksheet to be completed and submitted to the Government along with all supporting documentation. The worksheet will be provided by the PCO upon request. Submission of the waiver request to the Government does not guarantee that the waiver will be granted.

(m). At the conclusion of the PVA, the PVA Team Chairman will conduct an exit critique attended by appropriate Contractor personnel, the cognizant DCMA Quality Assurance Representative (QAR), and PVA Team members. Audit findings and corrective actions will be reviewed and any disputes resolved. The Contractor shall take immediate action to correct and preclude recurrence of all defects attributable to failure to ensure compliance with requirements.

(n). Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limits during the PVA process is not to be considered as part of the contract quantity.

*** END OF NARRATIVE E0001 ***

19 64

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.247-29 F.O.B. ORIGIN FEB/2006

2 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY MAR/2022

3 252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS SEP/2010

4 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) JAN/2023

(a) Definitions. As used in this clause--

"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.

"Concatenated unique item identifier" means

(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or

(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.

"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards

Organization (ISO)/International Electrotechnical Commission (IEC) 16022.

"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.

"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html .

"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .