This document appears to be a set of Questions and Answers (Q&A) related to a federal contract solicitation for the procurement of NSN 1015-01-521-1616, part number 12901000, Mount, Mortar.

The key details are:

  • The solicitation number is W56HZV-23-R-0109 and the opportunity type is a Solicitation.
  • The solicitation is a single one-time buy with 100% option Firm-Fixed Price (FFP) contract set aside for Small Businesses.
  • There is a Technical Data Package (TDP) associated with this procurement, which has distribution code "D" and is export controlled. Offerors must be certified under the United States/Canada Joint Certification Program (JCP) to access the TDP.
  • The Q&A document references MIL-M-71228, which has been superseded by Drawing 13108070 Rev.
  • Proof Acceptance Testing/Live Fire Testing is required for this solicitation, and the contractor is responsible for the test costs.
  • The solicitation due date has been extended from 12 April 2024 to 17 April 2024.

View the file

Other files

File Type Posted
QA.xlsx XLSX spreadsheet
W56HZV23R0109-0002.pdf PDF
23R0109_AMD 0001.pdf PDF
W56HZV23R0109_13MAR24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QuestionAnswer
QAP pages 4 – 5 list Major 102 - Function of Assembly and Major 113- Proof Acceptance. Both Majors reference MIL-L-71228.MIL-L-71228 is a typo. It is supposed to be MIL-M-71228 and it’s been superseded by Drawing 13108070 Rev .
Also, please advise if Proof Acceptance testing aka Live Fire Testing for PN 12901000/ NSN 1015-01-521-1616 is required for this solicitation?Yes, Proof Acceptance Testing/Live Fire Testing is required for this solicitation. We have pulled out an excerpt from the QAP
PN 12901000 QAP [Bipod Assembly, M191]: Major 113, Proof Acceptance, 13108070, STM-3, STM-3 [System Requirements Mortar, 120mm: M120A1; Mortar, 120mm: M121]
1. STM-3, Proof Acceptance Proof Acceptance shall be in accordance with STM-2 of QAP 12901293 [120mm Light Mortar M120A1, Towed Assembly].
Please confirm who will be in charge of the test costs, USG or Contractor?The drawing are specific to the requirement and dictates that a live fire testing is to be done in accordance with the QAP. Contractor will be responsible for costs
If contractor, please advise if solicitation can be amended to allow ATEC to quote using government rates specific to the solicitation?The contractor is responsible for the test firing and cost. It is up to the contractors to provide quotes based on their business practices.