Solicitation_W56HZV17R0015_Question_and_Answer_Log_for_FBO.docx

DOCX document 13 KB Posted

Attached to
INSPECTION- MISCELLANEOUS
Solicitation number
W56HZV17R0015
Issued by

View the file

Other files

File Type Posted
W56HZV17R0015.pdf PDF
CDRL_CMR_A001.pdf PDF
PWS_Attachment_0002v2.pdf PDF
Laboratory_Test_Index_Attachment_0001v2.xlsx XLSX spreadsheet
CDRL_lab_analysis_A002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W56HZV-17-R-0015 Laboratory Analysis Services Questions and Answer Log

1. Question: Will samples being picked up from the site be packed in coolers? (in the PWS document, item #4)

Answer: The contractor is expected to provide coolers, and or any other needed specimen packaging material required for safe transport. The depot will refrigerate any specimens requiring refrigeration until the specimens are picked up at the depot by the contractor.