TA_Industry_Day_Questions_and_Responses.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Transport CLS Services
Solicitation number
W58RGZ15R0044
Issued by

About this file

The attached questions were asked by Industry at the Fixed Wing Project Office Industry Day for the CLS Transport Aircraft effort. Please review the Government responses and if you have any questions/comments you may contact the Contracting Officer Jody Byrd via email Jody.B.Byrd.civ mail.mil.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

All Answers

No#Document from W58RGZ-15-R-0044SectionPara NumberPage #TitleIssue or ReasonQuestion or DiscussionGov POC/ActionAssigned DateRFP Revision Required Y/NGov ResponseSections to be revisedRFP Revised DateProjected Amendment number
1Draft RFPCLIN
Structure18Future Utility Aircraft(FUA)As the FUA acquisition process is ongoing how does the Government expect the contractor to price life cycle services?Will the USG provide any assumptions to use for this pricing exercise?IPT LeadNThe FUA aircraft life cycle services CLIN's are options only and not to be priced by the contractor until such time they are exercised. The Government will not provide any assumptions to use for a pricing exercise until we know the type aircraft and are ready to add them to the contract.N/A
2Draft RFPCLIN
Structure18Future Utility Aircraft(FUA)Since the outcome of the FUA acquisition process is unknown what does the Government envision covered in the mission capability volume regarding FUA life cycle services as well as how the contractor will determine material requirements, training and ground support equipment lead times?How will the USG deal with the two ongoing procurement actions that are interdependent? Will the FUA contract involve any sort of tech data or initial spares to ensure supportability of the aircraft from day one?IPT LeadNThe Government anticipates that similar life cycle services will be required for the FUA aircraft at the time the Government decides to exercise all FUA option CLIN's. The Government also plans to exercise one of the four elective improvement option CLIN's to cover any unanticipated requirements not covered by the contract. If the FUA options are exercised all applicable tech data & spares obtained by the government will be provided.N/A
3Attachment 0024L3(c)Proposal FilesUnder 3. Proposal files, ( c) is missing.Was this paragraph intentionally left blank?YSection L numbering is being revised.L
4Attachment 0024L3..(6) CLIN
StructureCLIN TableCLIN 0001Transport Fleet Life Cycle Services, Transition Phase In- BaseDoes the USG intend for the Offeror to price Travel under this FFP CLIN during transition?NSection L CLIN 0001 includes everything required to transition support services.N/A
5Attachment 0026Incentive Plan4.16Performance Incentive Evaluation requirementsPara 4.1 references table 2, but upon review it appears it should reference table 1.Please verify the correct table references are called out.NThe reference is correct, Table 2 identifies the evaluation periods during each year of performanceN/A
6Draft RFPH11132Contract Term ExtensionH-11 in the RFP lists a "Base Year Option 1" followed by "Options 2 through 6". The Performance Incentive plan. Para 7, table 1 lists "Base" and "5 Options". Section M, Item 3 indicates "6 total years".Does this mean the base year and option year 1 are the same? Please verify the Base and number of options.YSection H-11 will be revised to clarify the period of performance. There will be a base and 6 Option Periods.H
7Attachment 0024L14Proposal AssumptionsWill the Base and Options be awarded sequentially (in order) on a continuous basis?Will the government add this as an assumption?NYes they will be awarded sequentially. The base will be awarded followed by the option1 award. No the govt will not add that as an assumption. The section "Proposal assumptions" will be revised to "Proposal considerations".N/A
8PWS3.4.213Mission SupportThere is a requirement for trained and qualified aircrews. This will be at the direction of the PCO.Will the USG provide some sort of planning factor to assure we understand the level of manning required and response times?IPT Lead/BusNNo the Government will not provide any projected manning numbers for pilots.N/A
9PWS3.4.213Mission SupportThis is to be charged against CLIN 8, a no fee CLIN.Not sure why this would be under a no fee CLIN since it requires planning and performance risk is involved.NThat is correctN/A
10PWS3.4.313PilotsThere is a requirement for pilots to perform ferry flights, MTFs, FCFs and Return to Service flights.Will the USG provide some sort of planning factor to assure we understand the level of manning required and response times?IPT Lead/BusNNo the Government will not provide any projected planning factor for pilots.N/A
11PWS3.4.313PilotsThis is to be charged against CLIN 8, a no fee CLIN.Not sure why this would be under a no fee CLIN since it requires planning and performance risk is involved.NThat is correctN/A
12PWS3.818Government provided DatabasesIn order to properly provide cost, a Pre-RFP briefing about TopVue is needed to understand how the system will enable delivery of data and CDRL's.Will contractors be provided a TopVue briefing and a question and answer session prior to the formal RFP?Tech Data and WIPT LeadNThe Government will provide a concept process flow diagram for CDRL delivery via TopVue during Industry Day.N/A
13PWS3.8.112FFIT Data InputIn order to properly provide cost, a Pre-RFP briefing about FFIT is needed to understand how the system will enable Reliability Availability Maintainability (RAM) data collection.Will contractors be provided a FFIT briefing and a question and answer session prior to the formal RFP?NFFIT briefing will be provided at Industry Day.N/A
14Attachment 0024L25.2 (c)5Proposal Submission GuidelinesThe last bullet in this section states: "- 10 pages per scenario response"Does the Government consider the 10 page maximum for the scenario response to be within the total Volume I page limit of 320 pages?NYesN/A
16Attachment 0024L25.3.(d)5Proposal FilesThe third sentence of this section states:
"Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion."1. Does the Government consider the word "file" synonymous with "Volume" for the purpose of this requirement?
2. Is the required Summary Section for each volume/file excluded from applicable maximum page counts?Y1. Attachment 0024 Section L-25.3 will be revised to remove the word "File" with the word "Volume" 2. No the only exclusions from the page count are identified in Attachment 0024, Section L-25.2L
17Attachment 0024L25.3.(i).(2).(a)
.(7)8Life Cycle servicesSuggest moving requirement: "(7) Methods and manner of Diminishing Manufacturing Sources and Material Shortages (DMSMS) activities to be developed, monitored and executed." from RFP Section L-25.3.i.(2).(a), Maintenance Management Processes , to Section L- 25.3.i.(2).(b), Supply Chain Management Processes .IPT Lead / LOGNThe Government believes that the complete aircraft should be continuosely monitored for DMSMS issues by program management.N/A
18Attachment 0024L25.3.i.(2).(e)9Life Cycle servicesThe referenced paragraph states: "(e) The offeror’s sound approach and methodology for accomplishing the work requirements in response to the Life Cycle Services Subfactor Scenario (Logistics Requirements), at M-10, to meet the Government’s desired outcomes. Major emphasis should be placed on the following:". We believe the Correct Section M reference for the Scenario information should be M-11 vice M-10.Suggest changing the Section M reference for the Scenario from M-10 to M-11, Subfactor Scenario .YAttachment 0024, Section L-25.3.i (2).(e) will be revised to correct the reference to M-11L
19Attachment 0024L L25.3.iii 25.2( c)14 5Volume III - Past Performance, Proposalo Submission RequirementsSection L paragraph L-25.3.(iii) provides instructions for development of Volume III - Past Performance. The second sentence in this paragraph states: "This volume shall not exceed 25 pages plus five pages for each major subcontractor, excluding Past Performance Questionnaire Forms." Section L paragraph L-25.2.(c) identifies the maximum page count for Volume III, Past Performance as N/A. This paragraph also identifies a 25 page limit for Volume II, Cost/Price. We feel these page counts may have gotten transposed between the two volumes.What does the USG consider the Maximum page counts for Volume II - Cost/Price, and Volume III - Past Performance?YSection L will be revised to remove page limits from Volume II and Volume III will be revised to limit the number of pages to 25L
20Attachment 0024L2621MONTHLY FUNDING PROFILEThe referenced Section L Clause states: "MONTHLY FUNDING PROFILE
Offerors are required to provide a monthly funding profile for the Basic and Option year one (1) contract effort with their proposal. Upon exercise of each option year, the contractor will be required to provide a monthly funding profile for the next option year exercised."Does the USG desire offerors to include the Monthly Funding Profile for the Basic and Option Year one, within Volume II - Cost/Price , or Volume V - Solicitations, Offer and Award Documents and Certifications/Representations ?IPT Lead /PCO/ PricingNeed Pricing and PCO Input
21PWS4.521IUIDThe PWS references a FW PO IUID Plan as the basis of this requirement.Will this plan be provided so we can understand the requirement?IPT Lead / LogYThe Government will provide the FW PO IUID Plan as an attachment to the Solicitation.Get Plan from Log and provide as an attachment to the Solicitation
22Draft RFPH-15133Location and Hours of WorkWe understand the need to be flexible in manning of bed down bases. In some cases it is likely that the ability to meet mission requirements will not be covered through the use of flextime especially at the smaller sites. Without some sort of USG provided planning assumption or forecast of mission windows, risk is significantly increased for CLIN 1 pricing.Will the USG provide a planning factor for expected overtime at bed down bases, especially the smaller sites or a planning window for mission support? Alternatively an allowance could be made for Overtime to be charged back to the Government during mission surges or when mission requirements exceed the local manning.NThe Government will not provide a planning factor for expected overtime at the bed down bases.N/A
23Draft RFPH24.b136The discussion on Perfect Order Fulfillment does not line up with the factors highlighted in Appendix S. While they are close and could interpreted it would be better if the exact same terms were used to minimize any confusion.Align H-24 with Appendix S for POF make up.IPT Lead / LOGYAppendix S will be updated.PWS Appendix S
24Attachment 0026Performance Incentive Plan(PIP)Quality Safety MeasuresThe PIP references an incentive for Quality and Safety but we did not find it mentioned in the RFP whereas the Aircraft Logistics Performance Incentive is.Please clarify where this fits into the overall incentive plan.IPT LeadNThe quality and safety measures are contained within the Contract Incentive Plan Annex B.N/A
25Draft RFPH24135Aircraft Logistics Performance IncentiveThe use of a go/no-go gate for advancement to the next metric will significantly limit how this incentivizes the contractor. The incentive percentages are already subdivided in the Incentive Plan.Consider making the incentive metrics stand alone and not a go/no-go gate to advance.IPT LeadNNoN/A
26Draft RFPH24135Aircraft MC RateThe MC rate is a per aircraft rate. Does the USG intend to track each aircraft to the 80% and to earn the incentive every aircraft has to be above 80% or will this be looked at on a fleet basis? If a single aircraft is below 80% does that mean the incentive metric is not met and the process stops for that quarter?Clarify the meaning of per aircraft MC rate and how it will be used in the incentive plan. If the incentive plan becomes too onerous and difficult to administer coupled with the likelihood of a small payout we will collectively fail to improve performance.IPT LeadNYes per aircraft not fleet.
Yes one aircraft not meeting the 80% stops the process.N/A
27Attachment 0016Interior RefurbishmentNo mention of the C-26 in the attachment.Will the C-26 be added to this attachment?IPT LeadYAttachment 16 will be updated to include the C26 aircraft.Attachment 16
28
29

Industry Day Q&A 20 Oct 15

No#Issue or ReasonQuestion or DiscussionGov POC/ActionGov Response
1FFIT / CDRL VueAre there specific hardware requirements to support FFIT or CDRLVue?LOGFFIT = CAC Enabled Computer W/ System Internet Access (Slide 30 of briefing)
2Industry Day Briefing SlidesWill we be issued copies of today's slides?KOYes
3One-on-one meetings on another day requires another trip and further expenses.Why are there no one-on-one meetings scheduled with Industry Day?BUSThe Government will annonce the dates for the one-on-one's in the near future.
4Contract EligibilityCan a contractor bid and be eligible for both efforts?BUSYes
5Additional clarificationPlease confirm that title page, table of contents and other front matter (list of appendices, list of acronyms, etc.) do not count in total page count.BUSAnswered in RFP
6FFITDoes FFIT provide the capability to research discrepancies (maintenance discrepancies)?LOGYes
7FFITDoes FFIT track part number usage?LOGYes
8FFITDoes FFIT track total time a part spends on the aircraft? From Start of Contract ForwardLOGYes
9FFITDoes FFIT track total time a part spends on the aircraft? Existing parts start of contractLOGNo.
10A question was asked previously about the collective bargaining agreements (CBA) on the existing contracts(s). The Service Contract Act requires that a successor contractor comply with the CBA wages and benefits. The offerors must have the CBAs to bid the correct wages and benefits.Will the Government please post the existing CBAs to comply with the SCA requirements?KONo. Please see draft RFP
11CBAsWill library be established with copies of CBAs?KONo. POC from union to give information.
12Small BusinessAre there small business goals established for SEMA and Transport and what %?Will contact SBA and will not answer at Industry Day
13Security ClearancesWill all sub-contractors be required to have secret security clearances?KOYes. Please see DD254 attachment and PWS