W56HZV20R0050 - Signed.pdf

PDF 161 KB Posted

Attached to
Gas-Particulate Filter Set NSN: 4240-01-369-6533
Solicitation number
W56HZV20R0050
Issued by

About this file

This is a request for proposal for a firm-fixed price contract to produce 3,300 each gas-particulate filter sets to specification MIL-PRF-51527, with an option for an additional 3,300 units. The Army Materiel Command TACOM Life Cycle Management Command is the contracting agency.

The solicitation is full and open competition. First article testing and a technical data package are required. Delivery is required within 330 days of award for the base order, with incremental delivery of the option quantity if exercised. The contractor must comply with higher-level quality standards including ISO 9001 and ISO 17025. Inspection will take place at origin and acceptance at destination. Costs for all testing, including any testing performed by the Army Chemical Biological Center, are the responsibility of the contractor.

View the file

Other files

File Type Posted
W56HZV20R0050-0002.pdf PDF
SOLICITATION QUESTIONS signed.pdf PDF
W56HZV20R0050-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Offeror To Complete Block 12, 17, 23, 24, & 30

1. Requisition Number Page Of

2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date

7. For Solicitation Information Call:

A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time

9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:

Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program

Hubzone Small Business EDWOSB

Service-Disabled Veteran-Owned Small Business NAICS:

Email: 8(A) Size Standard:

11. Delivery For FOB Destination Unless Block Is Marked

12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating

See Schedule 14. Method Of Solicitation RFQ IFB RFP

15. Deliver To Code 16. Administered By Code

Telephone No.

17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code

Telephone No.

17b. Check If Remittance Is Different And Put Such Address In Offer

18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

(Use Reverse and/or Attach Additional Sheets As Necessary)

25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)

27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.

27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.

28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.

Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:

30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)

30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed

Authorized For Local Reproduction Previous Edition Is Not Usable

Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212

W56HZV-20-R-0050 2020APR02

KATHY KESSLER (586)282-7228

KATHY.A.KESSLER.CIV@MAIL.MIL

2020MAY05 12:00pm

W56HZV

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

X

333413

X DOA4

X

SEE SCHEDULE

SEE SCHEDULE

X X

X 1

1 61

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

32a. Quantity In Column 21 Has Been

Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________

32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative

32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative

32g. E-Mail of Authorized Government Representative

33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final

38. S/R Account No. 39. S/R Voucher Number 40. Paid By

41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)

42c. Date Rec’d (YY/MM/DD) 42d. Total Containers

Standard Form 1449 (Rev. 2/2012) Back

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: KATHY KESSLER

Buyer Office Symbol/Telephone Number: CCTA-APS-A/(586)282-7228

Type of Contract 1: Firm Fixed Price

Kind of Contract: Other

Weapon System: Filter Units

*** End of Narrative A0000 ***

1. Under the authority of Title 41 United States Code (U.S.C.), Section 1903, as implemented by FAR 18.2, "Emergency Acquisition

Flexibilities," this contract action has been determined to be streamlined and expedited using commercial acquisition procedures in accordance with FAR 12.102(f)(1).

2. This Request for Proposal (RFP) is full and open competition.

3. This RFP will result in a Firm-Fixed Price Contract for Filter Set, Gas-Part.

4. First Article Test (FAT) and Production Lot Test (PLT) are required.

5. IAW MIL-STD-31000, the Technical Data Package (TDP) is distribution C. This solicitation contains a Restricted TDP. Please refer to

Section C.2 - TECHNICAL DATA PACKAGE INFORMATION for instructions on how to get access to restricted TDPs.

6. Surveillance Criticality Designator (SCD) is B.

7. The contractor is authorized to ship early with no quantity restrictions and at no additional cost to the Government.

A.1. NOTICE OF URGENT REQUIREMENT_________________________________

U.S. Army TACOM considers this requirement to be urgent. Timely performance and delivery are essential. Deliveries ahead of schedule are encouraged whenever delivery can be offered without additional cost to the Government. The Contractor is requested to immediately contact the buyer or contracting officer identified on the cover page of this document to notify them of any pending or potential problems and/or suggestions for contract streamlining that would enable faster deliveries.

A.2. DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE__________________________________________________________________________

(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title

22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(b) To be eligible to gain access to this export controlled TDP (via Beta SAM) an offeror must have a current DD 2345, Militarily

Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/ Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx . Processing time is estimated at six

(6) to ten (10) weeks after receipt. FBO will allow access to export controlled TDPs once certification is confirmed. Upon receipt of certification, an offeror may request the TDP in accordance with the instructions stated in the solicitation's Section C.

(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.3. ALL OR NONE-COMMERCIAL ITEM ACQUISITION____________________________________________

(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL

ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.

2 61

W56HZV-20-R-0050

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.

A.4. ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON_______________________________________________________

Information regarding the Ombudsperson for this contract is located at the following website:

http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html

A.5 ELECTRONIC CONTRACTING__________________________

(a) All Army Contracting Command Warren solicitations will be publicized on the System for Award Management website

(https://beta.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will

NOT be an attachment in the solicitation. Refer to section C to acquire TDPs.

(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via SAM. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry

Bid Response System (ASFI BRS) may be deemed non-responsive.

(c) Requirements for the online SAM bid submission:

(1) Vendors must log into SAM to be able to submit electronic responses for opportunities.

(2) Vendors must be registered in SAM at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE

Code and CCR Marketing Partner Identification Number (MPIN).

(3) Once logged into SAM, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.

(4) SAM will send an email to vendors registered email address confirming the electronic submission.

Note to offerors:

(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

(e) It is the responsibility of the Offeror to ensure the proposal/ quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the

Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

(f) Solicitations may remain posted on SAM after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the

Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

A.6. ACKNOWLEDGEMENT OF AMENDMENTS__________________________________

3 61

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.7. HQ-AMC LEVEL PROTEST PROCEDURES____________________________________

Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/

An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.

*** END OF NARRATIVE A0001 ***

4 61

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 FILTER SET, GAS-PARTICULATE

NSN: 4240-01-369-6533

Mfr CAGE: 81361

Mfr Part Number: MIL-PRF-51527

0001AA PRODUCTION QUANTITY - M98 GAS PARTICULATE FILTER ________________________________________________

SET 3300 EA $ $ ___ ______________ __________________

COMMODITY NAME: FILTER SET, GAS-PARTICULATE

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH9C1438EH PRON AMD: 01

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 5-15-6368

REVISION: P

DATE: 16-OCT-2019

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

REFER TO SECTION D

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/Acceptance at Origin means the contractor

MUST contact DCMA to arrange for a Government inspection BEFORE production under this CLIN is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at Destination. Rejected production will be returned at the contractor's expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZV9254V700 W22PVJ J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 330 0330

002 330 0360

003 330 0390

004 330 0420

5 61

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

005 330 0450

006 330 0480

007 330 0510

008 330 0540

009 330 0570

010 330 0600

FOB POINT: Destination

SHIP TO:

(W22PVJ) XU BLUE GRASS ARMY DEPOT

XU GEN SUP STORAGE PT CRP WHSE 211

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

Early delivery is authorized at no additional cost to the Government.

(End of narrative F001)

0001AB FIRST ARTICLE TEST AND REPORT - GAS PARTICULATE _______________________________________________

FILTER SET 1 LO $ __________ __________________

SERVICE REQUESTED: FATR - GAS PART. FILTER SET

CLIN CONTRACT TYPE:

Firm Fixed Price

FIRST ARTICLE TEST REPORT (FATR), PURSUANT TO THE

REQUIREMENTS OF FAR CLAUSE 52.209-3, "FIRST ARTICLE

APPROVAL - CONTRACTOR TESTING,"

(SEE SECTION I)

First Article Test Report (FATR) is due 180 days after award.

FATR approval/disapproval will be determined by the

Procurement Contracting Officer (PCO), who will be identified at time of award.

First Article Testing is broken into five separate parts as identified under section E, Narrative E0001, Subsection E.4., First Article Testing. The offeror shall provide a price below for each part of the testing with the sum of the parts equaling the total

FAT price for CLIN 0001AB.

Part 1 - $______________

Part 2 - $______________

Part 3 - $______________

6 61

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Part 4 - $_______________

Part 5 - $_______________

TOTAL FAT PRICE: $______________________

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0180

7 61

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

OPTION QUANTITY, PURSUANT TO THE CLAUSE ENTITLED

OPTION FOR INCREASED QUANTITY --- SEPARATELY PRICED

LINE ITEM

(52.217-7).

The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.

(End of narrative A001)

0002 GAS PARTICULATE FILTER SET

NSN: 4240-01-369-6533

Mfr CAGE: 81361

Mfr Part Number: MIL-PRF-51527

0002AA UNEXERCISED OPTION - M98 GAS PARTICULATE FILTER _______________________________________________

SET 3300 EA $ ___ __________________

See Range Pricing

COMMODITY NAME: GAS PARTICULATE FILTER SET

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

0 100 $

101 200 $

201 500 $

501 3300 $

The quantity stated for the option CLIN DOES

NOT Form a part of the basic contractual quantity

(CLIN 0001AA). However, part or all of this CLIN may be added to the contract by exercise of the option clause, at the discretion of the Government.

**IF THE UNEXERCISED OPTION QUANTITY IS

INCREMENTALLY EXERCISED, THE GOVERNMENT WILL

ORDER A MINIMUM ORDER QUANTITY OF 330 EACH

PER ORDER NOT TO EXCEED

THE MAXIMUM UNEXERCISED OPTION PRODUCTION

QUANTITY OF 3,330 EACH.**

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 5-15-6368

REVISION: P

DATE: 16-OCT-2019

8 61

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

REFER TO SECTION D

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/Acceptance at Origin means the contractor

MUST contact DCMA to arrange for a Government inspection BEFORE production under this CLIN is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at Destination. Rejected production will be returned at the contractor's expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 3,300 UNDEFINITIZED

FOB POINT: Destination

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

Early delivery is authorized at no additional cost to the Government.

(End of narrative F001)

9 61

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

1001 DATA ITEM _________

A001 CDRL A001 - RECORD OF MEETING MINUTES REPORT 1 LO $ ____________________________________________ __________________

SERVICE REQUESTED: CDRLS A001

CDRL A001 - Record of Meeting/Minutes Report. Refer to Exhibit A in Section J, List of Attachments.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A002 CDRL A002 - FIRST ARTICLE TEST REPORT (FATR) 1 LO $ ** NSP ** ____________________________________________ __________________

SERVICE REQUESTED: FIRST ARTICLE TEST REPORT

CLIN CONTRACT TYPE:

Firm Fixed Price

The FATR shall be IAW CDRL A002 in Exhibit A, Section

J, List of Attachments.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A003 CDRL A003 - PRODUCTION LOT TEST REPORT 1 LO $ ** NSP ** ______________________________________ __________________

SERVICE REQUESTED: CDRL A003

CDRL A003 shall be in accordance with CDRL A003-

10 61

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Test/Inspection Report in Exhibit A, Section J, List of Attachments and E.7(e) of this contract.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A004 PRODUCTION LOT ACCEPTANCE TEST REPORT (GOVERNMENT) 1 LO $ ** NSP ** __________________________________________________ __________________

SERVICE REQUESTED: TEST/INSPECTION REPORTS

This shall be IAW CDRL A004, Exhibit A, in Section J, List of Attachments.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A005 CDRL A005 - CERTIFICATE OF COMPLIANCE (COC) 1 LO $ ** NSP ** ___________________________________________ __________________

SERVICE REQUESTED: CERTIFICATE OF COMPLIANCE

CLIN CONTRACT TYPE:

Firm Fixed Price

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A006 CDRL A006 - ENGINEERING CHANGE PROPOSAL (ECP) 1 LO $ ** NSP ** _____________________________________________ __________________

SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL

CLIN CONTRACT TYPE:

Firm Fixed Price

11 61

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Contractor shall submit ECP IAW CDRL A006 - Exhibit

A, in section J, List of Attachments.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A007 CDRL A007 - NOTICE OF REVISION (NOR) 1 LO $ ** NSP ** ____________________________________ __________________

SERVICE REQUESTED: NOTICE OF REVISION

CLIN CONTRACT TYPE:

Firm Fixed Price

This shall be IAW CDRL A007, Exhibit A, in section J, List of Attachments.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

A008 CDRL A008 - NOTICE OF REVISION (NOR) 1 LO $ ** NSP ** ____________________________________ __________________

SERVICE REQUESTED: NOTICE OF REVISION

CLIN CONTRACT TYPE:

Firm Fixed Price

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

12 61

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 START OF WORK MEETING__________________________

a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within

30 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort. The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.

b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within 15 days after the meeting is held (Refer to CDRL A001 for submission of meeting minutes).

C.2. TECHNICAL DATA PACKAGE INFORMATION_______________________________________

The following Xd item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[ X ] 2. The directions for TDP access is restricted to those whom are actively registered within SAM and JCP.

Vendors are required to request access through Beta SAM by verifing MPIN. Once requested, email contract specialist, Kathy Kessler, that your company has requested access.

a. If solicitation is Export Controlled, select Verify MPIN.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

C.3. CONFIGURATION MANAGEMENT DOCUMENTATION___________________________________________

a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph

3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph e. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.

d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e(i) through e(iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph

3.3.1 of EIA-649-1 for ECPs shall be submitted IAW CDRL A006.

(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph

3.3.2 of EIA-649-1 for RFVs shall be submitted IAW CDRL A007.

(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph

3.3.4 of EIA-649-1 for NORs shall be submitted IAW CDRL A008.

(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.

CDRLS can be found in Exhibit A, in Section J, List of Attachments.

13 61

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.

g. The submission of an ECP/RFV/SCN/NOR, does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.

h. The contractor shall electronically transmit copies of all ECPs, NORs, RFVs, and VECPs to:

CCDC-CBC Engineering Office

OFFICE: FCDD-CBE-MP

EMAIL: usarmy.ria.ccdc-cbc.mbx.cmaction@mail.mil

FAX: (309) 782-4537

C.4. ENGINEERING EXCEPTIONS___________________________

Packaging per P5-19-6722.

The following documents are required for the SPI P5-19-6722 but not listed in the TDPL (Attachment 0001, Section J, List of

Attachments):

PL5-19-7407

5-19-6408

5-19-6409

5-19-6655

5-19-14329

For MIL-PRF-51527, requirement 3.4.5 Corrosion resistance is not required. Because this test is not required, the samples needed for

Corrosion are not required, as shown in Table II, and the total number for filters required are reduced from 19 Gas Filters to 17 Gas

Filters.

ANSI MH1, if required, can be obtained on the Material Handlers Institute of America's website, www.mhi.org , referenced simply as

MH1. The standard is available at no cost, but free registration on the site is required to obtain the document.

C.5 DRAWING LIMITATIONS________________________

(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:

(1) depict the completed item(s), and

(2) serve as the basis for inspection of the completed item(s).

(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.

(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.

(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the

Government and no delivery schedule extension.

*** END OF NARRATIVE C0001 ***

14 61

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PACKAGING AND MARKING

D.1. PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)

(A). Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(4) SPECIAL PACKAGING INSTRUCTION NUMBER: P5-19-6722

(a) REVISION: F

(b) DATE OF REVISION: 6 NOVEMBER 2018

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ ) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(B) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(C) Marking: In addition to any special markings called out on the SPI;

(1) All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see "http://www.acq.osd.mil/log/sci/ait.html " (best viewed with Internet Explorer 11 or higher) for the current DoD Suppliers Passive

RFID Information Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS

252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at http://dodprocurementtoolbox.com/page/unique-id/tools ) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(D) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

(2) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the

SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

15 61

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(E) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United

Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

(4) When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(g) SUPPLEMENTAL INSTRUCTIONS: REFERENCE CONTRACT NUMBER AND CLIN NUMBER ON EACH BOX. PLACE A RED X AND THE WORDS SHORT BOX ON THE FRONT

OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE MARKINGS SHOWING ON THE TOP FRONT OF THE PALLET LOAD.

D.2. SHELF LIFE MARKINGS

Extendable shelf life markings (e.g., 1, 2, 3, etc.) are required for this procurement and shall be applied in accordance with MILSTD-

129. The shelf life code is 9. The shelf life markings shall include, as applicable: the Manufactured or Assembled or Cured Date:

(mo/yr), and the Insp/Test Date (mo/yr). The Insp/Test Date date shall be 60 months in the future from the manufactured, cured, or assembled date. In accordance with DoD 4140.27-M and MIL-STD-129, an item shall have not less than 85 percent of shelf life remaining at time of receipt by the Government. Any part not having at least 85 percent shelf life remaining shall be considered non-conforming.

D.3. LOT NUMBERING

Lot numbering shall be required per MIL-STD-1168 Manufacturers shall contact usarmy.ria.ccdc-cbc.mbx.qa@mail.mil to obtain a unique manufacturer's identification symbol.

D.4 SPECIAL PACKAGING INFORMATION NOT IDENTIFIED IN TDLP

Refer to Attachment 0001 in Section J, List of Attachments, for additional packaging requirements not listed in Technical Data Package.

*** END OF NARRATIVE D0001 ***

16 61

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

-Quality Management System - ISO 9001:2015 Requirements - Untailored

-General Requirements for the competence of testing and calibration laboratories- ISO 17025

-Note: ISO/IEC17025 must be used in conjunction with ISO 9001

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN____________________________________________

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

E.2 REWORK AND REPAIR OF NONCONFORMING MATERIAL________________________________________________

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the

Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data

Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

17 61

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

E.3 USE OF MIL-STD 1916________________________

(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The

Verification Level (VL) shall be VL 1 for major characteristics and VL 1 for minor characteristics.

(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.

E.4. FIRST ARTICLE TESTING (For Evaluation Purposes - This cannot be waived)_____________________________________________________________________________

(a) First Article Testing (FAT) on the M98 gas particulate filter set, part number (PN) MIL-PRF-51527 shall consist of the five parts

(listed below) with some testing required at a government facility. The contractor is responsible for completion of all testing regardless of who conducts the testing. The contractor shall include all government test data in the FAT report.

PART ONE: Seventeen M98 gas particulate filter set samples, PN MIL-PRF-51527, shall be examined and tested in accordance with (IAW) all_________ requirements of paragraph 4.2 of MIL-PRF-51527D w/amendment 3 and all other pertinent documents listed in the technical data package.

NOTE: The filter set and some subcomponents require FAT testing by either the contractor and the Government, see the TDPL for further information.

PART TWO: The M98 particulate media shall be examined and tested IAW paragraph 4.3 and Table I of PRF EA-F-2349 w/amendment 2 of NOR 349-_________

0268-003.

PART THREE: The carbon shall be examined and tested in accordance with paragraph 4.2 of MIL-DTL-32101B with Notice of Revisions (NORs)___________

258-0019-001.

AGENT/SIMULANT FAT testing is required for 17 M98 Filters, PN MIL-PRF-51527 and the carbon, MIL-DTL-32101B w/amd 1. AGENT/SIMULANT FAT testing will be conducted at the government lab listed E.8.(d) along with other portions of the FAT. The Government facility performing

AGENT/SIMULANT testing shall be a certified laboratory per the contract. The contractor shall include all government test data in with the overall FAT report.

NOTE: Corrosion resistance (Para 3.4.5) testing is not required.

PART FOUR: All other subcomponents shall be inspected and tested IAW with their respective drawing, QAP and or specification.__________

PART FIVE: A packaging FAT is required. The FAT shall consist of three packed units and shall be inspected to all the requirements of__________

SPI P5-19-6722.

(b) A First Article Test Report shall be completed by the contractor documenting the results of all inspections and test (including supplier and vendor inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include measurements, recorded test data, and certifications (if applicable) keyed to each drawing, QAP and specification characteristic. The contractor is responsible for all testing regardless of who conducts the testing. Government testing need not be repeated by the contractor.

(c) At least 30 calendar days before the beginning of contractor performed first article tests, the Contractor shall notify the

Contracting Officer, DCMA Administrative Contracting Officer (ACO), and DCMA Quality Assurance Representative (QAR) in writing of the time and location of the testing so that the Government may witness the tests.

E.5 SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING) AS REQUIRED IN CDRL A003_____________________________________________________________________________________________________

(a) In accordance with the requirements under FAR clause 52.209-3, FIRST ARTICLE APPROVAL - CONTRACTOR TESTING, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality

Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

18 61

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

(4) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.

(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

(e) A First Article Test Report shall be IAW CDRL A002 in section J, List of Attachments, shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .