This document appears to be a set of Questions and Answers (Q&A) related to a federal contract solicitation for the procurement of NSN 1015-01-521-1616, part number 12901000, Mount, Mortar.
The key details are:
- The solicitation number is W56HZV-23-R-0109 and the opportunity type is a Solicitation.
- The solicitation is a single one-time buy with 100% option Firm-Fixed Price (FFP) contract set aside for Small Businesses.
- There is a Technical Data Package (TDP) associated with this procurement, which has distribution code "D" and is export controlled. Offerors must be certified under the United States/Canada Joint Certification Program (JCP) to access the TDP.
- The Q&A document references MIL-M-71228, which has been superseded by Drawing 13108070 Rev.
- Proof Acceptance Testing/Live Fire Testing is required for this solicitation, and the contractor is responsible for the test costs.
- The solicitation due date has been extended from 12 April 2024 to 17 April 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA.xlsx | XLSX spreadsheet | |
| W56HZV23R0109-0002.pdf | ||
| 23R0109_AMD 0001.pdf | ||
| W56HZV23R0109_13MAR24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Answer |
| QAP pages 4 – 5 list Major 102 - Function of Assembly and Major 113- Proof Acceptance. Both Majors reference MIL-L-71228. | MIL-L-71228 is a typo. It is supposed to be MIL-M-71228 and it’s been superseded by Drawing 13108070 Rev . |
| Also, please advise if Proof Acceptance testing aka Live Fire Testing for PN 12901000/ NSN 1015-01-521-1616 is required for this solicitation? | Yes, Proof Acceptance Testing/Live Fire Testing is required for this solicitation. We have pulled out an excerpt from the QAP |
| PN 12901000 QAP [Bipod Assembly, M191]: Major 113, Proof Acceptance, 13108070, STM-3, STM-3 [System Requirements Mortar, 120mm: M120A1; Mortar, 120mm: M121] | |
| 1. STM-3, Proof Acceptance Proof Acceptance shall be in accordance with STM-2 of QAP 12901293 [120mm Light Mortar M120A1, Towed Assembly]. | |
| Please confirm who will be in charge of the test costs, USG or Contractor? | The drawing are specific to the requirement and dictates that a live fire testing is to be done in accordance with the QAP. Contractor will be responsible for costs |
| If contractor, please advise if solicitation can be amended to allow ATEC to quote using government rates specific to the solicitation? | The contractor is responsible for the test firing and cost. It is up to the contractors to provide quotes based on their business practices. |