Attachment 12 - Price Book for Contractors Quote (Option Year One)(Final).xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- W58D2M22Q0009
About this file
This document provides details for a federal contract opportunity to provide maintenance and repair services for HVAC and heating systems at various facilities of the United States Army Garrison Italy Darby Military Community. Key services required include maintenance, repair, replacement, and code compliance work for chillers, heat pumps, air handling units, boilers, ventilation systems, and other HVAC-related equipment. The performance period is from August 2022 through August 2025 with both a base period and two option years. The solicitation will be issued as a request for quotation resulting in a firm-fixed price contract. Responses are due on August 3rd, 2022 and award is anticipated for that same date. Documentation is required to demonstrate technical qualifications, experience on similar projects, certifications, and responsibility. The work will be performed at locations of the United States Army Garrison Italy Darby Military Community.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| OPTION YEAR ONE - W58D2M22Q0009 - ATTACHMENT 12 (FINAL) | |||||
| PRICE LIST | |||||
| # | Description | Unit | Quantity | Unit Price ( € ) | Total Price ( € ) |
| 1 | Replace Sanitary Hot Water Tank, Polywarm material, with internal exghanger for heat pump unit and Rigid Thermal Insulation 300lt, energy class A (ref. type Bolly 1 XL WB - 3104162330052 or equivalent). Completed of all related accessories, flanges, connectors, disharge faucet at the bottom, air relief vent, INAIL Safety Valve up to 6 bar. | EA | 2 | € - 0 | € - 0 |
| 2 | Replace Solar Panel Type Vitosol 300 or equivalent completed of accessories | EA | 2 | € - 0 | € - 0 |
| 3 | Replace Fan Coil Type Ferroli Jolly TOP 3V or Equivalent, sizes from 790mm to 1240mm, completed of all related accessories: shperic manual valves, hydraulic joints and connections, 2 or 3 way automatic valve, air filter, floor supports on board digital thermostat, electrical connection, etc. | EA | 10 | € - 0 | € - 0 |
| 4 | Replacement of Split Unit (from 8000 to 24000 btu). Material Provieded by DPW Supply/Shops. | EA | 20 | € - 0 | € - 0 |
| 5 | Replacement of Expansion Tank for closed circuit up to 50lt completed of accessories | EA | 10 | € - 0 | € - 0 |
| 6 | Replacement of Electrical Resistor for Sanitary Hot Water Tank up to 4kW-220V-1P+N completed of accessories | EA | 12 | € - 0 | € - 0 |
| 7 | Replacement of Safety Valve INAIL Market up to 6 bar | EA | 5 | € - 0 | € - 0 |
| 8 | Replacement of Safety Bi-Thermostat INAIL Marked up to 110°C completed of Installation pit | EA | 5 | € - 0 | € - 0 |
| 9 | Replacement of Pressure Gauge INAIL Marked on HVAC or Hot Water System | EA | 1 | € - 0 | € - 0 |
| 10 | Replacement of Fuel Electric Solenoid Valve for the fuel line connecting the boiler to the fuel storage tank | EA | 5 | € - 0 | € - 0 |
| 11 | Replacement of Safety Valve (VIC) INAIL Marked for Hot Water System Fuel Type | EA | 5 | € - 0 | € - 0 |
| 12 | Urgent Cleaning of a Boiler/Burner (including the opening of the boiler, internal and external clening) and any other action to fully comply with boiler reactivation. | EA | 5 | € - 0 | € - 0 |
| 13 | Visual Inspction on a Ducted System to complete by "Tecnico Categoria A" IAW "Protocollo AICARR" on a half tour of duty. Potential Costs required for the use of a Cherry Picker or an Elevator will be compensated thru the use of the dedicated line item included into this price book. | EA | 5 | € - 0 | € - 0 |
| 14 | Technical Inspcetion on a Ducted System to complete by "Tecnico Categoria A" IAW "Protocollo AICARR" which include Samplings and Tests Report performed thru authorized Labs. Potential Costs required for the use of a Cherry Picker or an Elevator will be compensated thru the use of the dedicated line item inlcuded into this price book. | EA | 5 | € - 0 | € - 0 |
| 15 | Rental cost for Cherry Picker or Elevator needed to perform activities in elevation during half tour of duty. | EA | 10 | € - 0 | € - 0 |
| 16 | Rental Cost for Cherry Picker or Elevator needed to perform activities in elevation during one tour of duty. | EA | 10 | € - 0 | € - 0 |
| 17 | Production, sending and completion of all the technical requirements, and associated costs, for the INAIL homologation of a hot water system, in conjuction of activities for maintenance, replacement, code compliance of sobstitution of system over than the 35kW, performed by a Registered Technician/Engineer, IAW INAIL Raccolta R | EA | 2 | € - 0 | € - 0 |
| 18 | Replace refrigerating scroll compressor for chiller/heat pump unit: 400V, 50Hz, 35m3/h, 3500rpm, IP54, Compressing Up to 45bar for R410 gas. Item including accessories, work and tools to fully comply with the repair. | EA | 1 | € - 0 | € - 0 |
| TOTAL AMOUNT | € - 0 |
File details come from the government source that posted it. Updated .