W56KGZ-22-Q-2013_Solicitation Questions_Answers_2.0.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- MaT Internet Services
- Solicitation number
- W56KGZ-22-Q-2013
About this file
This document contains questions and answers regarding Solicitation Number W56KGZ-22-Q-2013 issued by the Department of the Army Materiel Command Army Contracting Command. The solicitation requests proposals for fixed broadband satellite internet services to be provided on a monthly basis to support operations at sixteen sites located near Maghaweir al-Thowra in Jordan. Offerors are asked to provide dedicated internet speeds of 10Mbps download and 5Mbps upload at each site with a 200GB monthly data allowance and to include sub-CLIN pricing in their proposals for the satellite internet, maintenance and support services. The government will evaluate proposals based on technical capability, price and past performance and prefers solutions utilizing KA-band or KU-band satellite frequencies. Installation services are to be performed by contractor personnel with transportation to sites provided by the military.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56KGZ-22-Q-2013_Solicitation Questions_Answers_2.1.xlsx | XLSX spreadsheet | |
| W56KGZ-22-Q-2013_Solicitation Questions_Answers.xlsx | XLSX spreadsheet | |
| ATTACHMENT 2 - PERFORMANCE REQUIREMENTS SUMMARY.pdf | ||
| W56KGZ-22-Q-2013 - MaT Internet - Solicitation.pdf | ||
| ATTACHMENT 1 - PERFORMANCE WORK STATEMENT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| # | Reference | Question | Gov't Response |
| 1 | General | Is this an existing contract? If so, who is the incumbent and what is the contract number? | There is no existing contract. |
| 2 | General | What satellite is currently providing service? | For C Band, log into the C band modem to see. KU is not identifiable at this time. |
| 3 | General | What frequency is currently providing service (C, Ku, Ka, X, etc.?)? | C band and KU |
| 4 | PWS, Part 1, General Information, Section 1.2 | What type of hardware or equipment does the customer envision or require to deliver the satellite internet services? | Each site will likely require a satellite dish/antenna and uplink/downlink converter with 1-2 Wireless Access Points (WAP) |
| 5 | PWS, Part 1, General Information, Section 1.2 | Does the customer have a preference for the satellite frequency range or band to deliver these services? Namely C-, Ka-, or Ku-Band satellite internet? | There is no preference. |
| 6 | RFP mentions transport of contractor personnel from H-5 to remote customer site | Does the customer require installation to be performed by contractor personnel, or do they prefer the installation to be performed by government personnel with remote support from contractor personnel? | Contractor personnel will perform installation services. |
| 7 | PWS, Part 5, Section 5.1.2 | Are the satellite service speeds of 10Mbps DL / 5Mbps UL as described in the SOW required to be dedicated services? | Yes, they are required to be dedicated services. |
| 8 | PWS, Part 5, Section 5.1.1 | The SOW requires each of the 16 sites to have 200GB of data usage allocated to them per month. How does the customer anticipate dealing with overages or requirements for additional data per month ? Does the customer need the data usage to be capped at 200GB for each site or should offerors include overage charges? | Cap at 200gb per site |
| 9 | Solicitation Doc., Page 37, Sec 6.2.2. | Asks us to provide subCLIN pricing for KA internet services, C band internet services and for maintenance/customer support. Do you all only want KA and C band quoted—or is KU or other satellite bands OK to quote? | KU Band is ok to quote as long as speeds meet standards |
| 10 | Solicitation Doc., Page 37, Sec 6.2.2. | Is there a preference on frequency band to be quoted? | KA, then KU, then C |
| 11 | Solicitation Doc., Page 37, Sec 6.2.2. | There is no location for the subCLIN pricing on the main solicitation form—should we include this as part of the pricing proposal to show this information? | Yes, please include in pricing proposal (excel or other document). |
| 12 | General | In regards to personnel traveling to the sites, can you confirm that it will be the contractor’s responsibility to get to ATG and then military will provide movement to and from the out stations? | No, contractors responsibility to get to H5, then military will transport to ATG and outstations. |
| 13 | General | In regards to the equipment delivery to H5—will the shipment be customs exempt for charges on importing or do we need to plan to pay Jordan for customs fees on entry? | No, they will not be customs exempt. |
| 14 | General | What customs clearance work should we anticipate for the shipment into H5? | |
| 15 | General | Do you have a preferred antenna size for the VSAT units? | Nothing larger than a 1.5 meter |
| 16 | General | Do the VSAT units on site need to be auto-acquire/mobile units, fixed units, or no preference from your side? | There is no preference. |
| 17 | General | After the data lands at the teleport, do you require raw internet, a configured VPN via public internet, or backhaul to another POP? | Yes, likely VPN to CONUS public internet if possible |
| 18 | General | If awarded, are all 16 sites confirmed to come online within the same period—or will task orders be issued and all 16 sites are not guaranteed for services? | Yes, all sites will need to come online in same period |
| 19 | General | What is the lead time to deliver the service after signing the award contract? | As soon as possible |
| 20 | PWS Page 14, Section 5.1.2 | Is the minimum link size of 10 Mbps Down x 5 Mbps Up a CIR (Comitted Information Rate) required at each location? Or is the 10 Mbps Down x 5 Mbps Up to be shared across all (16) locations? Also please verify and certify that the network request is for a guaranteed Mbps network (10/5) and not a highly contended best-effort network. | For the MAT: best effort. Also please verify and certify that the network request is for a guaranteed Mbps network (10/5) and not a highly contended best-effort network. |
| 21 | PWS Page 14, Section 5.4 | Will the Gov provide transportation and security for the installations at the 13 out stations near ATG? | Yes |
| 22 | General | References are made to both GFE and Contractor provided equipment, but there are no specs as it relates to the VSAT/Satellite systems. Please confirm the following: 1) Who provides the VSAT/Satellite Systems? 2) What are the specs on the systems, is it the same for all (16)? | Contractor provided, and the specs are same for all |
| 23 | Solicitation Page 37, Section 6.2.2 | If the Contractor is supplying all equipment and support, the network frequency range should not be important to the end user and the Contractor should be allowed to implement whatever frequency necessary to be technically compliant to the requirements. The Solicitation section 6.2.2 references Ka and C-bands, but no references to any specific frequency ranges are mentioned in the PWS. | no preference for network frequency |
| 24 | PWS Page 12, Part 3, Section 3.2 | Assuming the Contractor will supply all the equipment, will the USG handle CONUS to OCONUS Prince Hassan Air Base shipping? If so, where is the CONUS pickup point located? | No, the Government will not handle shipping. |
| 25 | General | Are there any Public IP's required, if so how many per site? | Not at this time. |
| 27 | Solicitation Page 40, ADDENDUM TO 52.212-2 EVALUATION— 2.2 Factor 2 Price | 2.2.1 States the Government will evaluate the Offeror's total price, but 2.2.3 states that the Government will not evaluate the estimated DBA insurance amount. Does this mean the Total Evaluated price consists only of the Internet CLINs 1001, 2001, 3001, 4001 and 5001? | Yes, the total evaluated price will exclude estimated DBA insurance; however, DBA is based off of total contract award and contractor must provide proof of DBA insurance before work can start. |
| 28 | Solicitation Page 41, ADDENDUM TO 52.212-2 EVALUATION— 1.1 Factor 3 Past Performance | 1.1.1.2 states that Past Performance evaluation will include assesment of Offeror’s information on problems encountered on the identified contracts and the Offeror’s corrective actions. Page 37, 6.3 Factor 3 Past Performance proposal submission instructions does not mention including this information in the Past Performance submission. Please clarify is this information is required. | Yes, this information is required given previous issues with internet contracting in AO. |
| 29 | Solicitation Page 41, ADDENDUM TO 52.212-2 EVALUATION— 1.1 Factor 3 Past Performance | No information is given as to how the Past Performance evaluation will be scored. Will it also be Acceptabe/Unacceptable as the Factor 1 Technical Capability? | Past performance will be rated acceptable or unacceptable. |
| 30 | General | Will the Gov provide the contractor with CACs and LOAs for the life of the contract? | CACs are not required. |
| 31 | Questions 7 and 20 | The U.S. Government customer has requested both dedicated 10Mbps DL x 5Mbps UL in question 7 and “best effort services” in question 20. Could the U.S. Government please clarify what the required service is? |
Does the customer need one pool of 10Mbps DL x 5Mbps UL to be shared across all 16 sites with a data package of 200GB/month at each site? Or does the government require dedicated service speeds of 10Mbps DL x 5Mbps UL at each site with 200GB data packages? Or does the government expect a ‘best effort’ service amongst all sixteen sites that will peak at 10Mbps DL x 5Mbps with 200GB allowance at each site?
| Depending on the use case, some services are best suited over others. | Dedicated 10Mb/s DL 5 Mb/s upload per site with 200Gb data package per site. | |||
| 32 | Questions 7 and 20 | There is some conflicting information as it pertains to Question # 7 and # 20. It's critical that this be clear to all as it will have a significant impact on the overall solution, especially to the pricing. The response to Question # 7 leaves you to believe the requirement is a Dedicated 10Mbps DL X 5Mbps UL for each of the (16) sites. But, Question # 20 indicates a 10/5 link Best Effort for each site which conflicts with Question # 7. |
Dedicated and Best Effort services are distinctively different, it can only be one or the other. Best Effort services are contended, or have a contention rate which can vary depending on how the network is designed, i.e. 10:1, 5:1, etc. A 1:1 contention rate would signify Dedicated Services, either way Dedicated Services are not Best Effort.
Can you please clarify what option is required?
Option #1 - Dedicated 10Mbps down x 5Mpbs up links per site.
| Option #2 - Best Effort / Contended Links 10Mbps down x 5Mpbs up per site. | Option 1 - Dedicated 10Mbps down x 5Mpbs up links per site. | ||||
| 33 | General | Can offerors provide more than 1 propsoal with alternative solutions that can meet the Statement of Work? | Yes, offerors can provide more than one proposal with alternative solutions. | ||
| 34 | Question 11 | To calrify, the offeror should include our own excel spreadsheet that includes sub-CLINs of all work and equipment required to set-up service? | Yes, please provide a separate excel spreadsheet or equvialent with sub-CLIN pricing. |