Scale Scala not in scale Process phases of the treatment plant - scheme Processo dell'impianto di depurazione - schema
WASTE WATER
FROM ABOVE GROUND LIFT STATION
Acque nere dalle stazioni di pompaggio
SCREENING
Analisi
WASTE WATER
FROM ABOVE GROUND LIFT STATION
Acque nere dalle stazioni di pompaggio
WASTE WATER
FROM ABOVE GROUND LIFT STATION
Acque nere dalle stazioni di pompaggio
EQUALIZATION
Equalizzazione
BIOLOGICAL OXIDATION
Ossidazione biologica
BIOLOGICAL OXIDATION
Ossidazione biologica
BIOLOGICAL SEDIMENTATION
Sedimentazione biologica
BIOLOGICAL SEDIMENTATION
Sedimentazione biologica
DISINFECTION
Disinfezioni
FINAL OUTLET
Espulsione
BIOLOGICAL OXIDATION
Ossidazione biologica
BIOLOGICAL SEDIMENTATION
Sedimentazione biologica
DRYING BEDS
Essicazione fanghi
WATER INLET METER
Contatore acqua in ingresso
WATER OUTLET METER
Contatore acqua in uscita
WASTE WATER LINE
CLEAN WATER LINE
SLUDGE LINE
NUMERO DISEGNO
drawing number
STATO DEL PROGETTO
project phase
TITOLO FOGLIO
sheet title
N on è p er m es so c on se gn ar e a te rz i o ri pr od ur re q ue st o do cu m en to nè u til iz za rn e il co nt en ut o o re nd er lo c om un qu e no to a te rz i s en za la n os tra a ut or iz za zi on e es pl ic ita
O gn i i nf ra zi on e co m po rta il ris ar ci m en to d ei d an ni s ub iti
E' fa tta ri se rv a di tu tti i di rit ti de riv an ti ar t.8
L eg ge d el
2/ 3/
;a rtt
.9 e
Le gg e de l 2 2/
2/
COMMITTENTE
owner
UBICAZIONE IMPIANTO
site location
TITOLO DEL PROGETTO
project title
FOGLIO NR. DI
sheet of
NR.PROGETTO
project no.
SCALA
scale
DATA
date
NR.REVISIONE DATA REVISIONE
revision No. revision date
PRELIMINARE
DEFINITIVO
ESECUTIVO
COSTRUTTIVO
preliminary 35% pre-final 90% working 100% construction (as built)
Li ce nz a
Au to ca d
LT
s/ n
2-
35% rev.01 Feb. 13th, 2020
U.S. ARMY ENGINEERING &
SUPPORT CENTER
4820 UNIVERSITY DRIVE
HUNTSVILLE, AL 35816-1822
LEGHORN DEPOT AREA
LIVORNO
ITALY
DDC UPGRADES AND UMCS
INTEGRATION EXISTING
SIEMENS DESIGO
WATER AND WASTE WATER
W912DY-16-D-0001
DESIGN
July, 29th 2020
90% rev.00 June 10th, 2020
PROCESS PHASES OF THE
WASTE WATER TREATMENT
PLANT
- Electrical and mechanical plant
... @A3
W05
9 8
PROCESS LINE N° 3
LINEA DI TRATTAMENTO N° 3
PROCESS LINE N° 2
LINEA DI TRATTAMENTO N° 2
PROCESS LINE N° 1
LINEA DI TRATTAMENTO N° 1
4A
EDIFICIO CONTROLLO
CONTROL BUILDING
BAGNO
TOILET
PRELIMINARE
DEFINITIVO
ESECUTIVO
COSTRUTTIVO
preliminary 35% pre-final 90% working 100% construction (as built)
NUMERO DISEGNO
drawing number
STATO DEL PROGETTO
project phase
TITOLO FOGLIO
sheet title
COMMITTENTE
owner
UBICAZIONE IMPIANTO
site location
TITOLO DEL PROGETTO
project title
FOGLIO NR. DI
sheet of
NR.PROGETTO
project no.
SCALA
scale
DATA
date
NR.REVISIONE DATA REVISIONE
revision No. revision date
N on è p er m es so c on se gn ar e a te rz i o ri pr od ur re q ue st o do cu m en to nè u til iz za rn e il co nt en ut o o re nd er lo c om un qu e no to a te rz i s en za la n os tra a ut or iz za zi on e es pl ic ita
O gn i i nf ra zi on e co m po rta il ris ar ci m en to d ei d an ni s ub iti
E' fa tta ri se rv a di tu tti i di rit ti de riv an ti ar t.8
L eg ge d el
2/ 3/
;a rtt
.9 e
Le gg e de l 2 2/
2/
U.S. ARMY ENGINEERING &
SUPPORT CENTER
4820 UNIVERSITY DRIVE
HUNTSVILLE, AL 35816-1822
July, 29th 2020
LEGHORN DEPOT AREA
LIVORNO
ITALY
DDC UPGRADES AND UMCS
INTEGRATION EXISTING
SIEMENS DESIGO
WATER AND WASTE WATER
W912DY-16-D-0001
DESIGN
W06 June 10th, 202090% rev.00 Feb. 13th, 202035% rev.01
WASTE WATER TREATMENT
PLANT DISTRIBUTION
DESIGN - Electrical and mechanical plant
VASCA DI POLIMERO
POLYMER TANK
PIT FOR SLUDGE ACCUMULATION already detached POZZETTO ACCUMULO FANGH già staccato
POZZETTO CON POMPA già staccato PUMP PIT already detached
PIT WITH VALVES
POZZETTO CON VALVOLE
5 VASCA ISPESSIMENTO FANGHI PARANCO
PIT WITH FLOW METER
DEPHOSPHATING TANK (2000 LITERS)
SERBATOIO PER DEFOSFATAZIONE
MANHOLE
POZZETTO
CHLORINE TANKS
SERBATOI CLORO
CENTRIFUGA
CENTRIFUGE
HOIST
VASCA DI CLORAZIONE
CHLORINATION TANK
SLUDGE THICKENING TANK
SEDIMENTATION TANK
VASCA DI SEDIMENTAZIONE
LIFTING TANK FOR EMERGENCY1A
INFLUENT PUMP STATION AND SAMPLING
VASCA DI SOLLEVAMENTO E CAMPIONATURA
VASCA DI SOLLEVAMENTO IN EMERGENZA
4A CHLORINATION TANK, ONLY FOR EMERGENCY
VASCA DI CLORAZIONE DI EMERGENZA
MANHOLE
POZZETTO
EFFLUENT PUMP STATION AND SAMPLING
STAZIONE DI POMPAGGIO EFFLUENTE E
CAMPIONATURA
VASCA PER ANALISI LIQUAMI
SLUDGE TESTING TANK
POZZETTO DEVIATORE DI FLUSSO
FLOW DEVIATION PIT
SEDIMENTATION PIT FOR OIL SEPARATOR
POZZETTO DI SEDIMENTAZIONE PER IL
SEPARATORE OLIO
VASCA DI EQUALIZZAZIONE
EQUALIZATION BASIN28
29 WET WELL AND PUMPING SYSTEM
VASCA CON POMPE SOMMERSE
ELENCO DELLE STRUTTURE
LIST OF STRUCTURES
STAZIONE DI SOLLEVAMENTO31
30 DRYING BEDS
LETTI DI ESSICCAMENTO
LIFT STATION
EXISTING
ESISTENTE
11 ELECTRICAL PIT
POZZETTO ELETTRICO
OXIDATION TANK
VASCA DI OSSIDAZIONE2 PIT WITH PUMP AND VALVES
POZZETTO CON POMPA E VALVOLE14
12 ELECTRICAL SUBSTATION
SOTTOSTAZIONE ELETTRICA
13 PAD FOR STORAGE OF DRIED SLUDGE
PEDANA STOCCAGGIO FANGHI ESSICCATI
DRAINAGE TRENCH
CANALETTA DI DRENAGGIO15
CATCH BASIN
POZZETTO DI RACCOLTA16
POZZETTO CON MISURATORE DI PORTATA
VASCA DISSABBIATRICE
SAND TRAP TANK24
POMPA SOMMERSA
SUBMERSIBLE PUMP
ELENCO DELLE APPARECCHIATURELIST OF EQUIPMENT/
EXISTING
ESISTENTE
MISURATORE DI PORTATA
FLOW METER13
SGRIGLIATORE
BAR SCREEN14
ANALIZZATORE LIQUAME
SLUDGE TESTER15
VALVOLE DEVIATRICI DI FLUSSO
FLOW DEVIATION GATES16
SEPARATORE DI OLIO
OIL SEPARATOR17
AGITATORE
MIXER18
SOFFIANTE
BLOWER19
MISURATORE DI FLUSSO ARIA
AIR FLOW METER20
POMPA PER CLORAZIONE
PUMP FOR CHLORINATION3
POMPA PER DEFOSFATAZIONE smontata PUMP FOR DEPHOSPHATION dismanteled5
POMPA DI RICIRCOLO
RECIRCULATION PUMP6
AREATORE (TIPO SOMMERSO)
AERATOR (SUBMERSIBLE TYPE)7
CENTRIFUGA
CENTRIFUGE8
POMPA MONOVITE
MONO PUMP9
ELEVATORE A COCLEA
CONVEYOR11
POMPA SOMMERSA
SUBMERSIBLE PUMP
POMPA SOMMERSA
SUBMERSIBLE PUMP
POMPA MONOVITE
MONO PUMP
POMPA SOMMERSA
SUBMERSIBLE PUMP
POMPE SOMMERSE
SUBMERSIBLE PUMPS
N.I.C.
22 POMPE SOMMERSE
SUBMERSIBLE PUMPS
EXISTING
ESISTENTE
LINEA FANGHI DI SUPERO
SLUDGE RETURN LINE
LINEA PER RIIMMISSIONE
CHLORINATION LINE
LINEA DI CLORAZIONE
SUPERNATANTE
LIQUAME PARZIALMENTE TRATTATO
TUBI PER TRASFERIMENTO DI
TRANSFER PIPING OF PARTIALLY
FORCED SANITARY SEWER
LINEA FORZATA DI FOGNATURA
LINEA DI CARICO DELLA VASCA
OXIDATION TANK LOADING LINE
SLUDGE RECYCLE LINE
LINEA RICIRCOLO FANGHI
EXCESS SLUDGE LINE
TREATED SEWAGE
DI OSSIDAZIONE
(LIQUAME GREZZO)
(RAW SEWAGE)
LINEA DI FOGNATURA A GRAVITA'
GRAVITY SANITARY SEWER
LEGENDALEGEND /
DESCRIPTION
DESCRIZIONE
FILTRATE RECYCLE LINE
LINEA RICIRCOLO FILTRATO
EXISTING
ESISTENTE
SLUDGE DEPHOSPHATING LINE
LINEA DEFOSFATAZIONE LIQUAMI
TANK DRAINAGE LINE
LINEA DI SCARICO VASCA
TREATMENT PLANT EFFLUENT
LINEA DI SCARICO DELL' IMPIANTO
STABILIZED SLUDGE LINE
LINEA FANGHI STABILIZZATI
DI DEPURAZIONE
LINE
SIGNAL CABLE
CAVO DI SEGNALE
DESCRIPTION
DESCRIZIONE
LINEA ARIA COMPRESSA
COMPRESSED AIR LINE
LINEA BY-PASS
BY-PASS LINE
FLEXIBLE COUPLING
GIUNTO FLESSIBILE
new valve oxidation tank emptying nuova valvola svuotamento cisterna ossidazione new valve oxidation tank emptying nuova valvola svuotamento cisterna ossidazione new valve oxidation tank emptying nuova valvola svuotamento cisterna ossidazione incoming waste water meter contatore acque reflue in ingresso outlet purified water meter contatore acque depurate in uscita new cables to the new electrical panel nuovi cavi al nuovo quadro elettrico new cables to the new electrical panel nuovi cavi al nuovo quadro elettrico new cables to the new monitoring system -nuovi cavi al nuovo sistema di monitoraggio new cables to the new monitoring system -nuovi cavi al nuovo sistema di monitoraggio
NEW DEVICES
NUOVE APPARECCHIATURE
23 NUOVA SONDA LIVELLO
NEW LEVEL SENSOR
24 NUOVO DISPLAY STRUMENTI (CONTATORI/LIVELLI)
NEW INSTRUMENTS DISPLAY (METERS/LEVELS)
25 NUOVO CONTATORE FANGHI
NEW FLUDGE FLOW METER
26 NUOVO CONTATORE OSSIGENO DISCIOLTO
NEW DISSOLVED OXYGEN METER
27 NUOVA VALVOLA MOTORIZZATA
NEW MOTORIZED VALVE
28 GALLEGGIANTE DA SOSTITUIRE
FLOATING BALL LEVEL SENSOR TO REPLACE
NEW
NUOVO
DESCRIPTION
DESCRIZIONE
NEW
NUOVO
23 24
NEW SIGNAL CABLE
NUOVO CAVO DI SEGNALE
AutoCAD SHX Text %%C150
AutoCAD SHX Text
TP
AutoCAD SHX Text %%C150
AutoCAD SHX Text %%C200
AutoCAD SHX Text %%C150
AutoCAD SHX Text %%C80
AutoCAD SHX Text S9
AutoCAD SHX Text %%C150
AutoCAD SHX Text
TS
AutoCAD SHX Text S6
AutoCAD SHX Text %%C80
AutoCAD SHX Text
SR
AutoCAD SHX Text %%C150
AutoCAD SHX Text
TS
AutoCAD SHX Text
TS
AutoCAD SHX Text
ESL
AutoCAD SHX Text %%C150
AutoCAD SHX Text %%C80
AutoCAD SHX Text
TS
AutoCAD SHX Text %%C150
AutoCAD SHX Text %%C150
AutoCAD SHX Text
TS
AutoCAD SHX Text
SRL
AutoCAD SHX Text
TS
AutoCAD SHX Text
CL
AutoCAD SHX Text %%C150
AutoCAD SHX Text S8
AutoCAD SHX Text %%c15
AutoCAD SHX Text
TS
AutoCAD SHX Text
ESL
AutoCAD SHX Text %%C150
AutoCAD SHX Text %%C80
AutoCAD SHX Text S5
AutoCAD SHX Text
SR
AutoCAD SHX Text %%C80
AutoCAD SHX Text %%C150
AutoCAD SHX Text %%C80
AutoCAD SHX Text S7
AutoCAD SHX Text S4
AutoCAD SHX Text %%C80
AutoCAD SHX Text
SR
AutoCAD SHX Text
CL
AutoCAD SHX Text %%C15
AutoCAD SHX Text
CL
AutoCAD SHX Text S2
AutoCAD SHX Text %%C80
AutoCAD SHX Text %%C80
AutoCAD SHX Text %%C80
AutoCAD SHX Text
ESL
AutoCAD SHX Text S
AutoCAD SHX Text
SAN
AutoCAD SHX Text
ESL
AutoCAD SHX Text %%c15
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text %%C110
AutoCAD SHX Text
TD
AutoCAD SHX Text %%C110
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text %%C110
AutoCAD SHX Text %%C110
AutoCAD SHX Text
TD
AutoCAD SHX Text
TD
AutoCAD SHX Text %%C110
AutoCAD SHX Text
TD
AutoCAD SHX Text A
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
FRL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SL
AutoCAD SHX Text
SRL
AutoCAD SHX Text
OT
AutoCAD SHX Text
OT
AutoCAD SHX Text
EFSAN
AutoCAD SHX Text
ESL
AutoCAD SHX Text
FSAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
OT
AutoCAD SHX Text
FA
AutoCAD SHX Text
FA
AutoCAD SHX Text
FA
AutoCAD SHX Text
OT
AutoCAD SHX Text
OT
AutoCAD SHX Text %%C90
AutoCAD SHX Text
OT
AutoCAD SHX Text
OT
AutoCAD SHX Text %%C90
AutoCAD SHX Text %%C90
AutoCAD SHX Text
OT
AutoCAD SHX Text
OT
AutoCAD SHX Text %%C90
AutoCAD SHX Text
OT
AutoCAD SHX Text
OT
AutoCAD SHX Text %%C90
AutoCAD SHX Text %%C90
AutoCAD SHX Text
OT
AutoCAD SHX Text
OT
AutoCAD SHX Text %%C300
AutoCAD SHX Text %%C300
AutoCAD SHX Text %%C200
AutoCAD SHX Text %%C200
AutoCAD SHX Text
SAN
AutoCAD SHX Text %%C300
AutoCAD SHX Text
BP
AutoCAD SHX Text
OT
AutoCAD SHX Text
TS
AutoCAD SHX Text
SR
AutoCAD SHX Text
FSAN
AutoCAD SHX Text
EFSAN
AutoCAD SHX Text
ESAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
OT
AutoCAD SHX Text
EOT
AutoCAD SHX Text
SL
AutoCAD SHX Text
ESL
AutoCAD SHX Text
CL
AutoCAD SHX Text
ESRL
AutoCAD SHX Text
SRL
AutoCAD SHX Text
FRL
AutoCAD SHX Text
TD
AutoCAD SHX Text
FE
AutoCAD SHX Text
SS
AutoCAD SHX Text
TP
AutoCAD SHX Text
FA
AutoCAD SHX Text
SC
AutoCAD SHX Text
ESC
AutoCAD SHX Text
BP
not in scale
EQUIPMENT LIST
ELENCO APPARECCHIATURE
New condition waste water treatment plant - section 1 Progetto impianto depurazione - sezione 1
EXISTING ELECTRICAL PANEL - REPLACE
QUADRO ELETTRICO ESISTENTE - SOSTITUIRE
CONNECT THE EXISTING WATER METER TO THE MCS
COLLEGARE CONTATORE ACQUA ESISTENTE AL MCS
INSTALL NEW LEVEL SENSOR AND CONNECT TO MCS.
INSTALLARE NUOVO SENSORE E CONNETTERE AL MCS
REMOVE AND REPLACE EXISTING FLOATING BALL AND CONNECT TO MCS
RIMUOVERE E SOSTITUIRE IL GALLEGGIANTE E COLLEGARE AL MCS
INSTALL NEW DISPLAY LEVEL SENSOR
INSTALLARE NUOVO DISPLAY SENSORE DI LIVELLO
REMOVE AND REPLACE THE HYPOCHLORITE PUMP
SOSTITUIRE POMPA DOSATRICE IPOCLORITO
NUMERO DISEGNO
drawing number
STATO DEL PROGETTO
project phase
TITOLO FOGLIO
sheet title
N on è p er m es so c on se gn ar e a te rz i o ri pr od ur re q ue st o do cu m en to nè u til iz za rn e il co nt en ut o o re nd er lo c om un qu e no to a te rz i s en za la n os tra a ut or iz za zi on e es pl ic ita
O gn i i nf ra zi on e co m po rta il ris ar ci m en to d ei d an ni s ub iti
E' fa tta ri se rv a di tu tti i di rit ti de riv an ti ar t.8
L eg ge d el
2/ 3/
;a rtt
.9 e
Le gg e de l 2 2/
2/
COMMITTENTE
owner
UBICAZIONE IMPIANTO
site location
TITOLO DEL PROGETTO
project title
FOGLIO NR. DI
sheet of
NR.PROGETTO
project no.
SCALA
scale
DATA
date
NR.REVISIONE DATA REVISIONE
revision No. revision date
PRELIMINARE
DEFINITIVO
ESECUTIVO
COSTRUTTIVO
preliminary 35% pre-final 90% working 100% construction (as built)
Li ce nz a
Au to ca d
LT
s/ n
2-
35% rev.01 Feb. 13th, 2020
U.S. ARMY ENGINEERING &
SUPPORT CENTER
4820 UNIVERSITY DRIVE
HUNTSVILLE, AL 35816-1822
LEGHORN DEPOT AREA
LIVORNO
ITALY
DDC UPGRADES AND UMCS
INTEGRATION EXISTING
SIEMENS DESIGO
WATER AND WASTE WATER
W912DY-16-D-0001
DESIGN
July, 29th 2020
90% rev.00 June 10th, 2020
WASTE WATER TREATMENT
PLANT - Section 1 DESIGN - Electrical and mechanical plant -
... @A3
W07 not in scale New condition waste water treatment plant - section 2 Progetto impianto depurazione - sezione 2
EQUIPMENT LIST
ELENCO APPARECCHIATURE
INSTALL NEW FLUDGE FLOW METER
INSTALLARE NUOVO CONTATORE FANGHI
7 7
REPLACE EXISTING DISSOLVED OXYGEN METER
SOSTITUIRE CONTATORE OSSIGENO DISCIOLTO
8 8 8
INSTALL NEW VALVE FOR OXIDATION TANK EMPTYING
INSTALLARE NUOVA VALVOLA PER LO SVUOTAMENTO CISTERNA OSSIDAZIONE
9 9
8 8
NUMERO DISEGNO
drawing number
STATO DEL PROGETTO
project phase
TITOLO FOGLIO
sheet title
N on è p er m es so c on se gn ar e a te rz i o ri pr od ur re q ue st o do cu m en to nè u til iz za rn e il co nt en ut o o re nd er lo c om un qu e no to a te rz i s en za la n os tra a ut or iz za zi on e es pl ic ita
O gn i i nf ra zi on e co m po rta il ris ar ci m en to d ei d an ni s ub iti
E' fa tta ri se rv a di tu tti i di rit ti de riv an ti ar t.8
L eg ge d el
2/ 3/
;a rtt
.9 e
Le gg e de l 2 2/
2/
COMMITTENTE
owner
UBICAZIONE IMPIANTO
site location
TITOLO DEL PROGETTO
project title
FOGLIO NR. DI
sheet of
NR.PROGETTO
project no.
SCALA
scale
DATA
date
NR.REVISIONE DATA REVISIONE
revision No. revision date
PRELIMINARE
DEFINITIVO
ESECUTIVO
COSTRUTTIVO
preliminary 35% pre-final 90% working 100% construction (as built)
Li ce nz a
Au to ca d
LT
s/ n
2-
35% rev.01 Feb. 13th, 2020
U.S. ARMY ENGINEERING &
SUPPORT CENTER
4820 UNIVERSITY DRIVE
HUNTSVILLE, AL 35816-1822
LEGHORN DEPOT AREA
LIVORNO
ITALY
DDC UPGRADES AND UMCS
INTEGRATION EXISTING
SIEMENS DESIGO
WATER AND WASTE WATER
W912DY-16-D-0001
DESIGN
July, 29th 2020
90% rev.00 June 10th, 2020
WASTE WATER TREATMENT
PLANT - Section 2 DESIGN - Electrical and mechanical plant
... @A3
W08
Bldg# 5012
Bldg# 5155
PUMP n°1 PUMP n°2 FLOATING BALL LEVEL SENSOR n°1 FLOATING BALL LEVEL SENSOR n°2
LEVEL SENSOR
PUMP n°1 PUMP n°2 FLOATING BALL LEVEL SENSOR n°1 FLOATING BALL LEVEL SENSOR n°2
LEVEL SENSOR
Bldg# 5672
TXS1.12F10PXC100-E.D
PUMP n°1 PUMP n°
FLOATING BALL LEVEL SENSOR n°1 FLOATING BALL LEVEL SENSOR n°...
509 NETWORK
Bldg# 5154
TXS1.12F10PXC100-E.D
Bldg# 5134
TXS1.12F10PXC100-E.D
Bldg# 5514
TXS1.12F10PXC100-E.D
PUMP n°1 PUMP n°2 FLOATING BALL LEVEL SENSOR n°1 FLOATING BALL LEVEL SENSOR n°2
LEVEL SENSOR
Bldg# 5137
TXS1.12F10PXC100-E.D
Bldg# 5523
TXS1.12F10PXC100-E.D
PUMP n°1 PUMP n°2 FLOATING BALL LEVEL SENSOR n°1 FLOATING BALL LEVEL SENSOR n°2
LEVEL SENSOR
Bldg# 5531
TXS1.12F10PXC100-E.D
Bldg# 5551
TXS1.12F10PXC100-E.D
Bldg# 5562
TXS1.12F10PXC100-E.D
Bldg# 5591
TXS1.12F10PXC100-E.D
Bldg# 5601
TXS1.12F10PXC100-E.D
NUMERO DISEGNO
drawing number
STATO DEL PROGETTO
project phase
TITOLO FOGLIO
sheet title
N on è p er m es so c on se gn ar e a te rz i o ri pr od ur re q ue st o do cu m en to nè u til iz za rn e il co nt en ut o o re nd er lo c om un qu e no to a te rz i s en za la n os tra a ut or iz za zi on e es pl ic ita
O gn i i nf ra zi on e co m po rta il ris ar ci m en to d ei d an ni s ub iti
E' fa tta ri se rv a di tu tti i di rit ti de riv an ti ar t.8
L eg ge d el
2/ 3/
;a rtt
.9 e
Le gg e de l 2 2/
2/
COMMITTENTE
owner
UBICAZIONE IMPIANTO
site location
TITOLO DEL PROGETTO
project title
FOGLIO NR. DI
sheet of
NR.PROGETTO
project no.
SCALA
scale
DATA
date
NR.REVISIONE DATA REVISIONE
revision No. revision date
PRELIMINARE
DEFINITIVO
ESECUTIVO
COSTRUTTIVO
preliminary 35% pre-final 90% working 100% construction (as built)
Li ce nz a
Au to ca d
LT
s/ n
2-
35% rev.01 Feb. 13th, 2020
U.S. ARMY ENGINEERING &
SUPPORT CENTER
4820 UNIVERSITY DRIVE
HUNTSVILLE, AL 35816-1822
LEGHORN DEPOT AREA
LIVORNO
ITALY
DDC UPGRADES AND UMCS
INTEGRATION EXISTING
SIEMENS DESIGO
WATER AND WASTE WATER
W912DY-16-D-0001
DESIGN
July, 29th 2020
90% rev.00 June 10th, 2020
DISTRIBUTION SCHEME
varius @A3
E01
NEW FIBER OPTIC CABLE
SINGLE MODE 12 STRANDS - connected 4 strands
NUOVO CAVO FIBRA OTTICA
12 FIBRE SINGLE MODE - attestate 4 fibre
EXISTING FIBER OPTIC CABLE
CAVO FIBRA OTTICA ESISTENTE
NEW FIBER OPTIC CABLE
SINGLE MODE 12 STRANDS - connected 4 strands
NUOVO CAVO FIBRA OTTICA
12 FIBRE SINGLE MODE - attestate 4 fibre
NEW FIBER OPTIC CABLE
SINGLE MODE 12 STRANDS - connected 4 strands
NUOVO CAVO FIBRA OTTICA
12 FIBRE SINGLE MODE - attestate 4 fibre
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
AutoCAD SHX Text Nr.1
| Fogli e viste |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-G01_COVER |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-G02_MAPS |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-G03_INDEX |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-G04_KEYPLAN |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C01 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C02 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C03 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C04 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C05 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C06 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C07 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C08 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C09 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C10 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C11 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C12 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C13 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C14 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C15 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C16 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C17 scheme |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C18 detail |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C19 descr |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C20 com details |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C21 com detail |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-C22 com descr |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A01 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A02 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A03 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A04 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A05 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A06 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A07 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A08 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A09 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-A10 Details |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-W01_Lift Design Existing |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-W02_Lift Design New |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-W03_Lift 5514 Design Existing |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-W04_Lift 5514 Design New |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-W05_Scheme |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-W06_scheme |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-W07_Design Waste |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-W08_Design Waste 2 |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-E01 Distribution Scheme |
| DDC Upgrades and UMCS Integration_Waste Water Design_100% rev.00 20_07-E02 Details |