DD Form 1423 Update.pdf
PDF 519 KB Posted
- Solicitation number
- W56ZLW-26-Q-0003
- Issued by
-
Department of the Army
About this file
This is a Contract Data Requirements List (DD Form 1423) for a hazardous material services contract at Fort Bliss. The contract reference is PWS W911SG-26-Q-A011, with the Logistics Readiness Center at Fort Bliss as the requiring office. The form specifies 15 data deliverables that contractors must submit throughout contract performance.
The deliverables encompass personnel management, training documentation, safety and environmental compliance, and operational reporting. Key submissions include: Contractor Employee Information List (A001) due 30 days after award and quarterly thereafter; Sexual Assault & Harassment Training Plan (A002) and records (A003); TARP Training Records (A004); Environmental/Safety/Emergency Training Records (A005); Random Drug Testing Results (A006); Sexual Assault Incident Reports (A007) requiring immediate phone notification and written reports within 4 hours; Occupational Reliability Program Documentation (A008); Accounting/Funding Tracking Reports (A009) due weekly; HAZMAT Receipt & Processing Reports (A010) due weekly; Staffing Adjustment Notifications (A011) as required; GFP Discrepancy Reports (A012) due within 24 hours of discovery; Safety Program Documentation (A013); Environmental Compliance Documentation (A014) due monthly; and Quality Program Documentation (A015) due 30 days after award with monthly quality control reports. All deliverables must be submitted electronically in contractor format unless otherwise directed. Approvals are assigned to either the Contracting Officer (KO) or Contracting Officer's Representative (COR), with distribution specified for each data item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56ZLW-26-Q-0003 P0002 Amendment - Combined Synopsis and Solicitation.docx | DOCX document | |
| USG Response to Questions - 06MAY26 .xlsx | XLSX spreadsheet | |
| DD Form 1423 Update.pdf | ||
| Collective Bargaining Agreement (CBA).pdf | ||
| W56ZLW-26-Q-0003 P0001 Amendment - Combined Synopsis and Solicitation.docx | DOCX document | |
| TD-02 Supported Organizations.docx | DOCX document | |
| TD-04 Government Furnished Facilities.xlsx | XLSX spreadsheet | |
| DD Form 1423.pdf | ||
| Wage Determination No 2015-5229.pdf | ||
| TD-03 Hours of Operations.xlsx | XLSX spreadsheet | |
| W56ZLW-26-Q-0003 - Performance Work Statement.docx | DOCX document | |
| W56ZLW-26-Q-0003 - Combined Synopsis and Solicitation.docx | DOCX document | |
| TD-05 Government Furnished Equipment.xlsx | XLSX spreadsheet | |
| TD-06 Government Vehicles.xlsx | XLSX spreadsheet | |
| TD-01 Historical Workload Data.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024 Page 1 of 3
(Updated 20260326)UNCLASSIFIED
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
Contract Data Requirements List
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
PWS W911SG‑26‑Q‑A011 – Hazardous Material Su
5. CONTRACT REFERENCE
As Listed in Block 16
6. REQUIRING OFFICE
Logistics Readiness Center – Fort Bliss
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
Distribution authorized to U.S.
Government agencies
10. FREQUENCY
As Listed in Block 16
11. AS OF DATE
N/A
12. DATE OF FIRST SUBMISSION
As Listed in Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
As Listed in Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
A001 – Contractor Employee Information List (PM‑01) PWS Ref: 1.3.2 Delivery: 30 days after award; quarterly; within 5 days of changes Approval: KO Distribution: KO, COR
A002 – Sexual Assault & Harassment Training Plan (PM‑10) PWS Ref: 1.3.2.6 Delivery: 30 days after award; updates as required Approval: KO Distribution: KO, COR
A003 – Sexual Assault/Harassment Training Records PWS Ref: 1.3.2.6 Delivery: Within 5 business days of each training event Approval: COR Distribution: COR
A004 – TARP Training Records PWS Ref: 1.3.2.5 Delivery: Within 5 business days of each training event Approval: COR Distribution: COR
A005 – Environmental/Safety/Emergency Training Records PWS Ref: 1.3.2.4 Delivery: Within 5 business days of each training event Approval: COR Distribution: COR
A006 – Random Drug Testing Results PWS Ref: 1.3.11 Delivery: Within 5 business days of receipt Approval: COR Distribution: KO, COR
A007 – Sexual Assault Incident Reports PWS Ref: 1.3.2.7 Delivery: Immediate phone report; written report within 4 hours; follow‑ups as needed Approval: KO Distribution: Provost Marshal, KO, ACO, COR
A008 – Occupational Reliability Program Documentation PWS Ref: 1.3.2.1 Delivery: 30 days after award; updates as required Approval: COR Distribution: COR
15.TOTAL 0 0 0
17. PRICE GROUP
0 (NSP)
18. ESTIMATED
TOTAL PRICE
0.00
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024 Page 2 of 3
(Updated 20260326)UNCLASSIFIED
UNCLASSIFIED
16. REMARKS (Continuation)
A009 – Accounting/Funding Tracking Reports PWS Ref: 1.2.6 Delivery: Weekly Approval: COR Distribution: COR
A010 – HAZMAT Receipt & Processing Reports PWS Ref: 1.1.1, 5.2 Delivery: Weekly Approval: COR Distribution: COR
A011 – Staffing Adjustment Notifications PWS Ref: 1.2.5 Delivery: As required Approval: COR Distribution: KO, COR
A012 – GFP Discrepancy Reports PWS Ref: Section C‑3 Delivery: Within 24 hours of discovery Approval: COR Distribution: KO, COR
A013 – Safety Program Documentation PWS Ref: 1.8 Delivery: 30 days after award; updates as required Approval: COR Distribution: COR
A014 – Environmental Compliance Documentation PWS Ref: 1.7 Delivery: Monthly Approval: COR Distribution: COR
A015 – Quality Program Documentation PWS Ref: 1.6 Delivery: 30 days after award; monthly QC reports Approval: KO Distribution: KO, COR
All deliverables shall be submitted electronically in contractor format unless otherwise directed.
G. PREPARED BY H. SIGNATURE I. APPROVED BY J. SIGNATURE
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024 Page 3 of 3
(Updated 20260326)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
File details come from the government source that posted it. Updated .