Amendment_0003.pdf

PDF 374 KB Posted

Attached to
Carbon Change-out at Perryman Water Treatment Plant (PWTP)
Solicitation number
W56ZTN-18-T-0003
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
RFP_W56ZTN-18-T-0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to continuously provide questions and answ ers (see continuous page).

Proposal(s) due date remains unchanged as May 04, 2018, at 11:00 A.M. Eastern Time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W56ZTN-18-T-0003

X 9B. DATED (SEE ITEM 11)

06-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Apr-2018

CODE

ACC-APG - GARRISON DIVISION (W56ZTN)

ACC-APG GARRISON DIVISION

BLDG 6001

6565 SURVEILLANCE LOOP

ABERDEEN PROVING GROUND MD 21005-3013

W56ZTN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W56ZTN-18-T-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003 TEXT

Questions and Answers (Q&A) are as follows:

Questions #1, #2, and #3: See Amendment 0001 which was released in FedBizOpps on 13 April 2018.

Questions #4 thru #12: See Amendment 0002 which was released in FedBizOpps on 18 April 2018.

Question #13: Is there an SOP or specific requirements for the metal thickness testing? If a historical report can be provided, please provide.

Answer #13: There is not an SOP or specific requirements for the metal thickness testing. Industry standards or practices would be applicable (and should be referenced) in the report. As stated previously the historical reports cannot be provided.

Question #14: Should disposal be required, assuming regeneration is not feasible, how will disposal costs be managed?

Answer #14: Disposal costs are the responsibility of the contractor.

(However the disposal facility to be used must be pre-approved by the APG POC.)

Question #15: Should contractor assume all carbon will be regenerated as it relates to proposal costing?

Answer #15: This is a decision of the contractor. There is a regeneration loss factor that must be considered and only the pre-regeneration approval sampling results at each annual change-out event will dictate if the carbon can be regenerated. Regeneration approval is not guaranteed. It is typically close and has failed once.

Question #16: Can copies of the required reports be provided in order to evaluate the level of effort required?

Answer #16: No. Contractor is responsible for providing sufficient information to address the intent of the requested reports.

Question #17: Can carbon acceptance samples be collected prior to scheduling of change-out activities?

Answer #17: Logistically the process would require it as test results may dictate scheduling. Arrangements are typically made perhaps 30-45 days prior to scheduling.

Question #18: How are samples obtained? Top of vessel or via slurry line?

Answer #18: The contractor is responsible for obtaining truly representative samples. Since the process flow is top down, results will be top high biased. How the contractor plans to obtain the samples will be evaluated to ensure they are representative.

W56ZTN-18-T-0003

(End of Summary of Changes)