Natick RFI quesition 4.27.20.docx
DOCX document 21 KB Posted
- Attached to
- Natick Soldier Systems Center (NSSC) Repairs
- Solicitation number
- W56HZV-20-Q-L217
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP W56HZV20QL417 NATICK amendment 0003.pdf | ||
| Natick RFI quesition 6.3.20.docx | DOCX document | |
| Natick RFI quesition 5.29.20.docx | DOCX document | |
| R101 room and electrical photos.pdf | ||
| RFP W56HZV20QL417 NATICK amendment 002.pdf | ||
| Natick RFI quesition 5.12.20 (002).docx | DOCX document | |
| NSSC Integrated Solid Waste Management Plan.docx | DOCX document | |
| NEW Fillable Visitor Request Form 20200416.pdf | ||
| RFP W56HZV20QL417 NATICK amendment 001.pdf | ||
| Base Map.pdf | ||
| SOW Bldg 3 R101 Bldg 4 RmD002 Conference Room Repairs 3-2-20 Final.pdf | ||
| Electrical-Images.pdf | ||
| Davis Bacon Act.pdf | ||
| RFP W56HZV20QL417 NATICK.pdf | ||
| Construction Cost Estimate Breakdown.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI
| RFI Question |
| RFI RESPONSE |
What is the date and time of the site visit?
SITE VISIT: A site visit will be conducted on Tuesday, 26 May 2020 at 0900 hrs. AM Eastern Standard Time. Park in LOT A across from the entrance ramp to meet near the project site building 3 RM # R101. Use attached map for directions at the Natick Soldiers System Center. Please note this date could change due to Covid 19.
What is required to get on base?
A visitor request form needs to be filled out and submitted to DES. Attached in email.
Please confirm that existing HVAC supply & return grilles and all other ceiling fixtures to remain except ceiling tiles and lights?
All to remain except ceiling tiles. Not HVAC and light changes.
Verify bldg 4 conference rm #, shown as D0002 and also as D0004 (typo?)
Building 4 Rm# D002
Natick Soldier System Center Buildings 3 and 4 Conference Room Repairs
W56HZV-20-Q-L217
Response to RFI’s Date: 21 April 2020
| RFI |
| RFI Question |
| RFI RESPONSE |
Provide these 2 docs that are listed as attachments in SOW pg. 23
1. NSSC Integrated Solid Waste Management Plan
2. Construction Submittal Checklist
The contractor will have to provide us weights for all materials leaving this facility,...whether there being recycled (ie., scrap metal or reutilization) or disposed. See attached waste management plan for additional details.
Construction submittal checklist: n/a
Yes, plans will be required. I can’t provide pictures but during the site visit, vendors will have the opportunity to see the room and ask questions.
| 6 |
| Do we need to provide any plans for Rm D0002? |
| RFI |
| RFI Question |
| RFI RESPONSE |
Which version of REVIT do they require for as-builts?
I don’t understand the question.
| RFI |
| RFI Question |
| RFI RESPONSE |
| RFI |
| RFI Question |
| RFI RESPONSE |
| RFI |
| RFI Question |
| RFI RESPONSE |
File details come from the government source that posted it. Updated .