Attachment 0002 - AED Requirements PRID M383 (Update)_19 Oct 2021 (003).pdf

PDF 34 KB Posted

Attached to
Overhaul/Repair of the CH-47 Control, Swashplate
Solicitation number
W58RGZ-21-B-0003
Issued by

View the file

Other files

File Type Posted
Attachment 0011 - CSI 05Oct2021.pdf PDF
W58RGZ21B0003-0004_Signed.pdf PDF
Attachment 0002 - AED Requirements_V2.pdf PDF
W58RGZ21B0003-0003_SIGNED.pdf PDF
W58RGZ-21-B-0003 Amendment 0002_SIGNED.pdf PDF
W58RGZ21B0003-0001.pdf PDF
Exhibit B - CDRL A002 - CDM Production Report.pdf PDF
Exhibit E - CDRL A005 - Government Property Inventory Report.pdf PDF
Attachment 0002 AED Requirements.pdf PDF
Exhibit F - CDRL A006 - DD Form 1348-1A.pdf PDF
Attachment 0005 - Portal Access Addendum 3.pdf PDF
Exhibit C - CDRL A003 - QDR.pdf PDF
Attachment 0003 - Contractor Repair TAV-C Requirements.docx DOCX document
Atttachment 0012 - AMCOM Regulation 702-7 19 June 2017.pdf PDF
Attachment 0010 - CH-47 Chinook Control Swashplate Pricing Template V2.xlsx XLSX spreadsheet
Exhibit A - CDRL A001 - TAMMS-A.pdf PDF
Exhibit D - CDRL A004 - ROD.pdf PDF
W58RGZ21B0003.pdf PDF
Attachment 0001 - 1348-1A Guidance.pdf PDF
Attachment 0009 Packaging Requirements.pdf PDF
Attachment 0006 - AMC AUP for TAVC-C.PDF PDF
Attachment 0007 - Report of Discrepancy Guidance.pdf PDF
Attachment 0004 - AMC_LMP_TAVC_Portal_User_Access_Procedures.pdf PDF
Exhibit G - CDRL A007 - Process Plan.pdf PDF
Attachment 0008 - MandO Plan Guidance.xlsx XLSX spreadsheet
Attachment 0011 CSI.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/19/2021

M383-01PRID 145R3551-17Part Number

1615-01-395-0006NSN CH-47System

CONTROL SWASHPLATENomenclature

YAdequate DMWR Available?

DMWR-55-1615-297DMWR ID

06/17/2011DMWR Date

1DMWR Chg #

YPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

- Fluorescent penetrant inspection is a critical characteristic. Fluorescent penetrant inspection shall be performed IAW ASTM E1417 for cracks. None allowed.

- Magnetic particle inspection is a critical characteristic. Magnetic particle inspection shall be performed IAW ASTM E1444 for cracks. None allowed.

- Eddy current inspection is a critical characteristic. Eddy current inspection shall be performed IAW DMWR criteria for cracks.

None allowed.

- Component plating amd subsequent bake is a critical characteristic and is required per the overhaul process. Contractor shall acquire proper plating facilities and/or equipment to perform the outlined procedures.

- Shot peening coverage is a critical characteristic. An AMCOM/CCDEVCOM approved source shall be utilized when shot peening is a critical process. Approved sources shall be obtained from AMCOM.

Identify Any Special Processes, Test Procedures, and/or Instructions

YCritical Safety Item?

Per coordination with Cargo Division, the following are the current airworthiness issues, new ECPs affecting CSI, concerns over reliability, durability issues that would affect the overhaul of the subject item in its current configuration:

1) Forward and Aft Swashplate Rotating Rings (114R3464-9) have been discovered with cracks. As a result, recurring Eddy Current inspections were implemented on aircraft and at overhaul. Airworthiness Impact Statement, AWIS 19-004, 9 April 2019, was issued as an update to AWIS 06-017, Revision 2, dated 23 April 2013. The new risk analysis included a revised crack growth analysis using representative load spectrums for the CH-47 and MH-47. It also takes into account the impact that process improvements, including the bearing retention flange flatness requirement, have had on reducing Eddy Current rejections at the depot.

2) CH-47 aircraft have experienced Swashplate Bearing, PN 114RS308-1/-2, failures which resulted in severe damage to the aircraft. The Swashplate Bearing lower cage "popped" from the bearing becoming entangled with the Swashplate Rotating Ring Lower Seal (PN 114RS306-6) retention (garter) spring. The spring was then ingested into the bearing, jamming the Swashplate Rotating Ring. Visual inspection requirements were implemented for the field and in August 2017, Aviation Safety Action Message, H-47-17-ASAM-07-Update 1, was issued to direct a mandatory inspection for and removal of the garter spring from the Lower Swashplate Seal of all Forward and Aft Swashplate Assemblies by 22 August 2018.

3) The Forward an Aft Controllable Swashplates are undergoing a redesign effort as part of the Improved Rotor System program which is part of the CH-47 Block II Aircraft Component Improvement Program (Block II ACIP).

Special Airworthiness Considerations

FCDD-AMA-M-Sustainment has verified the CSI/NST status through the ARISE CIM on 27 June 2019 and the NHA is CSI and Non-NST. The subcomponents are CSI and NST. Engineering testing like Fatigue, Endurance, and Interchange are not required for overhaul. Updated NHA table in ARISE database. No other changes. DEM

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

NSpecial Post-Contract Award Requirements?

YDoes QE-STD-2 Apply?

Y

Additional CSI Requirements

CSI Contains CSI Replacement Parts? YEngineering Testing Required?

The Contractor shall flow down the Critical Characteristics and QE-STD-1 to all Suppliers of CSIs.

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

01/06/1996Approved Date

M&O AED REQUIREMENTS DATA

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

10/19/2021

M383-01PRID 145R3551-17Part Number

1615-01-395-0006NSN CH-47System

C4598

D1007

D1044

D1083

D1106A

D1140B

D1163

D1225E

D1241

D1437B

D1715A

D1800

D2093

D2149

D2161

D2285

D2304

D2465

D2492

D2493

D2553A

D2642

T7611A

T7653D

T7760

See Table 2-1 Special Tools and Equipment, Table 2-2 Fabricated Tools and Equipment - Lower Seal Installation Tool and Table 2-3 Inspection and Test Equipment.

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

Special Post-Contract Award Requirements

The Prime or OEM is required to submit a Frozen Plan 30 days after contract award to Engineering Directorate (ED) and Aviation Engineering Directorate (AED). The Frozen Plan will be reviewed and require approval by ED and AED prior to government acceptance of contract deliverable assets.

Other Requirements / Comments (Part II)

The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEOs D1907, D1908, and D1909.

Other Requirements / Comments (Part III)

FCDD-AMA-M-Sustainment has re-verified the CSI/NST status through the ARISE CIM on 31 July 2019 and the NHA is CSI and Non-NST. The subcomponents are CSI and NST. Engineering testing like Fatigue, Endurance, and Interchange are not required for overhaul. No changes made. DEM

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

RStatus

Correlation Performance Study Requirements

D1006B

D1226B

D1907A D1908A D1909A

D2318B

D2582A

D2685 D2757

File details come from the government source that posted it. Updated .