W56HZV19R0015-0001.pdf
PDF 39 KB Posted
- Attached to
- 1670-01-097-8816; p/n 11-1-1487-2; Cargo Release Assembly, Cargo Parachute, Airdrop, M-1
- Solicitation number
- W56HZV-19-R-0015
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV19R0015-0002.pdf | ||
| W56HZV19R0015__Full_solicitation_with_Amendment_0001.pdf | ||
| 04_April_2019_Responses_to_Questions.docx | DOCX document | |
| 11-1-1499revF.pdf | ||
| Contractor_Questions_&_Answers.docx | DOCX document | |
| Attachment_0002_-_FAT_WAIVER_WORKSHEET.pdf | ||
| W56HZV-19-R-0015.pdf | ||
| QP_11-1-1487_Release_Assembly,_Cargo_Parachute,_Airdrop,_M-1.pdf | ||
| TDP__11-1-1487_Rev_U.zip | ZIP file | |
| M1_Release_-_Cargo_Parachute_image.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2019APR04
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
DAWN M. HESSELL
EMAIL: DAWN.M.HESSELL.CIV@MAIL.MIL
W56HZV-19-R-0015
2019MAR13
X
X 2019APR21
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 16
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DAWN M. HESSELL
Buyer Office Symbol/Telephone Number: CCTA-ALS-E/(586)282-5844
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
AMENDMENT 0001
1. The purpose of Amendment 0001 is to make the following changes.
2. First Article Test
The Fist Article Test CLIN is changed from Not Separately Priced (NSP) to a priced CLIN.
CLIN 0016 is deleted. The new FAT CLIN is 0018
3. Section E clause, Inspection and Acceptance (First Article Approval) ES6333. CLIN 0016 changed to
CLIN 0018.
4. Section F clause, FAR 52.211-8 Time of Delivery. CLIN revised from 0016 to 0018.
5. Section M clause, Evaluation Factors for First Article Test Requirement Indefinite Quantity
Contract MS6314. CLIN revised from 0016 to 0018.
6. Section J: Exhibit A, CDRL A001: CLIN revised from 0016 to 0018
7. Solicitation closing date is extended.
8. All other terms and conditions of the solicitation remain unchanged.
SOLICITATION NARRATIVE
This procurement is for:
Noun: Cargo Release Assembly, Cargo Parachute, Airdrop, M-1
NSN: 1670-01-097-8816
P/N: 11-1-1487-2
5 Year Long Term Contract (LTC)
Type of Contract: Firm fixed price (FFP)
Indefinite Delivery Indefinite Quantity (IDIQ)
Guaranteed Minimum Quantity: 42
Max 5 year quantity: 1,253
Anticipated first delivery order quantity: 334
Procurement is 100% Small Business Set-aside
Technical Data Package (TDP):
Distribution Level: A
A link to the TDP is available in FBO. Use the TDP uploaded with this solicitation. The TDP was approved on 07 September 2018.
Federal Acquisition Regulation (FAR) Clause 52.246-11 Higher Level Contract Quality System is required. Contractor must be ISO
9001:2008 compliant.
First Article Test (FAT) is required. Request for a FAT waiver may be approved. FAT waiver must be submitted with your proposal in
2 16
W56HZV-19-R-0015
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
accordance with Section L, LS7304, Provision for Waiver of Required First Article Approval. Use Attachment 0002 FAT Waiver Worksheet with your request.
MIL-STD 1916 is required, see Section E, ES6019
All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically via FBO.
SECTION A PROVISIONS
Electronic Contracting AS6311
(a) All Army Contracting Command Warren solicitations will be publicized on the Federal Business Opportunities website
(https://www.fbo.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online FBO bid submission:
(1) Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
(2) Vendors must be registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
(3) Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
(4) FBO will send an email to vendors registered email address confirming the electronic submission.
(5) For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide Section 4.3.1
Submitting an Electronic Response (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf ).
Note to offerors:
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments
3 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
ACKNOWLEDGEMENT OF AMENDMENTS AS7001
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
0001 ___________ __________________
ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON AS7040
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
ALL OR NONE AS7316
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
ACCEPTANCE APPENDIX (AS6850)
(a) Contract Number W56HZV- -1- is awarded to -2- .
(b) The contractor, in its proposal, provided data for various solicitation clauses, and that data has been added in this contract.
(c) Any attachments not included within this document will be provided by TACOM-Warren directly to the administrative contracting officer (ACO) via e-mail as required. Technical data packages that are only available on CD-ROM will be mailed by TACOM-Warren to the
ACO. Within one week of this award, any office not able to obtain these attachments from TACOM's website
(https://contracting.tacom.army.mil/ ) and still requiring a copy, can send an e-mail request to the buyer listed on the front page of this contract.
4 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
-3-
(d) The following Amendment(s) to the solicitation are incorporated into this contract: -4-
*** END OF NARRATIVE A0001 ***
5 16
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0016 DELETED _______
0018 FIRST ARTICLE TEST & REPORT - SEPARATELY PRICED EA $ $ _______________________________________________ ______________ __________________
NSN: 1670-01-097-8816
COMMODITY NAME: M-1 CARGO RELEASE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81337
Mfr Part Number: 11-1-1487-2
A FIRST ARTICLE TEST AND REPORT IS REQUIRED IN
ACCORDANCE WITH THE FAR CLAUSE 52.209-3 "FIRST
ARTICLE APPROVAL-- "CONTRACTOR TESTING,". CDRL A001
THE REQUEST FOR FAT WAIVER AND ATTACHMENT 0002 "FAT
WAIVER WORKSEHET" MUST BE SUBMITTED WITH YOUR
PROPOSAL IN ACCORDANCE WITH LS7304. REQUESTS FOR
FAT WAIVER THAT ARE SUBMITTED AFTER THE
SOLICITATION CLOSES, WILL NOT BE ACCEPTED.
THE ACO WILL APPROVE THE FAT & REPORT.
FAT SAMPLE SHALL NOT BE USED AS PART OF PRODUCTION.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11-1-1487
REVISION: U
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00006) SEE FIRST ARTICLE TEST CLAUSE
FOR DISTRIBUTION
6 16
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
7 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
SECTION E CLAUSES
INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL) ES6333
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(a) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval - Contractor Testing shall be performed in accordance with CLIN
0018.
FAT IAW QAP # 11-1-1487-2 and dwg # 11-1-4111
Reference CLIN 0017, CDRL A001, for additional requirements for the First Article Test Report (FATR).
The DCMA ACO is the FAT approver.
(b) The First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable).
The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated
Government representative to determine that the First Article Test was successfully completed.
INSPECTION AND ACCEPTANCE POINTS: ORIGIN ES7001
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
CAGE:
NAME:
ADDRESS:
CITY, STATE, ZIP
ACCEPTANCE POINT:
CAGE:
NAME:
ADDRESS:
CITY, STATE, ZIP
8 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
REWORK AND REPAIR OF NONCONFORMING MATERIAL ES7012
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications, or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications, or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
DRAWINGS FOR INSPECTION ES7042
When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications and any applicable
Engineering Exceptions associated to the drawings, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.
NOTICE REGARDING FIRST ARTICLE ES7032
a. Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
b. When any of the conditions above occurs, the contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
c. Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
9 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
NOTICE REGARDING FIRST ARTICLE TEST SAMPLE ES6304
a. The approved first article items, as described elsewhere in this contract, consist of a quantity of one that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of zero that successfully passes all specified tests, less the destructive tests, if any, zero serve as a manufacturing standard for the remainder of the contract.
b. A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as:
1) an aid in identifying configuration changes not controlled by the contractual design.
2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
c. The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
USE OF MIL-STD 1916 ES6019
(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics.
(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
*** END OF NARRATIVE E0001 ***
10 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
F-1 CHANGED 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. DESCRIPTION QUANTITY # of DAYS________________________________________________________________________________
CLIN 0018 First Article Test 1 200 Days after contract award
CDRL A001 FAT Report 1 10 Days after FAT approval
CLIN 0011 Production 50 200 days after FAT approval or waiver of FAT and 50 every 30 days
CLIN 0012 - 0015 Production 50 200 days after award and 50 every 30 days. If no break in production, 50 every 30 days.
ACCELERATED DELIVERY IS ACCEPTABLE AT NO ADDITIONAL COST TO THE GOVERNMENT
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. DESCRIPTION QUANTITY # of DAYS________________________________________________________________________________
CLIN 0018 First Article Test 1 ____________
CDRL A001 FAT Report 1 ____________
CLIN 0011 Production 50 ____________
CLIN 0012 - 0015 Production 50 ____________
ACCELERATED DELIVERY IS ACCEPTABLE AT NO ADDITIONAL COST TO THE GOVERNMENT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
SECTION F CLAUSES
11 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
LONG TERM CONTRACTS - FOB DESTINATION FS6458
For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentage:
Plant 7002 (AN5): 100%
Ship To DoDAAC: W25G1U
*** END OF NARRATIVE F0001 ***
12 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION M - EVALUATION FACTORS FOR AWARD
SECTION M PROVISIONS
CONTRACTOR RESPONSIBILITY AND ELIGIBILITY FOR AWARD MS6312
a) The Government may award up to ONE contract to the offerors that:
(1) Submit the lowest evaluated offer if award is based on price only, or the offer that provides the best value to the Government if factors in addition to price are identified elsewhere in this solicitation,
(2) Submit a bid or proposal that meets all the material requirements of this solicitation, and
(3) Meet all the responsibility criteria at FAR 9.104.
(b) To make sure that an offeror meets the responsibility criteria at FAR 9.104 the Government may:
(1) Arrange a visit to the offerors plant and perform a preaward survey;
(2) Ask the offeror to provide financial, technical, production, or managerial background information.
(c) If the offeror does not provide the Government with the data requested within 7 days from the date the requested is received, or if the offeror refuses to have an onsite visit to the offerors facility, the Government may determine the offeror to be nonresponsible.
(d) If the Government visits the offerors facility, please make sure that current certified financial statements and other data relevant to the bid or proposal available for Government personnel to review.
METHOD OF PRICE EVALUATION MS7911
The unit price for each year will be multiplied by the estimated annual requirement for the corresponding year, and the results for each year added together to produce the evaluated price for the total maximum quantity. Based on this method of evaluation, award will be made to the responsible offeror whose offer represents the lowest evaluated price and represents the Best Value to the Government as outlined elsewhere in this solicitation.
EVALUATION FACTORS FOR FIRST ARTICLE TEST REQUIREMENT - INDEFINITE QUANTITY CONTRACT MS6314
(a) If the offeror submits a request for waiver of First Article Approval but fails to comply with the requirements of Section L, Provision LS7304 Provision for Waiver of Required First Article Approval, the requested waiver may not be granted. If the waiver is not granted, more favorable alternative offers of price or delivery, conditioned upon the granting of a waiver, will not be considered in the evaluation process
(b) DELIVERY EVALUATION FACTORS.
(1) As specified in this solicitation, the Government reserves the right to waive the requirement entitled FIRST ARTICLE APPROVAL -
CONTRACTOR TESTING (FAR 52.209-3). In the event of a waiver, the Government will compute a delivery schedule for the first delivery order issued hereunder by excluding all lead times that would be included if first article approval were required. However, in no event shall such accelerated delivery schedule for the first delivery order be considered as an evaluation factor for award, even if such schedule would be more advantageous to the Government. (Note that delivery orders subsequent to the first order shall have delivery schedules as specified in individual orders, or as specified in Section B or F herein, regardless of whether First Article Approval applied initially. Note further that, absent a waiver, the Government expects to require First Article Approval only once during the course of this contract in conjunction with the first delivery order to be issued hereunder. However, the Government reserves the right to require additional first article testing if the Contractor changes or moves the production facility at which the contract item is manufactured, or submits a significant configuration change in the form of an Engineering Change Proposal (ECP/VECP) or a Request for
13 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Variance or Request for Waiver (RFV/RFW), during or after performance on the first delivery order.)
(2) If an offeror requests waiver of First Article Approval but takes exception to the resulting delivery schedule for the first delivery order as described above, the requested waiver will not be granted. In consequence, any award to that offeror shall include all First Article Approval requirements, and the delivery schedule for the first delivery order shall include the appropriate first article lead times.
(c) PRICE EVALUATION FACTORS.
(1) As specified in this solicitation, the Government reserves the right to waive the requirement entitled FIRST ARTICLE APPROVAL
CONTRACTOR TESTING (FAR 52.209-3), and subtract the price of the proposed First Article Test (CLIN 0018) from the proposal of offerors who elect to seek such a waiver. In the event that the offeror requests and receives a waiver of First Article Approval requirements, the price for such testing, as identified by the offeror in CLIN 0018, shall be deducted from the total price otherwise cited for the materiel herein solicited. The offer will then be evaluated for award at the resulting alternate price.
(2) If the offeror requests a waiver of First Article Approval requirements, but fails to separately identify the cost of First
Article Testing in CLIN 0018 of this solicitation, the Government reserves the right to evaluate the offer based upon the prices for
CLIN 0011 - 0015, and to require that offeror perform on the contract at such price whether or not the First Article requirement is waived, at no additional cost to the Government.
(3) If the offeror requests but is not granted a waiver of First Article Approval, evaluation for award will be based upon the full amount entered for CLINs 0011 - 0015: the amount entered for item CLIN 0018 will not be deducted by the Government.
GOVERNMENT-OWNED PROPERTY FOR POSSIBLE USE AND EVALUATION FACTOR FOR USE OF THE GOVERNMENT-OWNED PROPERTY MS7283
ALL OFFERORS ARE REQUESTED TO COMPLETE THE FOLLOWING STATEMENT:
The offeror notifies the Government that there:
( ) is
( ) is not
Government-owned property in its plant(s), or in the plant(s) of any of its prospective subcontractors, which, assuming authorization for its use, ( ) will
( ) will not
( ) may or may not (not finally determined as of the date of this offer) be used in the performance of the contract resulting from this solicitation.
NOTE: Offerors checking is AND will or may or may not above must notify the Government representative listed in Block 7 of the SF 33 at least ten days before the date when offers are due under the solicitation, so that the solicitation can be amended to include the appropriate Government property clause(s). If no such notification is given, authorization for the use of such property in this contract may be denied.
Offerors checking IS and WILL above shall complete the following:
(a) Under each line for entries in the Unit Price and the Amount columns in the Schedule (see Section B of this solicitation), offeror shall add the following evaluation factor line and insert the appropriate unit and total price figures if the conditions of subparagraph
c. below are met:
Evaluation factor: $ ____________ $ _____________
b. Computation of the evaluation factor is explained in paragraph M.__ entitled EVALUATION OF USE OF EXISTING GOVERNMENT-OWNED PROPERTY.
c. An evaluation factor entry is to be made only if:
(1) The offeror or any subcontractor, at any tier, will use Government-owned property in production for this contract; and
(2) The offer is predicated on authorized rent-free use of Government-owned property.
14 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
d. An offeror's insertion or non-insertion of an evaluation factor constitutes, respectively, the offeror's certification that his offer is or is not so predicated. The evaluation factor will be added to the offered price for evaluation purposes. See additional paragraphs concerning Government-owned property in Sections L and M herein.
e. CAUTION Rental charges for the use of Government-owned property may accrue, if timely and appropriate approval of rent-free use is not obtained.
EVALUATION OF USE OF EXISTING GOVERNMENT-OWNED PROPERTY MS7053
(a) Rent-free use of existing facilities, special test equipment, and/or special tooling, title to which is in the Government or to which the Government has the right to take title (all of which is herein described as property), including rent-free use by prospective subcontractors, will be a consideration in the evaluation of responses to this solicitation. Contractor must provide with their proposal, the list of Government Furnished Property (GFP), the acquisition cost, age, and type of GFP.
(b) For purposes of evaluation only, the unit evaluation factors for each classification of property, computed as follows, shall be added by the Government to the price or prices offered. The evaluation factors shall be computed by multiplying the acquisition cost of each item of property by the rental rates specified below, and then multiplying the product obtained by the number of months of use proposed. A minimum of one month of use shall be required for purposes of evaluation. Fractional portions of a month shall be counted as a full month. This final product shall then be divided by the total quantity of units to be produced using such property to determine the unit evaluation factors. The factors shall be separately set forth by the offeror under the offered unit prices.
Monthly Rental Rates
(1) For land and land preparation, buildings, building installations, and land installations other than those items specified in
(2) below: the prevailing commercial rate.
(2) For industrial plant equipment of the types covered by Federal Supply Classification Code Numbers 3405, 3408, 3410, 3411 through 3419 (machine tools), and 3441 through 3449 (secondary metal forming and cutting machines), the following rates shall apply:
Age of Equipment Monthly Rental Rates
0-2 years 3.00%
Over 2 to 3 years 2.00%
Over 3 to 6 years 1.50%
Over 6 to 10 years 1.00%
Over 10 years 0.75%
(3) For personal property and equipment not covered in (1) and (2) above (including all production equipment not in the Federal
Supply Classification Codes set forth above, and including special tooling and special test equipment), the following rates shall apply:
-- Two percent (2.00%) per month for electronic test equipment and automotive equipment;
-- One percent (1.00%) per month for special tooling and for all other property and equipment.
(c) If any item of property is to be used on other work for which use has been authorized during the period such property is requested for use on any contract resulting from this solicitation, the evaluation factors shall be calculated in accordance with the following:
the acquisition cost of each item of property shall be multiplied by the rental rates specified for the applicable classification of property set forth above, and the product obtained shall then be multiplied by the number of months of rent-free use requested. The resulting product shall be multiplied by a fraction, the numerator of which is the amount of use of the property proposed under this solicitation, and the denominator of which is the sum of the previously-authorized use of the property during the period of proposed use and the use proposed under this solicitation. The final product shall then be divided by the total quantity of units to determine the unit evaluation factor. The measurement unit for determining the amount of use to be considered in establishing the fraction referred to in the foregoing calculation shall be direct labor hours, sales, hours of use, or any other measurement unit which will result in an equitable apportionment of the factor. The measurement unit used and the amount of respective uses in sufficient detail to support the proration shall be set forth for each item of property.
(d) For the purposes of determining the evaluation factors set forth above, the following definitions apply:
(1) The term acquisition cost means the total cost to the Government for an item of property, including the cost of (i) transportation, (ii) installation, (iii) accessories to be used with the item, and (iv) any rebuilding and modernization which has
15 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
enhanced the original capability of the item;
(2) The age of an item of property shall be based on the year in which it was manufactured, with an annual birthday on 1 January of each year thereafter. On 1 January following the date of manufacture, the item shall be considered one year old; and on each succeeding January 1st, it shall become one year older (thus, an item manufactured on 15 July 1978 would be one year old on 1 January
1979, and over two years old on and after 1 January 1980).
(e) Where this solicitation provides that the property is offered for use on an as-is basis, F.O.B. loading dock at present location, the Government shall add to the offered price, in addition to the evaluation factors described above, a factor, for purposes of evaluation, which will be composed of the costs to the Government of making such property available at the F.O.B. point, including the costs of disconnection, preparation for shipment, and placement on the loading dock.
*** END OF NARRATIVE M0001 ***
16 16
| SECTION A |
| SECTION B |
| SECTION E |
| SECTION F |
| SECTION M |
File details come from the government source that posted it.