REMAN_Q A_LOG.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Trucks and Truck Tractors, Wheeled
- Solicitation number
- W56HZV15R0208
About this file
REMAN Q A LOG.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV15R0208-0003.pdf | ||
| W56HZV15R0208-0002.pdf | ||
| W56HZV15R0208-0001.pdf | ||
| W56HZV15R0208.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 REMAN M195A3 Trucks
W56HZV-15-R-0208
Question and Answer Log
| Question | ||||||
| Number | Document | Document Reference | Question/Comments | Answer/Response | Date Received | Date Posted |
| 1 | Solicitation | Section C, Page 12 of 63, Paragraph D. | Section C states: "The contractor shall install COEI IAW the appropriate TMs on truck 100%". However, according to TM |
9-2320-302-10 (Operator's Manual), on page 0019 00-2, there are no COEI on the M915A3 truck. Please clarify this apparent inconsistency.
| Confirmed there are no COEI. Referenced removed from Section C. | 23-Sep-15 | 23-Sep-15 |
| 2 | Solicitation | Section C, Page 16 of 63, Paragraph 8, Subparagraph A. |
Delivery RFP paragraph C.8.A states that: "Each asset must be returned to the RRAD, fully remanufactured no more than 30 days after having been picked up at RRAD." Request the Government change this requirement to".no more than 60 days after having been picked up at RRAD" for the following rationale: The current pick-up/delivery schedule at RRAD is limited to Monday through Thursday, between 0700 and 1500 hours. Trucks completed/accepted by close of business on Thursday must wait 3 days before delivery to RRAD (Monday), thus creating a possible late delivery situation. This situation is beyond the control of the contractor. In order to meet the 30 day remanufacture cycle time (RCT) for all vehicles, contractors will be required to work after normal duty hours, weekends and holidays. As indicated in RFP paragraph C.5.A, RRAD Inspectors will be involved in all manner of inspections, to include, mechanical and paint, road test, re-work, compliance, acceptance, etc. In order to maintain an uninterrupted flow of vehicles through a 30 day RCT, RRAD Inspectors will need to be available after normal duty hours, weekends and holidays. As well, there will need to be sufficient number of RRAD Inspectors readily available as to not impede the remanufacture process while the contractor awaits "an available RRAD Inspector".
The requested revision to a 60 day cycle time will allow both the contractor and RRAD personnel to best plan, schedule and allocate resources to complete the mission.
| 60 calendar days accepted. Changed SOW to reflect "60 Days". | 23-Sep-15 | 23-Sep-15 | |
| 3 | Solicitation | Attachment 0001, page 64 of 64, Question #5 | Attachment 0001- Question 5 refers to a Financial and Organizational attachment. Please provide this attachment and clarify if offerors are required to provide regarding financial and organization information with their proposal. If yes, please allow for additional pages to accommodate this requirement. |
| Attachment 0001 refers to the Technical Questionnaire incorporated into the solicitation. Question 5 has been changed to "RESERVED" no answer needs to be provided for question 5. | 23-Sep-15 | 23-Sep-15 | |
| 4 | Solicitation | Attachment 0001, page 64 of 64, Question #5 | Attachment 0001- Question 5 refers to a Safety Plan, and Quality Assurance Procedures. Are offerors required to provide a safety plan and quality assurance procedures with their proposal? If yes, please allow additional pages to accommodate this requirement. |
| Attachment 0001 refers to the Technical Questionnaire incorporated into the solicitation. Question 5 has been changed to "RESERVED" no answer needs to be provided for question 5. | 23-Sep-15 | 23-Sep-15 |