B08-W58D2M23R0001_Amendment 0001_20230810.pdf
PDF 823 KB Posted
- Attached to
- Railroad Maintenance & Repair, DMC-USAG Italy
- Solicitation number
- W58D2M23R0001
About this file
This document is an amendment to a solicitation for railroad maintenance and repair services at the Darby Military Community in Italy. The Department of the Army is seeking these services through a firm-fixed price indefinite delivery/indefinite quantity contract with a period of five years including an option to extend for six months. The contractor will be responsible for maintenance of approximately 11 kilometers of existing railroad tracks at the Supply and Maintenance Area and 4.4 kilometers at the Livorno Training Area, including tasks such as vegetation removal, rail joint maintenance, switch repair, tie replacement, welding, and ballast management. The amendment revises the statement of work, pricing terms, evaluation criteria, and provides responses to questions from interested offerors. Proposals are due by the date and time specified in the solicitation and shall include documentation of relevant experience, certifications, and pricing for the base period and option.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011880494 ES-00097-2P/EA-00199
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page 2 for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W58D2M23R0001
X 9B. DATED (SEE ITEM 11)
14-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Aug-2023
CODE
414TH CSB RCO ITALY SUBOFFICE LIVORNO
VIA AURELIA, EDIFICIO 5131
ZONA DEPOSITO
56128 TIRRENIA (PISA)
W58D2M 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W58D2M23R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
1. The purpose of this amendment is as follows:
a) To revise Block #10 of Standard Form 1442;
b) To revise the description of all contract line item (from 0001 through 0012)
c) To revise the Statement of Work (SOW) and update the date to 10 August 2023.
d) To revise Section J deleting Attachment #5 – Pricing Worksheet
e) To revise Section L – Factor I – Technical Experience
f) To revise Section M – Factor I – Technical Experience and Factor III – Price
g) To provide answers to questions raised by interested contractors.
i. QUESTION: We ask for clarification on the item "gauge arrangement" as the work necessary for the realization of this last article varies and can include both the sleepers and the rails with possible reworking or replacement of the same.
ANSWER: During annual railroad maintenance, the gauge measurements shall be checked and the final report shall include sections not in compliance and interventions necessary to resolve any anomalies (see Paragraph 4.1.13). A subsequent Task Order will be required to perform the necessary interventions to resolve any anomalies.
ii. QUESTION: During the pre-proposal conference it was discovered that a conflict between the SF1442 “Section B - Suppliers or Services and Prices” and the Attachment titled “Pricing Worksheet” existed. The attendees were informed that an amendment to correct the issued will be issued deleting the part of the “Pricing Worksheet” titled “Recapitulation.”
ANSWER: The “Pricing Worksheet” has been removed. The offeror shall enter their “unit price” for the entire five-year ordering period considering any variation due to the inflation or other unknown factors. This is a firm-fixed-price contract and price increase shall not be allowed.
SECTION A - SOLICITATION/CONTRACT FORM
The Issued By organization has changed from
414TH CSB RCO ITALY SUBOFFICE LIVORNO
VIA AURELIA, EDIFICIO 5131
ZONA DEPOSITO
56128 TIRRENIA (PISA)
to
414TH CSB RCO ITALY SUBOFFICE LIVORNO
VIA AURELIA, EDIFICIO 5131
ZONA DEPOSITO
56128 TIRRENIA (PISA)
The required performance has changed from -- Railroad Ordinary Maintenance and Repair, DMC-USAG Italy, 414th Contract Support Brigade (CSB), Regional Contracting Office-Italy (RCOI), Sub-Office Livorno. -- The
1187649923.civ Highlight magnitude of this contract is between $1,000,000 (Euro 938,100.00) and $5,000,000 (Euro 4,690,500.00) (Rate used: $1 = Euro 0.9381). This will be a Firm-Fixed Price (FFP) single award Indefinite Deliver/Indefinite Quantity (ID/IQ) contract with a Period of Performance of five years and includes an option to extend service for six months.-
- The minimum guarantee for the entire contract (base year including option) is $5,000.00 (Euro 4,195.00)(Rate used: $1 = Euro 0.9381).-- Funds will be obligated upon issuance of each task order during the period of performance. to -- Railroad Maintenance and Repair, DMC-USAG Italy, 414th Contract Support Brigade (CSB), Regional Contracting Office-Italy (RCOI), Sub-Office Livorno. -- The magnitude of this contract is between $1,000,000 (Euro 938,100.00) and $5,000,000 (Euro 4,690,500.00) (Rate used: $1 = Euro 0.9381). This will be a Firm-Fixed Price (FFP) single award Indefinite Deliver/Indefinite Quantity (ID/IQ) contract with a Period of Performance of five years and includes an option to extend service for six months.-- The minimum guarantee for the entire contract (five years including option to extend service for six months) is $5,000.00 (Euro 4,195.00)(Rate used:
$1 = Euro 0.9381).-- Funds will be obligated upon issuance of each task order during the period of performance..
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
in accordance with Para 4.1 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
To:
in accordance with Para 4.1 of Statement of Work.
CLIN 0002
in accordance with Para 4.1 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
in accordance with Para 4.1 of Statement of Work.
CLIN 0003
removal old ties, supply of new ties and disposal of the old ones) in accordance with Para 4.2 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
removal old ties, supply of new ties and disposal of the old ones) in accordance with Para 4.2 of Statement of Work.
1187649923.civ Highlight
1187649923.civ Highlight
1187649923.civ Highlight
1187649923.civ Highlight
CLIN 0004
removal old ties, supply of new ties and disposal of the old ones) in accordance with Para 4.3 of Statement of removal old ties, supply of new ties and disposal of the old ones) in accordance with Para 4.3 of Statement of Work.
CLIN 0005
(including removal old ties, supply of new ties and disposal of old ones) in accordance with Para 4.4 of Statement of
(including removal old ties, supply of new ties and disposal of old ones) in accordance with Para 4.4 of Statement of Work.
CLIN 0006
in accordance with Para 4.5 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
in accordance with Para 4.5 of Statement of Work.
CLIN 0007
in accordance with Para 4.6 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
in accordance with Para 4.6 of Statement of Work.
CLIN 0008
in accordance with Para 4.7 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
in accordance with Para 4.7 of Statement of Work.
CLIN 0009
switch machine ties in accordance with Para 4.8 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
switch machine ties in accordance with Para 4.8 of Statement of Work.
CLIN 0010
in accordance with Para 4.9 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
in accordance with Para 4.9 of Statement of Work.
CLIN 0011
barriers in accordance with Para 4.10 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
barriers in accordance with Para 4.10 of Statement of Work.
CLIN 0012
in accordance with Para 4.11 of Statement of Work.See Attachment titled "Pricing Worksheet" for pricing.
in accordance with Para 4.11 of Statement of Work.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
DEPARTMENT OF THE ARMY
DMC-USAG ITALY
APO AE 09613
PROJECT # ES-00097-2P/EA-00199-2P
STATEMENT OF WORK
RAILROAD MAINTENANCE AND REPAIR,
DMC-USAG ITALY
DATE: 10 August 2023
Part 1
SCOPE
1.1 Scope of Work. The contractor shall provide maintenance and repair of the Darby Military Community (DMC) internal railroad track in order to keep the network fully operational to support USAG Italy DMC missions.
The contractor shall furnish all the labor, equipment, material and transportation necessary to maintain and repair the existing railroad network in Supply & Maintenance Area (Depot) and LTA-ASA at DMC-USAG Italy. The Government will issue a task order to the contractor if repair and/or maintenance work is required.
1.2 Railroad Description. The Depot part of the railroad network has a total length of about 11 kilometers is made up of tracks types 50 UNI (weight 49,86 kg/ml, section 63,43 cm2) and FS 46 (weight 46,30 kg/ml, section 58,90 cm2) and wooden ties with various fastening and pre-compressed concrete ties with variable gauge until a maximum gauge extension of 20 mm. with installed #52 FS46-150/0.12 type switches. The minimum curve radius of the tracks is 100m.
The LTA-ASA part ot the railroad network has a total lenght of about 4.4 km is made up of heavy duty tracks types 60 UNI and Concrete ties with VOSSLOH anchorage system. It’s also included a swing bridge of 80 m lenght with wooden ties. On the network are installed #7 switches.
1.2.1 Materials. The contractor shall use brand new pre-compressed concrete or wooden ties when replacing damaged ties.
Part 2
APPLICABLE DOCUMENTS
2. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this SOW and are listed below.
2.1.1 Installation Access Control (AE Reg 190-16)
2.1.2 The Army Physical Security Program (AR 190-13)
2.1.3 Contractor Identification (AE Reg 27-715)
2.1.4 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)
2.1.5 D.Lgs n.81-2008 e smi: “Testo Unico Sicurezza”
2.1.6 Army Facilities Management (AR 420-1)
2.1.7 Maintenance of Trackage (TM-5-627)
2.1.8 Railroad Track Standards (TM 5-628)
2.1.9 Legge n.152/2006 e smi: “Testo Unico Ambientale”
2.1.10 Any other applicable safety and technical law and norm;
Part 3 ACRONYMS and DEFINITIONS
3. Definitions and Acronyms:
3.1 Definitions: Although not inclusive of every term used within this SOW, the following provides a list of definitions used throughout this SOW and commonly used in the acquisition field.
Contracting Officer (KO) – means a person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. Department of Defense Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, contracting officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing support personnel to assist the COR, “These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the KO as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government.
The term used in this contract refers to the prime.
Contractor-acquired property – means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract, and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Government-furnished property – means property furnished to the contractor the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Government property – means all property owned or leased by the Government. Government property includes both Government-furnished property and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Industrial Property Management Specialist (Property Administrator) – means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel;
to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Day – The number of hours per day the Contractor provides services in accordance with the contract.
Work Week – Monday through Friday, unless otherwise specified.
3.2 Acronyms: Although not inclusive of every term used within this SOW, the following provides a list of acronyms used throughout this SOW or commonly used in the acquisition field.
ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation ASA Ammunition Storage Area AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DMC Darby Military Community DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FPCON Force Protection Condition FRG Federal Republic of Germany GFP Government Furnished Property HIPAA Health Insurance Portability and Accountability Act of 1996 HQDA Headquarters, Department of the Army IA Information Awareness IACS Installation Access Control System IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer LTA Livorno Training Area
OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information POC Point of Contact SOW Statement of Work QA Quality Assurance QAP Quality Assurance Program QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR U.S. Army Europe UOM Unit of Measure
Part 4
REQUIREMENTS
4. Tasks. The Contractor shall furnish all personnel, supplies, facilities, transportation, tools, material, supervision, and other items necessary to perform maintenance and repair of the DMC internal railroad network in accordance with the current Italian and U.S. regulations and laws, including Rete Ferroviaria Italiana (RFI) requirements.
4.1 Maintenance (Depot/LTA-ASA): Annual railroad maintenance on linear and curved sections, which includes:
4.1.1 Mowing and cleaning from weeds and brambles on sections where maintenace shall be performed;
4.1.2 Disassembly, lubrification and reassembly of the joints;
4.1.3 Tightening of the connections parts;
4.1.4 Supply and installation/replacement of the missing/worn screw spikes;
4.1.5 Restoration, by cleaning and oiling, of the supports parts and existing plates;
4.1.6 General overhauling of the switches, having a tangent value 0,10, 0,12 or higher, including the replacement of connection and joint items, where necessary.
4.1.7 Supply and installation of maneuver immobilization pins where missing.
4.1.8 Levelling and earthling up with stone.
4.1.9 Support bearing lubrication.
4.1.10 Check of the maneuver boxes correct trim to ensure the perfect adherence of the switch point.
4.1.11 Marking of the maneuver boxes using the numeric sequence shown in the attached map, to unequivocally identify the switch point (number applied on the counterweight).
4.1.12 Immobilization of the last switch points of the not practicable sections to avoid the vehicles access.
4.1.13 The gauge measurements shall be checked and the final report shall include sections not in compliance and interventions necessary to resolve any anomalies.
The estimated quantity of five (5) kilometers or less shall be performed in ten (10) working days with each increment of five (5) killometers or less affording an additional ten (10) working days.
4.2 Replacement of switch ties: The contractor shall replace damaged switch ties with new ones. The estimated quantity of ten (10) each or less shall be performed in five (5) hours. Each additional quantity of ten (10) each or less will be afforded an additional five (5) hours.
4.3 Replacement of track ties: The contractor shall replace damaged track ties with new ones. The estimated quantity of ten (10) each or less shall be performed in five (5) hours. Each additional quantity of ten (10) each or less will be afforded an additional five (5) hours.
4.4 Replacement of switch machine ties: The contractor shall replace a defetive switch machine tie with a new one. The estimated quantity of one (1) each shall be performed in five (5) hours.
4.5 Reconstruction of turn out toe: The Contractor shall rebuild damaged or worn out turn out toe. The estimated quantity of one (1) each shall be performed in five (5) hours.
4.6 Painting of limit ties: The contractor shall repaint limit ties discolored by time and weather. The estimated quantity of five (5) each or less shall be performed in one (1) hour. Each additional quantity of five (5) each or less will be afforded an additional one (1) hour.
4.7 Aluminothermic welding: The contractor shall perform aluminothermic weldings to repair rail cracks. The estimated quantity of one (1) each shall be performed in four (4) hours.
4.8 Supply and installation of new rods for switch machine ties: The contractor shall furnish and install a new switch machine ties rods to replace old damaged ones. The estimated quantity of one (1) each shall be performed in eight (8) hours.
4.9 Supply and installation of safety grid: The contractor shall supply and install metal safety grids to secure the pits that are too close to the railway section. The estimated quantity of five (5) square meters or less shall be performed in fifteen (15) hours. Each additional quantity of five (5) square meters or less will be afforded an additional fifteen (15) hours.
4.10 Supply and installation of safety barriers: The contractor shall supply and install metal safety barriers to secure the pits that are too close to the railway section. The estimated quantity of five (5) linear meters or less shall be performed in ten (10) hours. Each additional quantity of five (5) linear meters or less will be afforded an additional ten (10) hours.
4.11 Supply crushed stone and repack the ballast: The contractor shall supply crushed stone and repack the ballast where necessary. The estimated quantity of ten (10) cubic meters or less shall be performed in ten (10) hours.
Each additional quantity of ten (10) cubic meters or less will be afforded an additional ten (10) hours.
4.12 Safety Laws. All work described in this SOW shall be accomplished in strict compliance with the Italian and US Safety Laws.
4.13 Work Phasing.
4.13.1 Work schedule. Whenever the nature of the contract and the work location are such that the work is to be performed in an area assigned to activities and service that cannot be interrupted, work shall be scheduled with concurrence of COR.
4.13.2 Work site protection. The Contractor shall maintain work site signs, obstructions, night lights and any other item necessary to prevent access of unauthorized personnel to the job site and avoid injury to persons.
4.13.3 Utilities cut-offs. Power and other utilities shall not be interrupted without prior approval of the Contracting Officer submitted through the Contracting Officer Representative. All temporary connections necessary to ensure continuous power distribution shall be provided by Contractor. If cut-offs are necessary, the contractor shall not exceed the period of time needed to make the temporary connections. Cut-off shall be scheduled with the COR no less than seven days ahead of time.
4.13.4 Alarm, telephone and television systems. De-energizing of alarm, telephone and television systems is strictly prohibited. Should these items, which may not appear on the drawing, interfere with the contract work, they shall be temporarily diverted and fed by means of temporary connections to be adequately protected. Temporary connections shall be installed by the contractor at no cost to the US Government.
4.13.5 Storage and Work Site. Material necessary to perform the contract work may be placed inside an area, provided by COR, which shall be fenced at Contractor’s care and expense. The work site shall be cleaned, cleared from any items and it shall be left in order at the end of each working day.
4.14 Damages. The Contractor shall repair any US Government real estate or property damaged by the Contractor during the course of work at no cost to the US Government prior to the contract expiration date. The damaged property shall be rehabilitated and restored to its condition prior to the damage. To avoid onerous restoration, Contractor, before starting excavation or demolition work, shall obtain from the COR sufficient information through verbal explanation, survey or drawings, as required, to locate any invisible structure or utility line existing in the work site.
4.15 Supply of water and electric power. The US Government will make available to the Contractor from existing outlets all reasonably required amounts of water and electric power, at no cost to the Contractor. Locations and types of necessary temporary connections and service lines, which shall be at Contractor's responsibility, will be subjected to the preliminary approval of the COR. The time, hour and maximum length of water or electric power outage periods required to make or remove temporary connections, as well as any other utility service interruption necessary during the work course, shall be scheduled ahead of time with concurrence of COR.
4.16 Storage of materials and cleaning. Materials available, shelters, tools and equipment shall be arranged in the building yard assigned by the COR. Rubble, debris, plants, surplus. and salvage material that in the opinion of the Contracting Officer are no longer needed on the work site, shall be promptly removed and dumped in the designated area. Following the necessary technical inspections, no final contract payment (per Task Order) will be authorized until the work area is thoroughly clean and clear. - ADDED
4.17 Quality of work. The Contractor work shall be performed in accordance with the drawings and SOW. The Contractor shall submit to the Contracting Officer (KO) through the Contracting Officer Representative (COR) the name of Project Manager and the qualified and registered technician. The contractor shall notify the KO through the COR of any unforeseen condition found during work execution along with the proposal of adequate solutions.
4.18 Daily Report. At the end of each working day, the Contractor shall prepare a signed report of work performed for each category, concerned quantity, section involved and the schedule for the next working day. The contractor shall provide an electronic PDF format of the signed report to the Contracting Officer (KO) through the Contracting Officer Representative (COR).
4.19 Switches Report. At the end of the maintenance, for each switch of the network, the contractor shall prepare a report with the measurements taken during the maintenance operation. The contractor shall provide an electronic PDF format of the signed report to the Contracting Officer (KO) through the Contracting Officer Representative
(COR).
4.20 Completion of Work. The contractor shall provide a signed report of the performed work, the accomplished checks and the eliminated deficiencies on the concerned part of the track. At the end of contract work, the Contractor shall release a proper certification, signed by a qualified and registered technician, which state the correct execution of the work in accordance with the current regulations and laws, including Rete Ferroviaria Italiana (RFI) requirements, and the safe use of the concerned part of track. The report and the certification shall be both italian and english language. For the old removed ties, a certificate of their correct disposal shall be provided. The contractor shall provide an electronic PDF format of the signed reports to the Contracting Officer (KO) through the Contracting Officer Representative (COR).
Part 5
OTHER REQUIREMENTS
5.1 Anti-Terrorism (AT) Level I Training. All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 calendar days after contract award date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees.
The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the KO, if a COR is not assigned) within 10 calendar days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil.
Contractor personnel shall complete refresher training every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies. If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 10 calendar days after completion of the training.
5.2 Access and General Protection/Security Policy and Procedures. The contractor and all associated subcontractor employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policy and procedures (provided by Government representative). The contractor shall also provide all information required for background checks to meet installation-access requirements to be accomplished by the installation provost marshal office, director of emergency services, or security office. The contractor workforce shall comply with all personal identity verification requirements as directed by DoD, HQDA, and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
5.3 iWATCH Training. The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days after the contract is awarded and within 10 calendar days after new employees commence contract performance, with the results reported to the COR within 10 calendar days after the contract is awarded and within 10 calendar days after new employees commence contract performance. Verification of the training shall be provided to the COR 10 calendar days after completion of the training. Training slides can be found on the Army OneSource we site:
https://www.dvidshub.net/video/583923/iwatch-2018
5.4 OPSEC (Operation Security) Training. All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 10 calendar days of employment under this contract after contract award date. Verification of the training shall be provided to the COR within 10 calendar days after completion of the training.
OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months. Verification of the training shall be provided to the COR within 10 calendar days after completion of the training. If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within 10 calendar days after completion of the training.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J
The following documents are hereby attached and made part of the solicitation:
Attachment #1 – Railroad Map consisting of 1 sheet undated
Attachment #2 – Antimafia Communication
Attachment #3 – Standard Operating Procedure (Italian and English language) dated 05 October 2020
Attachment #4 – Hazardous General List (Italian and English language) dated July 2008
Attachment #5 – Pricing Worksheet - DELETED
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
SECTION L
A. Each offeror shall provide a lump sum price in Euro currency and without IVA tax for all contract line item(s) in the bid schedule.
B. An authorized official of the firm shall sign:
The SF 1442
C. To be awarded a government contract you MUST:
1. Have a Unique Entity ID number https://sam.gov/content/duns-uei
2. Have a NCAGE number https://eportal.nspa.nato.int/Codification/CageTool/home
3. To be registered in the System for Award Management (SAM) website https://sam.gov/content/home
D. Question & Answer / Requests for Information (RFIs). All prospective Offerors are highly encouraged to ask questions regarding this solicitation by e-mail to Sonia.zanobini2.ln@army.mil & ryan.d.bueno2.civ@army.mil within 12 calendar days after issuance of the Request for Proposal (RFP) as specified in SF1442, Block 3 Page 1. Answers to questions will be posted to https://sam.gov/.
E. Site visit information: See FAR Clause 52.236-27 Alt I.
F. Joint Venture: It is NOT allowed.
G. Submitting the Proposal: The offeror shall submit electronic copy of the proposal via email with the subject line “W58D2M23R0001 Railroad Maintenance and Repair, DMC-USAG Italy” to the following point of contact:
Ms. Sonia Zanobini at sonia.zanobini2.ln@army.mil and Mr. Ryan D. Bueno at ryan.d.bueno2.civ@army.mil.
Proposal package must be received no later than the closing date and time listed on the solicitation SF1442, Page 1, Block 13 (A), "local time" Rome, Italy. E-mail submissions shall be sent to both of the above email addresses.
Contact the POCs via telephone if you would like to confirm your submission was received.
I. DOCUMENTATION REQUIRED FOR THE EVALUATION
1. Failure to address all the mandatory requirements may cause the proposal to be disqualified from further consideration.
2. The offeror is responsible for submitting a well-written proposal, with adequately detailed information, which clearly demonstrates compliance with the solicitation requirements.
FACTOR I - TECHNICAL EXPERIENCE
The offeror shall demonstrate recent and relevant experience in Railroad Maintenance and Repair. The offeror shall submit no less than three but no more than five projects with at least €93,810.00 ($100,000.00) in value performed within the last five years from the solicitation issued date specified in SF1442 Block 3, Page 1 for evaluation. The projects should clearly demonstrate the vendor’s capacity and ability to meet the requirement of the Statement of Work, Part 4.1, 4.2 or 4.3. Each project proposed for evaluation shall not exceed 3 pages in total length and be no less than 10 point font in text size.
FACTOR II - CERTIFICATION
The Offeror shall provide Company Certification Organism or Società Organismo di Attestazione (SOA) Qualification SOA OS29, Classification III (or higher) or SOA OG3, Classification IV “in corso di validita' certificante la qualificazione per prestazione, progettazione e costruzione” (or higher). Subcontracting is allowed up to 85% of the work. However, prime contractor must possess the required SOA. The name of the prime contractor shall be indicated in the SOA.
FACTOR III - PRICE
Offerors are required to complete the unit price and the amount of each line item in Section B – Supplies or Services and Prices.
II. DOCUMENTATION REQUIRED FOR THE DETERMINATION OF RESPONSIBILITY
The U.S. Government requires the offeror to submit the following documentation/certification to be satisfied that a prospective contractor currently meets the applicable standards in Federal Acquisition Regulation 9.104 – Standards
A. ANTI-MAFIA REQUIREMENTS: The certification of Anti-Mafia requirements shall be completed (See Section J).
B. DOCUMENTO UNICO DI REGOLARITA CONTRIBUTIVA (DURC): The offeror shall provide with the proposal a copy certified and NOT older than ninety (90) days at the time set forth for the receipt of the offer of the DURC. (Documento Unico di Regolarita Contributiva). Self-certifications are allowed. However, if the offeror has submitted a certified DURC to the issuing office (RCO Sub Office Livorno) within 90 days from the due date of this proposal, then the offeror may submit a copy of the previously certified DURC. The document MUST include the following statement otherwise the proposal will be rejected. “Con il presente documento si dichiara che l’impresa RISULTA REGOLARE ai fini del DURC”.
C. CERTIFICATE OF THE CHAMBER OF COMMERCE (CERTIFICATO DI ISCRIZIONE ALLA CAMERA
DI COMMERCIO)(ORDINARIO): The offeror shall provide with the proposal a copy certified and NOT older than two (2) months at the time set forth for the receipt of the offer of the Chamber of Commerce Certificate of Membership (Certificato di Iscrizione alla Camera di Commercio). Self-certifications are allowed. However, if the offeror has submitted a certified Chamber of Commerce Certificate of Membership to the issuing office (RCO Sub Office Livorno) within 90 days from the due date of this proposal, then the offeror may submit a copy of the previously certified Chamber of Commerce Certificate of Membership. The certificate must include the following statement otherwise the proposal will be rejected. "NULLA OSTA ai fini dell’articolo 10 della Legge 31 Maggio
1965, n. 575 e successive modificazioni. La presente certificazione e’ emessa dalla C.C.I.A.A. utilizzando il collegamento telematico con il sistema informativo utilizzato dalla Prefettura di Roma.
D. EXTRACT OF THE REGISTRATION BOOK (ISTITUZIONE DEL LIBRO UNICO): The offeror shall provide with the proposal a copy or a photocopy of the Extract Registration Book (ISTITUZIONE DEL LIBRO UNICO) listing the employees presently employed by the offeror.
E. BANK REFERENCE: The offeror shall provide a bank reference that discusses whether or not the offeror has an adequate financial resource to successfully complete the resultant contract.
F. PROFESSIONAL TECHNICAL CAPABILITY IN ACCORDANCE WITH DLGS NO. 81/2008
ATTACHMENT XVII (SAFETY LAW). In order to verify compliance with the Italian DLGS No. 81/2008, Enclosure XVII (Safety Law), the offeror shall provide the below required documentation/certification. If the offeror has submitted the below information to the issuing office (RCO Sub Office Livorno) within 90 days from the due date of this proposal, then the offeror may reference that submission instead of submitting duplicate information. In its proposal, the offeror must reference the request for proposal number for which the information was previously submitted.
1. Photocopy of the Chamber of commerce, industry or craftsmanship certificate showing the company’s business trade related to the typology of the contract;
2. Evaluation of risks document as in Art. 17, Para. 1, Sub-Para. a), or self-certification as in Art. 29, Para. 5, of the same DLGS;
3. Specific documentation showing that machinery, equipment and provisional clauses are in conformance with what required by the DLGS;
4. List/s of individual safety/protective equipment issued to employees;
5. Appointment of a safety manager responsible for the implementation of preventive and protective safety measures; of the individuals responsible for the fire prevention and fire-fighting measures, the evacuation procedures, for the management of emergencies, and qualified medical physician (doctor) when required;
6. Name/s of the employee’s safety representative/s;
7. Qualification certificates of the above mentioned individuals and employees as prescribed by the DLGS;
8. List of employees as they appear in the offeror’s Istituzione del Libro Unico and relative health records attesting they are medically fit, as required by the DLGS;
9. Photocopy of the record of social security contributions (DURC), as prescribed in D.M. 24 Oct 2007; and
10. Statement that no interim orders, negative administrative provisions or suspensions exists as specified in the Art. 14 of the DLGS no. 81/2008
SECTION M - EVALUATION FACTORS FOR AWARD
SECTION M
BASIS OF AWARD
A. The award will be made to the lowest priced technically acceptable proposal. Proposals will be evaluated for technical acceptability but will not be ranked using the non-price Factors. In order for an Offeror to be considered for award, the proposal must receive an "Acceptable" rating in every non-price Factor. A proposal receiving a rating of "Unacceptability" in any non-price Factor will not be eligible for award.
B. FACTORS
The solicitation provides for the followings:
Factor I – Technical Experience Factor II – Certification Factor III – Price
C. EVALUATION OF THE NON-PRICE FACTORS
Phase One. The Contract Specialist will screen each proposal for completeness to ensure that all mandatory requirements for this solicitation have been addressed. This level of evaluation does not include an in-depth reading of the proposal’s content, but it is conducted solely to ensure that a complete proposal has been received and that meets the requirements of the solicitation. Failure to address all the mandatory requirements may be grounds to disqualify the proposal from further review.
Phase Two. In this phase, the evaluation team evaluates the technical factor.
FACTOR I – TECHNICAL EXPERIENCE
The Government will evaluate the information concerning three recent and relevant projects provided by the offeror. If more than three projects are submitted, the government at its discretion determine which three are evaluated. The government has broad discretion in determining the relevance of the offeror’s submission. Recent and relevant projects means projects similar or greater in scope and complexity to the tasks identified in the Statement of Work, Part 4.1, 4.2 or 4.3 for Railroad Maintenance and Repair with at least €93,810.00 ($100,000.00) in value performed within the last five years from the solicitation issued date specified in SF1442 Block 3, Page 1.
The technical factor will be rated on an acceptable/unacceptable basis using the following ratings:
Acceptable The proposal clearly meets the minimum requirements of the solicitation is considered the following: The offeror provided three recent and relevant experience related to “Railroad Maintenance & Repair.”
Unacceptable The proposal does not clearly meet the minimum requirements of the solicitation is considered the following: The offeror failed to provide three recent and relevant experience related to “Railroad Maintenance & Repair.”
FACTOR II -- CERTIFICATION
The Offeror shall demonstrated to be in possession of the Company Certification Organism or Società Organismo di Attestazione (SOA) Qualification SOA OS29, Classification III (or higher) or SOA OG3, Classification IV “in corso di validita' certificante la qualificazione per prestazione, progettazione e costruzione” (or higher).
Subcontracting is allowed up to 85%. However, prime contractor must possess the required SOA. The name of the prime contractor shall be indicated in the SOA.
Acceptable The Offeror provided all required certifications.
Unacceptable The Offeror failed to provide all required certifications.
FACTOR III - PRICE
1. The price structure will consist of Quantity multiplied by Unit Price equaling Total Line Item Price. An assessment of the reasonableness of each proposed price will be made. The Contracting Officer will perform a price analysis of each proposal found to be acceptable.
2. Offerors are required to price the ALL Contract Line Item Numbers (CLINS). Should the Government determine proposed prices are unrealistically low (an indication of “buy-in”), this will be considered a performance risk and may be deemed ineligible for contract award.
3. Total Evaluation Price. The total prices indicated at CLINS 0001 through 0012 will be evaluated for fair and reasonableness and for unbalanced pricing. Unrealistic, unbalanced or unreasonable pricing may cause a proposal to be determined unacceptable. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
4. For purposes of evaluating the total quoted price, the Contracting Officer will add the total line item costs for CLINS 0001 through 0012 in Euros (in accordance with the currency indicated in the proposal), plus the total value of the option to extend services under FAR 52.217-8 to derive the total evaluated price. For the purposes of calculating the total price under FAR 52.217-8, the Contracting Officer will evaluate the price in accordance with quantities indicated in the table below.
6 Month Extension FAR 52.217-8
CLIN Description Unit Quantity
0001 Railroad Maintenance (Depot) in accordance with Para 4.1 of the Statement of Work EA 1
0002 Railroad Maintenance (LTA-ASA) in accordance with Para 4.1 of the Statement of Work EA 1
Replacement of switch ties (including removal old ties, supply of new ties and disposal of the old ones) in accordance with Para 4.2 of the Statement of Work
EA 75
Replacment of track ties (including removal old ties, supply of new ties and disposal of the old ones) in accordance with Para 4.3 of the Statement of Work
EA 100
Replacement of switch machine ties (including removal old ties, supply of new ties and disposal of the old ones) in accordance with Para 4.4 of the Statement of Work
EA 1
0006 Reconstruction of turnout toe in accordance with Para 4.5 of the Statement of Work EA 1
0007 Painting of limit ties in accordance with Para 4.6 of the Statement of Work EA 5
0008 Aluminothermic welding in accordance with Para 4.7 of the Statement of Work EA 1
Supply and installation of new rods for switch machine ties in accordance with Para 4.8 of the Statement of Work
EA 1
0010 Supply and installation of safety grids in accordance with Para 4.9 of the Statement of Work Square Meter
0011 Supply and installation of safety barriers in accordance with Para 4.10 of the Statement of Work Linear Meter
0012 Supply crushed stone and repack ballast in accordance with Para 4.11 of the Statement of Work Cubic Meter
(End of Summary of Changes)