B08-RFP_Atch 1A_Technical Specification (Addendum 001).pdf

PDF 4 MB Posted

Attached to
Repair and upgrade of various roads in the Ammunition Storage Area, Camp Darby, Tirrenia (Pisa), Italy.
Solicitation number
W58D2M21R0006
Issued by

About this file

This document contains details for a federal construction contract opportunity for repair and upgrade work at Camp Darby in Italy. The U.S. Army Contracting Command is soliciting proposals for a design-bid-build project to repair and upgrade various roads in the Ammunition Storage Area of Camp Darby. The scope of work includes road widening, installation of horizontal and vertical signs, construction of reinforced concrete fauna underpasses and intersections, and installation of a new communication system along the roads. The project magnitude is estimated between $1-5 million. The performance period is 365 calendar days. A mandatory site visit will be held on June 14, 2021, and proposals are due by June 11, 2021 when the solicitation package will be posted to BetaSAM. Offerors must be System for Award Management registered and NATO Code qualified to be eligible for award.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

30 March 2021

ADDENDUM 001

PROJECT AA1 00212-6 Repair Upgrade ASA Roads, SW Area

Communication and MV cable ducts have been already installed along Vione del Casone from Mancino Road to bldg 3079 with another contract. New MV lines and Fiber Optic cables have been already installed in these cables ducts. With reference to the attached file “Attachment 1- MV and Communication cable ducts – maholes along Vione del Casone” please find:

o in blue the new MV cable ducts and manholes;

o in purple the new Communication cable ducts and manholes.

A street lighting system has been installed along Vione del Casone from Mancino Road to

Bassetto Road with another contract. The new street lighting system is composed by metallic poles installed at 1 meter from the north edge of the existing road, LED fixtures, cable ducts and new LV cables.

The installation of new communication cable ducts and manholes along Vione del Casone is deleted from the scope of work. The installation of communication cable ducts and manholes in the other roads subject of this project remains included in the scope of work.

The works to be done along Vione del Casone for the repair / upgrade of the road will take into consideration the above listed existing utilities and street lighting system. In particular:

o The new road border will keep one meter of distance from the lighting poles;

o The existing MV and communication manholes falling inside the new road surface will be modified to make all the cast iron covers perfectly flushing to the new road surface.

Prepared by GIANLUCA LUCETTI Approved by JACK P. SMITHBACK

Chief, Engineering Division Public Works Manager

LUCETTI.GIANLU

CA.1466348151

Digitally signed by

LUCETTI.GIANLUCA.1466348151

Date: 2021.03.30 14:54:07 +02'00'

SMITHBACK.JACK.P

ETER.1101494574

Digitally signed by

SMITHBACK.JACK.PETER.110149457

Date: 2021.03.30 16:29:36 +02'00'

W58D2M-21-R-0006 Attachment 1A

The OK Design GroupGovernment Technologies Inc.

ROADSIDE

STREETLIGHTS NEW POSITION

DETAIL OF NEW DUCTS POSITION

not in scale

W58D2M-21-R-0006

W58D2M-21-R-0006

W58D2M-21-R-0006

Attachment5Addendum
A03-Attachment 1 to Addendum 001_20210330

File details come from the government source that posted it. Updated .