Contractor_Questions_&_Answers.docx

DOCX document 12 KB Posted

Attached to
1670-01-097-8816; p/n 11-1-1487-2; Cargo Release Assembly, Cargo Parachute, Airdrop, M-1
Solicitation number
W56HZV-19-R-0015
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: W56HZV-10-R-0015

NSN: 1670-01-097-8816

Noun: M-1 Cargo Release

March 25 2019 Question 1: Drawing 11-1-1499 is missing from the TDP.

Response from Engineering: Drawing 11-1-1499 was missing from the TDP and is added to FBO.

March 25 2019 Question 2: Document 11-1-4112 Test Procedure is missing.

Response from Engineering: Document 11-1-4111 is the document for the Test Procedure.

March 25 2019 Question 3: Can the components listed as a “Suggested Source” being procured from other vendors?

Response from Engineering: This is a performance based vendor item drawing, but is not a source controlled drawing. Several attempts have been made in the past to acquire additional vendors with no success. Those are the only two vendors that have shown any interest and Capewell is the only one that has produced over the last several years. Any prime vendor of the M-1 Cargo Parachute Release is allowed to seek out new manufacturers of the timer and stem assembly as long as they meet the performance and interface requirements listed on the drawing.