W56HZV20Q0061-0001 signed.pdf
PDF 84 KB Posted
- Attached to
- Chemical Detector Training Kit Federal contract opportunity
- Solicitation number
- W56HZV20Q0061
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W56HZV20Q0061-0004 Signed.pdf | ||
| W56HZV20Q0061-0003 signed.pdf | ||
| W56HZV20Q0061-0002 signed.pdf | ||
| Attachment 0001 GFP M256A2 TRAIN_Jan2020.pdf | ||
| W56HZV-20-Q-0061 signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2020OCT28
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
KATHY KESSLER
EMAIL: KATHY.A.KESSLER.CIV@MAIL.MIL
W56HZV-20-Q-0061
2020MAY04
X
X 2020DEC03 01:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 30
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: KATHY KESSLER
Buyer Office Symbol/Telephone Number: CCTA-APS-A/(586)282-7228
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Detection and Alarm Devices
*** End of Narrative A0000 ***
The purpose of Amendment 0001 of Solicitation W56HZV20Q0061 is to do the following:
1. The solicitation closing date is being changed to 3 December 2020.
2. This Request for Proposal (RFP) will result in a Firm Fixed Price Requirements contract for Chemical Agent Detector Simulation;
Training M256A2.
3. Market research has determined this will be 100% Small Business Set-Aside.
4. First Article Test (FAT) and Production Lot Testing (PLT) are required.
5. IAW MIL-STD-31000, the Technical Data Package (TDP) is distribution C that is export controlled.
6. Surveillance Criticality Designator (SCD) is B.
A.1 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title
22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via beta.sams) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS. To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx . Processing time is estimated at six
(6) to ten (10) weeks after receipt. Beta.SAM will allow access to export controlled TDPs once certification is confirmed. Upon receipt of certification, an offeror may request the TDP in accordance with the instructions stated in the solicitation's Section C.1.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the
TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.2. Electronic Contracting
(a) All Army Contracting Command Warren solicitations will be publicized on the System for Award Management website
(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal beta.SAM.gov, however until beta.SAM.gov can accept proposals offerors should follow the instructions in paragraph (c) below.
(c) With the recent transition from www.FBO.gov to www.beta.sam.gov the site has been experiencing a number of issues. Interested
Offerors shall submit a proposal via email to the Contract Specialist (Kathy.a.kessler.civ@mail.mil) with the subject header: Proposal
Submission - W56HZV-20-Q-0061 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission, however, 2 30
W56HZV-20-Q-0061
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.
Bids can be submitted can be submitted using any of the following electronic formats:
(2) Microsoft Office Products; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(3) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(4) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages.
All linked information must be contained within your electronic bid/offer and be accessible offline.
(5) Other electronic formats are not acceptable.
Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on beta.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.3. ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
A.4. ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date: __________________ _____
3 30
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A.5. ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
A.6. HQ-AMC LEVEL PROTEST PROCEDURES
Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/
An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.
*** END OF NARRATIVE A0001 ***
4 30
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 DETECTOR, CHEMICAL A
NSN: 6665-01-663-5355
Mfr CAGE: 81361
Mfr Part Number: 5-77-3543
0001AA DETECTOR, CHEMICAL A 972 EA $ $ _____________________ ______________ __________________
COMMODITY NAME: DETECTOR, CHEMICAL A
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH0C0321EH PRON AMD: 04
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENT CLAUSEY
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at Origin means the contractor
MUST contact DCMA to arrange for a Government inspection BEFORE production under this CLIN is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at Destination. Rejected production will be returned at the contractor's expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV0003V800 W22PVJ J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 972 0300
FOB POINT: Destination
SHIP TO:
(W22PVJ) XU BLUE GRASS ARMY DEPOT
XU GEN SUP STORAGE PT CRP WHSE 211
431 BATTLEFIELD MEMORIAL HIGHWAY
RICHMOND,KY,40475-5070
Early delivery is authorized at no additional cost to the Government.
5 30
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative F001)
0001AB FIRST ARTICLE TEST AND REPORT 1 LO $ _____________________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TEST AND REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
FIRST ARTICLE TEST REPORT, PURSUANT TO THE
REQUIREMENTS OF THE CLAUSE ENTITILED "FIRST ARTICLE
APPROVAL (FAT) - CONTRACTOR TESTING," FAR CLAUSE
52.209-3 (SEE SECTION I)
FAT specifics can be found in section E.4.1. Please provide a price for each section 1-5 below with the total FAT price.
1. ___________
2. ___________
3. ___________
4. ___________
5.____________
TOTAL: ________________
DO NOT ADD THE FAT PRICE TO CLIN 0001AA OR 0002AA.
First Article Test Report (FATR) is due 180 days after award.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0180
6 30
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 DETECTOR, CHEMICAL
OPTION QUANTITY, PURSUANT TO THE CLAUSE ENTITLED
OPTION FOR INCREASED QUANTITY --- SEPARATELY PRICED
LINE ITEM
(52.217-7).
The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
(End of narrative A001)
0002AA UNEXERCISED OPTION CHEMICAL DETECTOR 318 01 $ $ ____________________________________ ______________ __________________
COMMODITY NAME: DETECTOR, CHEMICAL
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENT CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at Origin means the contractor
MUST contact DCMA to arrange for a Government inspection BEFORE production under this CLIN is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at Destination. Rejected production will be returned at the contractor's expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 318 0090
FOB POINT: Destination
SHIP TO:
7 30
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
Early delivery is authorized at no additional cost to the Government.
(End of narrative F001)
8 30
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1001 CONTRACT DATA REQUIREMENTS LIST _______________________________
CDRLS A001-A005 ARE FOUND IN SECTION J, LIST OF
ATTACHMENTS, EXHIBIT A.
(End of narrative A001)
A001 CDRL A001 - ENGINEERING CHANGE PROPOSAL (ECP) 1 LO $ ** NSP ** _____________________________________________ __________________
SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL
SUBMIT ELECTRONICALLY TO
USARMY.RIA.CCDC-CBC.MBX.CMACTION@MAIL.MIL
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
A002 CDRL A002 - REQUEST FOR VARIANCE (RFV) 1 LO $ ** NSP ** ______________________________________ __________________
SERVICE REQUESTED: REQUEST FOR VARIANCE (RFV)
SUBMIT ELECTRONICALLY TO
USARMY.RIA.CCDC-CBC.MBX.CMACTION@MAIL.MIL
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
A003 CDRL A003 - NOTICE OF REVISION (NOR) 1 LO $ ** NSP ** ____________________________________ __________________
SERVICE REQUESTED: NOTICE OF REVISION (NOR)
9 30
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUBMIT ELECTRONICALLY TO
USARMY.RIA.CCDC-CBC.MBX.CMACTION@MAIL.MIL
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
A004 CDRL A004- PRODUCTION LOT ACCEPTANCE TEST REPORT 1 LO $ ** NSP ** ________________________________________________ __________________
SERVICE REQUESTED: CONTRACTOR REPORT
REQUIREMENTS:
-QUALITY PLAN
-FOR NEW PRODUCTION LOTS
-TESTING MUST BE APPROVED
REFER TO CDRL A004 IN SECTION J FOR ADDITIONAL
INFORMATION.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
A005 CDRL A005 - CERTIFICATE OF COMPLIANCE (COC) 1 LO $ ** NSP ** ___________________________________________ __________________
SERVICE REQUESTED: CERTIFICATE OF COMPLIANCE
CERTIFICATE OF COMPLIANCE SHALL BE PROVIDED WITH
SUBMISSION OF FIRST ARTICLE TEST.
REFER TO SECTION J FOR ADDITIONAL INFORMATION.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 AS REQUIRED
10 30
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
@C.1. START OF WORK MEETING ___________________________
a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within 30 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort. The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.
b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within 15 days after the meeting is held (Refer to CDRL A001 for submission of meeting minutes).
C.2 TECHNICAL DATA PACKAGE INFORMATION_______________________________________
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X ] 2. The TDP for this solicitation resides within the Beta System for Award Management (SAM)(https://beta.SAM.gov)associated with this solicitation number:
W56HZV-20-Q-0061
To access the data through Beta.SAM:
a. Log on to the Beta.SAM web site: https://beta.SAM.gov .
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with
Defense Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract
Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. Beta.SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ . The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in Beta.SAM.
11 30
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
C.3. CONFIGURATION MANAGEMENT DOCUMENTATION___________________________________________
a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph
3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph e. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.
d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e(i) through e(iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) Documentation or use of DD Form 1692 (current revision)and delivery of data per DI-SESS-80639 is detailed in paragraph
3.3.1 of EIA-649-1.
(ii) Documentation or use of DD Form 1694 (current revision)and delivery of data per DI-SESS-80640 is detailed in paragraph
3.3.2 of EIA-649-1.
(iii) Documentation or use of DD Form 169 (current revision)and delivery of data per DI-SESS-80642 is detailed in paragraph
3.3.4 of EIA-649-1.
(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.
CDRLS can be found in Exhibit A, in Section J, List of Attachments.
f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.
g. The submission of an ECP/RFV/SCN/NOR, does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.
h. The contractor shall electronically transmit copies of all ECPs, NORs, RFVs, and VECPs to:
CCDC-CBC Engineering Office
OFFICE: FCDD-CBE-MP
EMAIL: usarmy.ria.ccdc-cbc.mbx.cmaction@mail.mil
FAX: (309) 782-4537
C.4. ENGINEERING EXCEPTIONS____________________________
1. Disregard the following on the TDPL
5-67-267
5-67-268
MIL-D-51410
MIL-D-51411
MIL-D-51412
MIL-DTL-51408
MIL-DTL-51409
MIL-DTL-51490
Outstanding Engineering Changes 843-0008-004 and 972-0046-001
2. The following items shall be furnished by the Government
M8 Paper (5-67-266)
M9 Paper (referenced on 5-77-3292)
Technical Manual (referenced on 5-77-3551)
12 30
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
3. A Safety Data Sheet (SDS) shall be prepared and furnished to the government upon request. A copy of the SDS shall also be included in every shipment of the M256A2 Training Kit.
4. The technical data contains Specifications and Standards that may have been canceled and/or superseded. Contractor is authorized to use materials that are certified to meet the canceled/superseded specifications and standards, or substitute materials that meet the superseding standards as identified by the DODISS. The government shall have final approval authority on substitute materials.
C.5. GOVERNMENT FURNISHED PROPERTY (GFP)Attachment 0002_______________________________________________________
The government shall furnish property to the contract or for use in the performance of this contract.
1. Delivery of GFP. GFP will be delivered to the producing facility as identified by the contractor in the place of performance and shipping point provision in Section G of the schedule, unless stated otherwise by the contractor.
2. Contractor inspection of GFP. The contractor shall inspect all GFP within 30 calendar days of its receipt. If the inspection reveals
GFP damages or discrepancies, the contractor shall obtain concurrence from the Government Property Accountability Specialist or Quality
Assurance Representative and notify the Procurement Contracting Officer (PCO).
3. Disposition of GFP. As soon as the GFP is no longer required and before contract closeout, the contractor shall request disposition instructions from the PCO. The contractor will notify the cognizant Government Property Accountability Specialist or Quality Assurance
Representative to arrange for inspection of the property before it is packed for return to the government.
(a) Repackaging and Repacking of GFP. The contractor is responsible for any repackaging and repacking of GFP required to comply with applicable specifications.
(b) Shipment of GFP. Within 30 calendar days after the contractor receives the applicable shipping instructions from the PCO
(or designated property representative), the contractor shall submit an original and three copies of DD Form 1659, Application for U.S. Government Shipping Documentation/Instructions, to the PCO.
4. Maintenance of GFP. The contractor shall properly maintain GFP and report to the Government Property Accountability Specialist or
Quality Assurance Representative and PCO the need for replacement and/or capital rehabilitation.
C.6 SHELF LIFE MARKINGS________________________
Non-extendable shelf life markings (e.g., A, B, C, etc.) are required for this procurement and shall be applied in accordance with MIL-
STD-129. The shelf life code is S . The shelf life markings shall include, as applicable: the Manufactured or Assembled or Cured Date:
(mo/yr), and the Expiration date (mo/yr. The Expiration date shall be 60 months in the future from the manufactured, cured, or assembled date. In accordance with DoDM 4140.27, Vol 1 and MIL-STD-129, an item shall have not less than 85 percent of shelf life remaining at time of receipt by the Government. Any part not having at least 85 percent shelf life remaining shall be considered non-conforming.
C.7. LOT NUMBERING___________________
Lot numbering shall be required following the protocol in MIL-STD-1168, Ammunition Lot Numbering and Ammunition Data Cards, as applicable.
Manufacturers shall contact usarmy.ria.ccdc-cbc.mbx.qa@mail.mil to obtain a unique manufacturer's identification symbol.
C.8 DRAWING LIMITATIONS_______________________
(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
(1) depict the completed item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and
13 30
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the
Government and no delivery schedule extension.
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D. PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
D.1. Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP.
PRESERVATION: MILITARY
LEVEL OF PACKING: -B
QUANTITY PER UNIT PACKAGE: -001-
SPI NUMBER1 P5-15-33943-50, DATED-12 FEB 18, REV ________________________________________
D.2. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
D.3. Marking: In addition to any special markings called out on the SPI;
D.3.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause
252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide and Supplier Implementation
Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
D.4. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard
Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection
Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
D.5. This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the
SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
D.6. Hazardous Materials (as applicable):
14 30
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
D.6.1. Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
D.6.2. Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
-International Air Transport Association (IATA) Dangerous Goods Regulations
-International Maritime Dangerous Goods Code (IMDG)
-Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
-Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).
D.6.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
D.6.4. When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
SUPPLEMENTAL INSTRUCTIONS:
SAFETY DATA SHEETS (SDS's) should be prepared by the contractor in accordance with
FED---STD---313 and be overpacked with each shipment of material.
PLACE A RED X AND THE WORDS SHORT BOX ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE MARKINGS
SHOWING ON THE TOP FRONT OF THE PALLET LOAD.
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
1 CHANGED 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
- not including paragraph 8.3
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
@E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN _____________________________________________
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
15 30
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2. REWORK AND REPAIR OF NONCONFORMING MATERIAL_________________________________________________
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E.3. USE OF MIL-STD 1916_________________________
a. The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL II for major characteristics and VL 1 for minor characteristics.
b. MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
E.4. FIRST ARTICAL TEST (FAT)_____________________________
The First Article sample shall consist of, (DWG: 5-77-3543, 10 SIMULATOR, CHEMICAL AGENT DETECTOR: TRAINING, M256A2 manufactured using the same methods, materials, equipment, and processes as will be used during regular production. The First Article sample shall contain no more than one lot of each component, material, and reagent identified in MIL-DTL-1.3. The samples shall be tested-inspected in accordance with MIL-DTL-32578, paragraph s 4.2, 4.2.2, table II and associated drawings, and specifications.
F.4.1 In MIL-DTL-3578, the first article sample items shall be examined in accordance with the classification of characteristics in
4.3.5 and inspected for compliance with all of the requirements of the applicable drawings (3.2).
PART 1. First article sample items shall then be inspected by test and examination in accordance with table II.
PART 2. Prior to performance testing, 4.4.5, samplers will first be exposed to environmental stress (4.4.7 - 4.4.9) and examined for defects. Certificate of Conformance (COC) shall be required for materials.
PART 3. Ampoule leakage test
PART 4. Potassium Carbonate Ampoule, High temperature stability test
PART 5. Cholinesterase Activity test
*Note: Each test is potentially destructive.*
Packaging of FIrst Article: The Packaged First Article shall consist of 30 unit pack containers and their Contents, shall consist of
16 30
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
three (3) empty unit pack barrier bags, and meet all the requirements of SPI P5-77-3543 and all applicable specifications. As determined by the Government, the samples shall be subject to any or all of the tests and inspections listed on the associated drawings, specifications and SPI.
The FAT report shall be reviewed by the Government QAR before submission to the Contracting Officer.
E.5. DESTRUCTIVE TESTING________________________
(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the Government as set forth in the Contract Schedule.
(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or in process testing, unless specifically authorized by the Contracting Officer.
(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
E.6. FIRST ARTICLE TESTING (CONTRACTOR) UTILIZATION OF ECBC LAB (TSA)______________________________________________________________________
(a) CLIN 0001AA and 0002AA - has a requirement for First Article Testing (CLIN 0001AB).
(b) The elements of First Article Testing (FAT) that can be performed by the Research Development & Engineering Command (RDECOM)
Chemical & Biological Center (C&B Center, Design Engineering & Test Facility (DE&TF) Rock Island. Contact the lab by email:
usarmy.ria.ecbc.mail.testfacility@mail.mil.
Prices are valid for 180 days after contract award. These prices shall be included in the total FAT price proposed.
(c) These elements may not be all inclusive of the FAT Requirements as stated in the solicitation. It is the successful offeror's responsibility to ensure that all FAT Requirements are met.
(d) It is not a requirement of this solicitation to utilize the ECBC Rock Island Lab, but an option available to all interested offerors.
(e) If it is determined that the C&B Center DE&TF, Rock Island, will be utilized for conducting any of the above testing, it is the successful contractors responsibility to contact the Chief, DE&TF to establish a Test Service Agreement (TSA) for necessary C&B center support. See contact information below.
Point of Contact for the ECBC Rock Island Lab is below:
Chief, DE&TF branch
RDECOM-C&B
Building 62
1 Rock Island Arsenal
Rock Island, IL 61299-7390 usarmy.ria.ecbc.mail.testfacility@mail.mil
(f) The TSA will not be part of the resultant contract, but an independent agreement between the contractor and C&B Center Rock Island.
Payment to C&B center will be the responsibility of the successful offeror.
(g) It is in the contractors best interest to contact the C&B Center DE&TF as soon after contract award as possible to start the TSA process. Delay in contract performance due to failure to contact the lab and make arrangements in a timely manner is not an excusable delay. A copy of the TSA Customer's Guide is provided as an attachment to help expedite the TSA process. Please coordinate with the
C&B Center Rock Island regarding Electronic Funds Transfer (EFT) payments.
(h) Contractor shall annotate below whether the ECBC Lab will be utilized for this requirement.
17 30
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
____ The C&B Center Lab will be utilized for this requirement.
____ The C&B Center Lab will not be utilized for this requirement.
E.7. PRODUCTION LOT TESTING (CONFORMANCE INSPECTION - Contractor)__________________________________________________________________
(a)The Contractor shall conduct production lot testing (PLT) for each production lot to be tendered to the Government for acceptance.
(b) The samples shall be selected, examined, and tested in accordance with MIL-STD 1916
(c) The samples shall be randomly selected from the entire lot by, or in the presence of, the Government Quality Assurance
Representative (QAR). The Contractor shall notify the QAR in writing at least five (5) workdays in advance, when the lot is ready for sample selection. The Contractor shall inspect production lots for conformance to the contracts requirements prior to selecting PLT samples.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .