Attachment 0001 LMI Provisioning Data Analysis.docx
DOCX document 23 KB Posted
- Attached to
- System Technical Support (STS)
- Solicitation number
- W56HZV-19-R-0122
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 0005 Service Bulletin Board Log.xlsx | XLSX spreadsheet | |
| Attachment 0006 TMCR.doc | DOC document | |
| EXHIBIT B_CDRLS_A036 thru A044.DOCX | DOCX document | |
| EXHIBIT A_CDRLS_A001 thru A035.docx | DOCX document | |
| Attachment 0004 List of CDRLs.xlsx | XLSX spreadsheet | |
| Attachment 0002 MIL-STD-31000B Option Selection Worksheet.pdf | ||
| W56HZV19R0122_PADDS_Closing date of 21JAN2020_1 pm.pdf | ||
| Attachment 0003 ECPs_01OCT2019.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LMI Summary Worksheet Attachment 0001
SUMMARY TITLE: Provisioning Data Analysis
SPECIFIC INSTRUCTIONS: The contractor shall document a Maintenance Analysis Summary for the system. This summary will identify each repairable item and may be used to verify that the maintenance actions and support structures are aligned with the government’s requirements and maintenance concept. The analysis will be conducted and documented in end item hardware breakdown sequence, and all parts and support equipment will have LSA Control Numbers assigned (LCN). Functional Group Codes WILL/WILL NOT be used. The summary should identify all preventive and corrective maintenance actions along with the required spares and support equipment to perform each maintenance task. All tasks recommended for training will be identified. The Annual Maintenance Man-hour data will be used to prepare the BOIP Feeder Data. The summary data shall also be used to develop the Maintenance Allocation Chart (MAC). The following data elements are required. The Contractor may add additional data elements as desired.
DATA IN LMI SPECIFICATION (Please provide the data product title):
LMI 0140 COMMERCIAL GOVERNMENT ENTITY(CAGE) CODE
LMI 1050 REFERENCE NUMBER (Part Number) (Include both Prime and Supplier Part Numbers)
LMI 0370 INDENTURE CODE
LMI 0480 ITEM NAME
LMI 0690 NEXT HIGHER ASSY PROVISIONING LIST ITEM SEQUENCE NUMBER (NHA PLISN) (If assigned) LMI 0890 PROVISIONING LIST ITEM SEQUENCE NUMBER (PLISN) (If assigned)
LMI 1220 SOURCE, MAINTENANCE AND RECOVERABILITY (SMR) CODE
LMI 1500 UNIT OF ISSUE PRICE (UI PRICE) Based on a Lot of 100 Units
DATA NOT IN LMI SPECIFICATION (Please provide the data product title, its definition and its format):
1. Logistics Support Analysis (LSA) Control Number (LCN)
2. Maintenance Function (i.e., inspect, replace, repair, etc.)
3. Task Code (see guidance on page 2)
4. Task Times by Level of Maintenance, they are: Field (which includes: C-Crew, O-Service and F-Field) and Sustainment (which includes H-Below depot, L-Special Repair Activity and D-Depot). Use clock hours to one decimal place.
5. Common Tool Requirements-use common tool sets only, not individual tools.
6. Special Tools Requirements by Maintenance Task. Include Vendor, Part Number, and Cost (US Dollars, Based on a Lot of 100 Units).
7. Number of Personnel Required to Accomplish the Task.
8. Task Frequency (annual occurrence to two decimal places).
9. Military Occupational Specialty (MOS)*.
10. Annual Maintenance Man Hours (AMMH) = #4 X #7 X #8 above.
11. Tasks recommended for training.
12. Top 100 Critical Parts
13. NMWR Candidate Item Notes: 1. Contractor’s format using Microsoft Excel.
2. Additional data elements may be added at contractor’s discretion.
*Government Provided.
SUMMARY LAYOUT Contractor Provided
Task Code Guidance
1. The Task Code shall contain three (3) characters consisting of a Task Action Code, Task Interval Code and Task Level Code.
a. Task Action Codes authorized for use.
| (1) | LSA TASK CODE | DEFINITION | |
| A | Inspect - To determine the serviceability of an item by comparing its physical, mechanical or electrical characteristics with established standards through examination. |
B Test - To verify serviceability and detect incipient failure by measuring the mechanical or electrical characteristics of an item and comparing those characteristics with prescribed standards.
C Service - Operation required periodically to keep an item, in proper operating condition; i.e., to clean (decontaminate), to preserve, to drain, to paint, or to replenish fluids, or compressed air supplies.
D Adjust - To maintain, within prescribed limits, by bringing into proper or exact position, or by setting the operating characteristics to specified parameters levels.
F Calibrate - To re-program a digital LRU/SRU. This involves programming to a new software revision level.
Note: Reprogramming tasks are to be coded as “calibrate” tasks, with nomenclature for the task per definition above, i.e., a reprogram task will be coded as a F calibrate task, but titled as “reprogram”.
G Remove/Install – To perform the operation necessary to gain access to an item of the next lower level of indenture, or to an item blocking accessibility to the item under analysis. This code should also be used to document tasks removing or installing AAL or BII items.
L Rebuild - Consists of those services/actions necessary for the restoration of unserviceable equipment to a “like new” condition in accordance with the original manufacturing standards. Rebuild is the highest degree of material maintenance applied to Army equipment. The rebuild operation includes the act of returning to zero those age measurements (hours/miles, etc.) considered in classifying Army equipment/components.
J* Repair - The application of maintenance services or other maintenance actions to restore serviceability to an item by correcting specific damage, fault, malfunction, or failure in a part, sub-assembly, module (component or assy), end item or system.
H* Replace - The act of substituting like type part, sub-assy, or module (component of assembly), for an unserviceable counterpart.
N Fault Location - The process of investigating and detecting the cause of equipment malfunctioning, or the act of isolating a fault within a system or Unit Under Test.
* Replace vs. Repair task definitions.
(2) Task Code Clarifying Guidance
| (a) | Align Tasks are to be coded as Adjust tasks, with nomenclature for the task per definition above, i.e., an align task will be coded as a "D" Adjust task, but titled as "Align" task. |
| (b) | Reprogramming tasks are to be coded as "calibrate" tasks, with nomenclature for the task per definition above, i.e., a reprogram task will be coded as an "F" calibrate task, but titled as "reprogram". |
| (c) | Separate Remove and Install tasks will not be required. Only integrated Remove/Install tasks using G Install will be utilized for: The act of placing, seating, or fixing into position an item, part, or module (component of assembly in manner to allow the proper functioning of an equipment or system). |
| (d) | Replace "H" coded tasks shall be prepared only for repairable items. A nonrepairable item that is substituted for its nonrepairable, unserviceable counterpart shall constitute a "J" coded task to be prepared against the next higher assembly LCN. |
| (e) | Repair "J" coded tasks are not to consume repairable items. An item listed with an Item Category Code (ICC) of "Y" for a repair task coded "J" must be a repair part that may be replaced during the maintenance task. If an assembly or subassembly contains several nonrepairable wear-out parts and the sequence for fault isolation and replacement of any of those worn-out parts is essential, the same process for each wear-out part preparation of a single "J" coded repair task shall be considered sufficient for documentation purposes. |
b. Task Interval Codes authorized for use
| LSA TASK | |||
| (1) | INTERVAL CODE | DEFINITION | |
| A | Preoperative – Inspection accomplished prior to the first operation of the day. | ||
| B | Scheduled – Inspection/corrective action task performed on a scheduled basis that does not have its own Task Interval Code. Task frequency shall reflect the scheduled nature of the task. | ||
| D | During Operation – Occurring during each operation. | ||
| G | Unscheduled – Those predictable maintenance requirements that had not been previously planned, but require prompt attention to maintain the system in or restore it to operating condition. | ||
| H | Postoperative – Inspection accomplished after each operation. | ||
| J | Emergency – Resulting from an unforeseen combination of circumstances that calls for immediate action to prevent injury to personnel and/or damage to equipment. | ||
| K | Normal – Operational tasks part of the normal operating environment of the system. | ||
| L | Weekly – Inspection/services performed on a weekly basis. | ||
| M | Quarterly – Inspection/service performed on a quarterly basis. | ||
| N | Semiannual – Inspection/service performed on a semiannual basis. | ||
| P | Monthly – Inspection/service performed on a monthly basis. | ||
| Q | Yearly – Inspection/service performed on an annual basis. |
c. Task Level Codes authorized for use
| MAINT. | ||
| LEVEL CODE | DEFINITION | |
| C | Crew/Operator | |
| F | Field Maintenance | |
| H | Sustainment Maintenance | |
| L | Specialized Repair Activity, including vendor | |
| D | Depot Maintenance (overhaul/rebuild) |