W56HZV20Q0061-0004 Signed.pdf
PDF 82 KB Posted
- Attached to
- Chemical Detector Training Kit Federal contract opportunity
- Solicitation number
- W56HZV20Q0061
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W56HZV20Q0061-0003 signed.pdf | ||
| W56HZV20Q0061-0002 signed.pdf | ||
| Attachment 0001 GFP M256A2 TRAIN_Jan2020.pdf | ||
| W56HZV-20-Q-0061 signed.pdf | ||
| W56HZV20Q0061-0001 signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0004 2021JAN12
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
KATHY KESSLER
EMAIL: KATHY.A.KESSLER.CIV@MAIL.MIL
W56HZV-20-Q-0061
2020MAY04
X
X 2021JAN18 01:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 31
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: KATHY KESSLER
Buyer Office Symbol/Telephone Number: CCTA-APS-A/(586)282-7228
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of Amendment 0004 to solicitation W56HZV20Q0061 is to do the following:
1. Solicitation Closing date is changing from 15 January 2021 to 18 January 2021.
2. Change 100% SBSA to full and open competition.
3. Total 3 year IDIQ maximum quantity to procure is reduced by 29,000 kits from 32,000 to 3,000 kits.
4. CLIN 0001AB, add FAT Testing information to Section B: Part 1-5.
5. Adjust range pricing for CLINs 0011, 0012, & 0013.
6. Remove C.2, Government Furnished Property: M8 Paper, M9 Paper, and Technical Manual.
7. Remove C.5, Attachment 0002 Government Furnished Property and C.5.1-4.
8. Attachment 0001 & 0002 - Government Furnished Property in Section J, List of Attachments shall be deleted and Attachment 0003 - FAT
Waiver Request is being added.
9. Except for stated here-in, all other terms and conditions of this solicitation remains the same.
*** END OF NARRATIVE A0003 ***
2 31
W56HZV-20-Q-0061
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 FIRST ARTICLE TEST AND REPORT
IN THE FOUR-DIGIT ITEM NUMBERS (CLINS) THAT FOLLOW,
THE NUMBERING SYSTEM THAT IS USED IS AS FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY ITEM AND THE FOURTH
(LAST) DIGIT SIGNIFIES THE APPLICABLE ORDERING YEAR,
i.e., CLIN 0011 IS FOR THE FIRST ORDERING YEAR, CLIN
0012 IS FOR THE SECOND ORDERING YEAR, CLIN 0013 IS FOR
THE THIRD ORDERING YEAR.
THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE
SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE OF
AWARD PLUS 364 DAYS.
SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS
THROUGH 729 DAYS AFTER CONTRACT AWARD.
THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS
THROUGH 1,094 DAYS AFTER CONTRACT AWARD.
*NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER IS
THE PRICE FOR THE ORDERING YEAR IN WHICH THE ORDER IS
ISSUED. THE DELIVERY DATE DOES NOT DETERMINE THE
ORDERING YEAR.
Minumum 3 year Quantity: 500 kits
Maximum 3 year quantity: 3,000 kits
3 31
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative A001)
0001AB FIRST ARTICLE TEST AND REPORT 1 LO $ ______________________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TEST AND REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
FIRST ARTICLE TEST REPORT, PURSUANT TO THE
REQUIREMENTS OF THE CLAUSE ENTITILED "FIRST ARTICLE
APPROVAL (FAT) - CONTRACTOR TESTING," FAR CLAUSE
52.209-3 (SEE SECTION I)
FAT specifics can be found in section E.4.1. Please provide a price for each section 1-5 below with the total FAT price.
1. ___________
2. ___________
3. ___________
4. ___________
5.____________
TOTAL: ________________
DO NOT ADD THE FAT PRICE TO CLIN 0011, 0012, or 0013.
First Article Test Report (FATR) is due 180 days after award.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
4 31
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0011 YEAR 1: CHEMICAL AGENT DETECTOR TRAINING $ ________________________________________ __________________
See Range Pricing
NSN: 6665-01-663-5355
COMMODITY NAME: DETECTOR, CHEMICAL AGENT
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81361
Mfr Part Number: 5-77-3543
PROGRAM YEAR: 1
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
1 500 $
501 1000 $
1001 1500 $
1501 3000 $
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
REFER TO SPI P5-77-3543
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at Origin means the contractor
MUST contact DCMA to arrange for a Government inspection BEFORE production under this CLIN is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at Destination.
Rejected production will be returned at the contractor's expense.
(End of narrative E001)
Refer to FAR Clause 52.211-8 Time of Delivery for delivery schedule.
(End of narrative F001)
5 31
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0012 YEAR 2: CHEMICAL AGENT DETECTOR TRAINING $ ________________________________________ __________________
See Range Pricing
NSN: 6665-01-663-5355
COMMODITY NAME: DETECTOR KIT, CHEMICAL AGENT
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81361
Mfr Part Number: 5-77-3543
PROGRAM YEAR: 2
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
1 500 $
501 1000 $
1001 1500 $
1501 3000 $
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
P5-77-3543
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at Origin means the contractor
MUST contact DCMA to arrange for a Government inspection BEFORE production under this CLIN is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at Destination. Rejected production will be returned at the contractor's expense.
(End of narrative E001)
Refer to FAR Clause 52.211-8 Time of Delivery for delivery schedule.
(End of narrative F001)
6 31
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0013 YEAR 3: CHEMICAL AGENT DETECTOR TRAINING SIM $ ____________________________________________ __________________
See Range Pricing
NSN: 6665-01-663-5355
COMMODITY NAME: CHEMICAL DETECTION AGENT KIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81361
Mfr Part Number: 5-77-3543
PROGRAM YEAR: 3
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
1 500 $
501 1000 $
1001 1500 $
1501 3000 $
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
P5-77-3543
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at Origin means the contractor
MUST contact DCMA to arrange for a Government inspection BEFORE production under this CLIN is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at Destination. Rejected production will be returned at the contractor's expense.
(End of narrative E001)
Refer to FAR Clause 52.211-8 Time of Delivery for delivery schedule.
(End of narrative F001)
7 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
@C.1. START OF WORK MEETING ___________________________
a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within 30 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort. The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.
b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within 15 days after the meeting is held (Refer to CDRL A001 for submission of meeting minutes).
C.2 TECHNICAL DATA PACKAGE INFORMATION_______________________________________
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X ] 2. The TDP for this solicitation resides within the Beta System for Award Management (SAM)(https://beta.SAM.gov)associated with this solicitation number:
W56HZV-20-Q-0061
To access the data through Beta.SAM:
a. Log on to the Beta.SAM web site: https://beta.SAM.gov .
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with
Defense Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract
Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. Beta.SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ . The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in Beta.SAM.
8 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
C.3. CONFIGURATION MANAGEMENT DOCUMENTATION___________________________________________
a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph
3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph e. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.
d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e(i) through e(iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) Documentation or use of DD Form 1692 (current revision)and delivery of data per DI-SESS-80639 is detailed in paragraph
3.3.1 of EIA-649-1.
(ii) Documentation or use of DD Form 1694 (current revision)and delivery of data per DI-SESS-80640 is detailed in paragraph
3.3.2 of EIA-649-1.
(iii) Documentation or use of DD Form 169 (current revision)and delivery of data per DI-SESS-80642 is detailed in paragraph
3.3.4 of EIA-649-1.
(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.
CDRLS can be found in Exhibit A, in Section J, List of Attachments.
f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.
g. The submission of an ECP/RFV/SCN/NOR, does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.
h. The contractor shall electronically transmit copies of all ECPs, NORs, RFVs, and VECPs to:
CCDC-CBC Engineering Office
OFFICE: FCDD-CBE-MP
EMAIL: usarmy.ria.ccdc-cbc.mbx.cmaction@mail.mil
FAX: (309) 782-4537
C.4. ENGINEERING EXCEPTIONS____________________________
1. Disregard the following on the TDPL
5-67-267
5-67-268
MIL-D-51410
MIL-D-51411
MIL-D-51412
MIL-DTL-51408
MIL-DTL-51409
MIL-DTL-51490
Outstanding Engineering Changes 843-0008-004 and 972-0046-001
2. Removed in Amendment 0004.
3. A Safety Data Sheet (SDS) shall be prepared and furnished to the government upon request. A copy of the SDS shall also be included in every shipment of the M256A2 Training Kit.
9 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
4. The technical data contains Specifications and Standards that may have been canceled and/or superseded. Contractor is authorized to use materials that are certified to meet the canceled/superseded specifications and standards, or substitute materials that meet the superseding standards as identified by the DODISS. The government shall have final approval authority on substitute materials.
C.5. Removed in Amendment 0004______________________________
C.6 SHELF LIFE MARKINGS________________________
Non-extendable shelf life markings (e.g., A, B, C, etc.) are required for this procurement and shall be applied in accordance with MIL-
STD-129. The shelf life code is S . The shelf life markings shall include, as applicable: the Manufactured or Assembled or Cured Date:
(mo/yr), and the Expiration date (mo/yr. The Expiration date shall be 60 months in the future from the manufactured, cured, or assembled date. In accordance with DoDM 4140.27, Vol 1 and MIL-STD-129, an item shall have not less than 85 percent of shelf life remaining at time of receipt by the Government. Any part not having at least 85 percent shelf life remaining shall be considered non-conforming.
C.7. LOT NUMBERING___________________
Lot numbering shall be required following the protocol in MIL-STD-1168, Ammunition Lot Numbering and Ammunition Data Cards, as applicable.
Manufacturers shall contact usarmy.ria.ccdc-cbc.mbx.qa@mail.mil to obtain a unique manufacturer's identification symbol.
C.8 DRAWING LIMITATIONS_______________________
(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
(1) depict the completed item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the
Government and no delivery schedule extension.
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D. PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
D.1. Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP.
PRESERVATION: MILITARY
LEVEL OF PACKING: -B
QUANTITY PER UNIT PACKAGE: -001-
SPI NUMBER1 P5-15-33943-50, DATED-12 FEB 18, REV ________________________________________
10 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
D.2. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
D.3. Marking: In addition to any special markings called out on the SPI;
D.3.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause
252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide and Supplier Implementation
Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
D.4. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard
Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection
Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
D.5. This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the
SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
D.6. Hazardous Materials (as applicable):
D.6.1. Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
D.6.2. Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
-International Air Transport Association (IATA) Dangerous Goods Regulations
-International Maritime Dangerous Goods Code (IMDG)
-Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
-Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).
D.6.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
D.6.4. When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
SUPPLEMENTAL INSTRUCTIONS:
SAFETY DATA SHEETS (SDS's) should be prepared by the contractor in accordance with
FED---STD---313 and be overpacked with each shipment of material.
11 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PLACE A RED X AND THE WORDS SHORT BOX ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE MARKINGS
SHOWING ON THE TOP FRONT OF THE PALLET LOAD.
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
@E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN _____________________________________________
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2. REWORK AND REPAIR OF NONCONFORMING MATERIAL_________________________________________________
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E.3. USE OF MIL-STD 1916_________________________
a. The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL II for major characteristics and VL 1 for minor characteristics.
b. MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
12 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.4. FIRST ARTICAL TEST (FAT)_____________________________
The First Article sample shall consist of, (DWG: 5-77-3543, 10 SIMULATOR, CHEMICAL AGENT DETECTOR: TRAINING, M256A2 manufactured using the same methods, materials, equipment, and processes as will be used during regular production. The First Article sample shall contain no more than one lot of each component, material, and reagent identified in MIL-DTL-1.3. The samples shall be tested-inspected in accordance with MIL-DTL-32578, paragraph s 4.2, 4.2.2, table II and associated drawings, and specifications.
In MIL-DTL-32578, the first article sample items shall be examined in accordance with the classification of characteristics in 4.3.5 and inspected for compliance with all of the requirements of the applicable drawings (3.2).
PART 1. First article sample items shall then be inspected by test and examination in accordance with table II.
PART 2. Prior to performance testing, 4.4.5, samplers will first be exposed to environmental stress (4.4.7 - 4.4.9) and examined for defects. Certificate of Conformance (COC) shall be required for materials.
PART 3. Ampoule leakage test
PART 4. Potassium Carbonate Ampoule, High temperature stability test
PART 5. Cholinesterase Activity test
*Note: Each test is potentially destructive.*
Packaging of FIrst Article: The Packaged First Article shall consist of 30 unit pack containers and their Contents, shall consist of three (3) empty unit pack barrier bags, and meet all the requirements of SPI P5-77-3543 and all applicable specifications. As determined by the Government, the samples shall be subject to any or all of the tests and inspections listed on the associated drawings, specifications and SPI.
The FAT report shall be reviewed by the Government QAR before submission to the Contracting Officer.
E.5. DESTRUCTIVE TESTING________________________
(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the Government as set forth in the Contract Schedule.
(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or in process testing, unless specifically authorized by the Contracting Officer.
(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
E.6. FIRST ARTICLE TESTING (CONTRACTOR) UTILIZATION OF ECBC LAB (TSA)______________________________________________________________________
(a) CLIN 0001AA and 0002AA - has a requirement for First Article Testing (CLIN 0001AB).
(b) The elements of First Article Testing (FAT) that can be performed by the Research Development & Engineering Command (RDECOM)
Chemical & Biological Center (C&B Center, Design Engineering & Test Facility (DE&TF) Rock Island. Contact the lab by email:
usarmy.ria.ecbc.mail.testfacility@mail.mil.
Prices are valid for 180 days after contract award. These prices shall be included in the total FAT price proposed.
(c) These elements may not be all inclusive of the FAT Requirements as stated in the solicitation. It is the successful offeror's responsibility to ensure that all FAT Requirements are met.
13 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) It is not a requirement of this solicitation to utilize the ECBC Rock Island Lab, but an option available to all interested offerors.
(e) If it is determined that the C&B Center DE&TF, Rock Island, will be utilized for conducting any of the above testing, it is the successful contractors responsibility to contact the Chief, DE&TF to establish a Test Service Agreement (TSA) for necessary C&B center support. See contact information below.
Point of Contact for the ECBC Rock Island Lab is below:
Chief, DE&TF branch
RDECOM-C&B
Building 62
1 Rock Island Arsenal
Rock Island, IL 61299-7390 usarmy.ria.ecbc.mail.testfacility@mail.mil
(f) The TSA will not be part of the resultant contract, but an independent agreement between the contractor and C&B Center Rock Island.
Payment to C&B center will be the responsibility of the successful offeror.
(g) It is in the contractors best interest to contact the C&B Center DE&TF as soon after contract award as possible to start the TSA process. Delay in contract performance due to failure to contact the lab and make arrangements in a timely manner is not an excusable delay. A copy of the TSA Customer's Guide is provided as an attachment to help expedite the TSA process. Please coordinate with the
C&B Center Rock Island regarding Electronic Funds Transfer (EFT) payments.
(h) Contractor shall annotate below whether the ECBC Lab will be utilized for this requirement.
____ The C&B Center Lab will be utilized for this requirement.
____ The C&B Center Lab will not be utilized for this requirement.
E.8 SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING)______________________________________________________________________________
(a) In accordance with the requirements under FAR clause 52.209-3, found in Amendment 0001, Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
14 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to -1-.
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
E.8. PRODUCTION LOT TESTING (CONFORMANCE INSPECTION - Contractor)__________________________________________________________________
(a)The Contractor shall conduct production lot testing (PLT) for each production lot to be tendered to the Government for acceptance.
(b) The samples shall be selected, examined, and tested in accordance with MIL-STD 1916
(c) The samples shall be randomly selected from the entire lot by, or in the presence of, the Government Quality Assurance
Representative (QAR). The Contractor shall notify the QAR in writing at least five (5) workdays in advance, when the lot is ready for sample selection. The Contractor shall inspect production lots for conformance to the contracts requirements prior to selecting PLT samples. Unless otherwise authorized by the Contracting Officer, test samples shall not be submitted pursuant to this provision where the Contractor has determined that the lot does not conform to all contract requirements.
(d) Within 5 days of completing PLT on any given lot, the Contractor shall deliver to the Government a report that documents whether production lots conform to PLT requirements. The PLT report shall verify whether all required inspections and tests have been completed successfully. The report shall be submitted to the Government in accordance with CDRL in Section J.
(e) Within 10 workdays after receipt of the PLT report by the government, the government will notify the Contractor in writing whether the specific lot has been approved, conditionally approved, or rejected. The Contractor shall maintain PLT report(s) for a period of two years after contract expiration, during which time they shall be available for Government review.
(f) If the PLT sample fails to meet any contractual requirement, the lot from which the test samples were drawn shall be rejected by the
Government. In that event, the Contractor shall take immediate corrective action at no increase in the contract price, and shall submit an additional PLT sample (from the reworked lot or from a new lot) for inspection. Corrective action shall apply to all items including, if applicable, basic items, repair parts, and in-process or final assembly items produced or in production since the last successful production lot test.
(g) PLT samples not consumed or destroyed in testing may be delivered as part of the production quantities due under the contract.
E.9. ALTERNATIVES TO LOT ACCEPTANCE SAMPLING (INCLUDING STATISTICAL PROCESS CONTROL (SPC))___________________________________________________________________________________________
(a) Offerors are encouraged to propose a defect prevention strategy in lieu of lot acceptance inspection and testing requirements cited in the technical data package. The Government recognizes that industry has developed numerous prevention based strategies which result in reduced process variation and promote continuous process improvement initiatives. Use of alternatives to lot acceptance sampling can provide offerors the latitude of implementing prevention based programs that are suitable to their particular mode of operation.
Offerors are encouraged to submit their alternative proposals prior to award. Although the Government will entertain post award requests, there is no guarantee such requests will be accepted.
(b) Requests to use alternatives to lot acceptance sampling shall be provided to the Contracting Officer for review and approval or disapproval. Such requests shall include:
(1) Identification of the specific inspections and tests to be reduced or eliminated.
(2) A description of your prevention based program. This should include such topics as a training program and the performance of audits.
(3) A description of the tools used to monitor and control the specific processes being evaluated. This should include such topics as criteria for determining out of control conditions and procedures to be used when an out of control condition is detected.
15 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(4) The results of a process performance study, and if available, the results of a process capability study.
(5) For SPC data to be used as an alternative to lot acceptance sampling, the following conditions shall be met:
(i) The process is in a state of statistical control using SPC control chart methods.
(ii) Variable data: for Critical characteristics a CPK =/> 2.00 (or equivalent capability) is achieved; for Major characteristics a CPK =/> 1.33 (or equivalent capability) is achieved.
(iii) Attribute data: for Critical Characteristics a process average of 100% of the product conforming to the specification; for Major Characteristics a process average of 99.9937% of the product conforming to the specification.
(c) Proposals offered after award. The Contracting Officer is responsible for accepting or rejecting the alternate lot acceptance procedure submitted by the contractor. The contractor may submit an alternate lot acceptance procedure at any time during the performance of this contract. The Contracting Officer is responsible for accepting or rejecting the alternate procedure within 30 days of receipt. If the Government needs more time to evaluate the alternate procedure, the Contracting Officer shall notify the contractor in writing, giving the reasons and the anticipated decision date. The contractor may withdraw its proposal at any time prior to its incorporation by contract modification. Because offerors may withdraw their proposal at any time, the Contracting Officer's failure to timely accept or reject the proposal shall not constitute grounds for claim against the Government. Any proposed and accepted procedure must be incorporated by contract modification. If the alternate procedure is not accepted, the Contracting Officer shall provide the contractor with written notification, explaining the reasons for rejection.
(d) Any equitable adjustment resulting from approval of an alternate lot acceptance procedure described in paragraph (c) above will be handled in accordance with the Changes clause of this contract.
(e) Until notification is received, the contractor is required to perform under this contract in accordance with the requirements herein, including lot acceptance inspection and testing.
E.10 REQUIRED CONFORMANCE INSPECTION_____________________________________
In addition to other inspection and acceptance terms of this contract, the Contractor is required to perform Conformance inspection of the following listed Production Supply Items IAW MIL-DTL-32578, paragraphs 4.3 and 4.3.5:
i. 4.3.5 (a) Sampler Sub-Assembly Part number: 5-77-2916
ii. 4.3.5 (b) Sampler Assembly Part Number: 5-77-2917
iii. 4.3.5 (c) Sampler Assembly, Bagged Part Number: 5-77-2915
iv. 4.3.5 (d) Bag Part Number 5-77-2910
v. 4.3.5 (e) Direction Card Part Number 5-77-3548
vi. 4.3.5 (f) Training Kit Instruction Card Part Number 5-77-3549
vii. 4.3.5 (g) Simulator, Chemical Agent Detector: Training, M256A2 PN: 5-77-3543
viii. 4.3.5(h) Training Disc Part Number: 5-77-3555
The Contractor shall provide the Conformance inspection Report to the Government's Quality Assurance Representative, or other designated representative, prior to Government acceptance of any lot. A separate PLAT Report is required for each production lot, and for each listed Production Supply Item. The Conformance inspection Report shall comply with MIL-HDBK-831. The PLAT Report: A copy of all vendor
Certificates of Conformance (COC) shall be included in the Conformance inspection Report. All test and inspection results shall be fully documented. In the event of critical or major defect being detected during final acceptance inspection, a detailed root cause analysis and corrective action plan, to include implementation milestones, if applicable, shall be attached to the Conformance inspection Report. Unless otherwise specified in the classification of characteristics, the sampling and acceptance criteria for critical characteristics shall be in accordance with the Critical characteristics paragraph of MIL-STD-1916.
*** END OF NARRATIVE E0001 ***
DELIVERIES OR PERFORMANCE
F.1__ DEPOT ADDRESS FOR THE APPLICABLE MODE OF SHIPMENTS: IN-THE-CLEAR ADDRESSES
Rail/ MILSTRIP
Motor Address Rail Motor Parcel Post
SPLC* Code Ship To: Ship To: Mail To:_____ ____________ ________ ________ ________
16 31
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
206721/ W25G1U Transportation Officer Transportation Officer Transportation Officer
209405 Defense Dist Depot Defense Dist Depot Defense Dist Depot
Susquehanna Susquehanna Susquehanna
New Cumberland, PA New Cumberland, PA New Cumberland, PA
17070-5001
NOTE: All deliveries to New Cumberland MUST be scheduled at least 10 days prior to the delivery date. The carrier or contractor must call the New Cumberland DDSP customer service number, 800-307-8496 and provide the following information: contract number, item name, National Stock Number, total weight and cube, and vendor.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .