Additional Proposal-SV Information.pdf

PDF 69 KB Posted

Attached to
Inspection, Testing, Maintenance of Fire Alarm and Sprinkler System
Solicitation number
W56ZTN22R0007
Issued by

View the file

Other files

File Type Posted
Additional Proposal-RFI Information.docx DOCX document
RFI Govt Response Pre Bid 002.pdf PDF
Davis-Bacon Wage Determinations RFI Response.docx DOCX document
RFI Govt Response Pre Bid 003.pdf PDF
RFI Govt Response Pre Bid 001.pdf PDF
AnnualFireSprinklerForm- Bldg 517 1-5-23_Redacted.pdf PDF
SpecialHazardsPreActionForm- Bldg 3500 1-19-23_Redacted.pdf PDF
FirePumpPeriodicTestReport- Bldg 1120B 1-11-23_Redacted.pdf PDF
AnnualFireSprinklerForm- Bldg 2485-2486 1-24-23_Redacted.pdf PDF
FireAlarmForm- Bldg 350 1-4-23_Redacted.pdf PDF
AnnualFireSprinklerForm- Bldg 460B 1-10-23_Redacted.pdf PDF
AnnualFireSprinklerForm- Bldg 342 1-3-23_Redacted.pdf PDF
FireAlarmForm- Bldg 327 1-3-23_Redacted.pdf PDF
FirePumpPeriodicTestReport- Bldg 1120C 1-11-23_Redacted.pdf PDF
SpecialHazardsPreActionForm- Bldg E3401 (1st Flr Zone 1) 1-17-23_Redacted.pdf PDF
FireAlarmForm- Bldg 342 1-3-23_Redacted.pdf PDF
AnnualFireSprinklerForm- Bldg 700G 1-3-23_Redacted.pdf PDF
AnnualFireSprinklerForm- Bldg 689 1-11-23_Redacted.pdf PDF
FirePumpPeriodicTestReport- Bldg E2800 1-12-23_Redacted.pdf PDF
FireAlarmForm- Bldg 700G 1-3-23_Redacted.pdf PDF
AnnualFireSprinklerForm- Bldg 327 1-3-23_Redacted.pdf PDF
AnnualFireSprinklerForm- Bldg 688 1-11-23_Redacted.pdf PDF
AnnualFireSprinklerForm- Bldg 3147 1-5-23_Redacted.pdf PDF
SpecialHazardsPreActionForm- Bldg 1114A 1-24-23_Redacted.pdf PDF
AnnualFireSprinklerForm- Bldg 690 1-11-23_Redacted.pdf PDF
Solicitation R1-13Jan2023.pdf PDF
Past Performance Evaluation Questionnaire.docx DOCX document
Response to Request for Site Visit.pdf PDF
Solicitation R1- 13Jan2023.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Proposal Information:

8 February 2023

Thank you to all those who attended the site visit on 7 February 2023. The site visit allowed those in attendance to review the Fire Alarm/Sprinkler systems currently installed in the buildings and to ask any questions. No questions were presented that would cause any changes to the PWS. As a result of the site visit, the Government has determined that a second site visit will not be necessary. Therefore, the additional site visit for ALC has been cancelled.

If you have additional questions, these must be submitted to Ms. Keelty and Ms. Cousins, at the addresses indicated in the solicitation, not later than 10:00AM 9 February 2023. No further questions or site visit requests will be accepted after this date.

File details come from the government source that posted it. Updated .