This document contains a federal contract solicitation for the design, fabrication, and installation of DC busway and combiner cabinets at a US Army facility. The Army's Ground Vehicle Systems Center seeks a contractor to design, furnish, and install five fused disconnects, two DC combiner cabinets, and two busways rated for 1000 volts and 2500 amps each in Test Cells 4 and 5. The contractor must provide all materials, equipment, labor, and rigging to complete the installation per the 2020 NEC and industry standards. Conceptual design drawings are attached to inform bidders on the intended design and approximate locations. Questions are due by November 13th and responses will be provided by November 16th. The selected contractor must complete the work at the Army Materiel Command TACOM Life Cycle Management Command facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Test Cell 4&5 - DC Busway Install Project:

Test Cell 4&5 - DC Busway Install Project:

ATTACHMENT #1: Bldg. 212 Basement AV900 Layout

ATTACHMENT #2: Bldg. 212 Test Cell 4 Busway layout.

ATTACHMENT #3: AV900 Combiner Panel in Basement (1000volt, 2500 amp rated, and Circuit Breaker Protected at 2000amp).

ATTACHMENT #4: AV900 Combiner Panel in Basement (1000volt, 2500 amp rated, and Circuit Breaker Protected at 2000amp).