Clarifications_to_Draft_RFPs_1_on_1_Sessions_2015_-SEMA_and_Transport.pdf
PDF 27 KB Posted
- Attached to
- Transport CLS Services
- Solicitation number
- W58RGZ15R0044
About this file
The Clarifications are from the One on One sessions the PEO Aviation - Fixed Wing Project Office hosted during November 16th-18th 2015 in Huntsville AL.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No# Document Section Issue or Reason Question or Discussion Gov
POC
Gov Clarification Sections to be revised
RFP Revised Date
Projected Amendment number
1 RFP; SEMA and Transport
Section J Attachments
Current Aircraft Engine Status
The Fixed Wing Project Office (FWPO) was requested to provide the status of each aircraft engine included in the SEMA and TA efforts.
PCO The total time on the engines will be provided by the FWPO. However, each Offeror is to propose a Firm Fixed Price as stated in Section B of each RFP and any service bulletin costs would be provided under the Over and Above CLIN.
Solicitation Attachment #039 “Aircraft Historical Data”.
2 RFP; SEMA and Transport
PWS Aircraft Engine Cleaning Environmental Safeguards
Army fixed wing "on aircraft" engine cleaning procedures and application of environmental safeguards.
FWPO The FWPO follows the engine OEM procedures for “on aircraft” engine cleaning and compressor wash. The FWPO will not add any further language to either RFP regarding “aftermarket” non OEM augmented environmental apparatus/process/procedure for aircraft engine cleaning and compressor wash requirements. (Note: If you need additional assistance call Mr. Gordon Bolton 256-842-7040)
None N/A
3 RFP; SEMA and Transport
Sections L&M - Section J Attachments#
Govt. Directed Small Business Goals
Small Business goal development Govt. v Offerors.
PCO The FWPO will not be adding any Small Business (SB) goals to either RFP.
The FWPO is requesting each Offeror to propose their recommended SB goals and they will be evaluated according to Section M. Section H will conform the Offerors proposed goals at contract award
Section H will conform the Offerors proposed goals at contract award
4 RFP; SEMA and Transport
Section J Attachments
CBA Aggrements Offeors request for current copies of incumnbent executed CBA aggreements.
Pco & Legal
The FWPO understands the Offeror’s desire to have the Collective Bargaining Agreement’s (CBA) included in both of the formal RFP’s. The FWPO will be including all applicable CBA’s in the formal RFP release for SEMA and TA.
Section J
5 RFP; SEMA and Transport
Sections L&M - Section J Attachments #024/025
Proposed System Engineering Management Plan
(SEMP)
Is the SEMP included in proposal volume 1 total page count?
FWPO SEMP page count will be limited to 100 pages and not included in the Volume 1 total page count.
Section L and M
6 RFP; SEMA and Transport
Section J Attachments
Current Aircraft and Major Component Status
Fixed Wing Project Office (FWPO) was requested to provide additional details of the aircraft and compnent configuration status.
FWPO Solicitation attachment # 039 will include: TTSN on airframe and total airframe cycles were applicable; TTSN on engines, propellors and landing gear componets.
Solicitation Attachment #039 “Aircraft Historical Data”.
7 RFP; SEMA and Transport
Section J Attachment #26
Performance Positive Incentive
Recommend the positive incentive entry gate not be based on individual (per aircraft) MC rate but on the Fleet MC rate.
FWPO The FWPO is reviewing the performance entry gate metric calculation and will revise it to a more suitable requirment.
Section J Attachment #26 and Section H
8 RFP; SEMA and Transport
PWS and Section J Attachments
FFIT Data Input Requirments
Offerors understanding of the FFIT database requirments to facilite development of associated labor costs.
FWPO FFIT has a limited import/export capability and does not replace the aircraft Logbooks. The FWPO will include a copy of the Governments FFIT User Guide as an attachment to the formal RFP.
Section J Attachments
9 RFP; SEMA and Transport
Section J Attachments
Aircraft Material Requirments
Fixed Wing Project Office (FWPO) was requested to provide additional details of the aircraft and compnent material requirments.
FWPO FWPO is going to review attachments #032 Historical Flight Hour Rates, #033 Historical Parts Usage Data, #039 Historical Aircraft Data, and #040 FFIT Users Guide to confirm that there is no more material that can be included in them to allow for a more accurate proposal estimate. Any revisions to the Section J attachments regarding material will be include in the formal RFP’s.
Section J Attachments
10 RFP; SEMA and Transport
Section M Past Performance v Cost/Price Factor Relative Importance
A request was made to relook the Section M relative importance of assigned factors.
Specifically, would the government consider placing Past Performace ahead of the Cost Factor?
PCO &
FWPO
The FWPO reviewed the Section M “Evaluation Factors for Award” and have decided to not move Past Performance ahead of Cost. It will remain as shown on the Draft RFP’s.
Section M
11 RFP; SEMA and Transport
PWS FAA Part 145 Requirments
Is obtaining, having, and maintaining an FAA Part 145 Repair Station a requirement for the Prime and each Sub-Contractor. It was requested that the FWPO change the language in this section to reflect "possess a
FWPO The Government has updated the SEMA PWS Para. 4.7.1 and TA PWS Para.
4.8.1 as follows: The Contractor (Prime or Subcontractor) shall possess and maintain an FAA Regulation Part 145 Repair Station with ratings applicable to the scope of services provided for the aircraft listed in Appendix C required to issue airworthiness certification (Form 8130).
PWS
Industry 1 on 1 Clarifications
File details come from the government source that posted it. Updated .