Attachment_0021_PRICING_WORKSHEET_(Updated_1_Dec_2015).xlsx
XLSX spreadsheet 48 KB Posted
- Attached to
- Cargo and Tanker Vessels
- Solicitation number
- W56HZV15R0069
About this file
PRICING WORKSHEET
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions The Offeror shall complete this spreadsheet by filling in ALL green cells in the "First Ordering Year", "Second Ordering Year" and the "CRDLs" tabs.
| The Total Evaluated Price will include the following adjustments: | |
| 1) | ECP - Calculated automatically in the "Summary" based on input from "First Ordering Year" and "Second Ordering Year" tabs. |
| Calculation detailed in "Summary" tab rows 28-32. | |
| 2) | Data Rights - Adjustment to be determined during the evaluation as identified in M.4.2.5 |
| 3) | Transportation costs to be added during evaluation for FOB origin CLINS per M.4.2.3 |
Note: Adjustments may also be required for HUBZone per RFP Section I, FAR 52.219-4
Summary
Summary of Offeror's Cost/Price Proposal
Year 1 Total $ 1,014,120.00
Year 2 Total 976,119.00
CDRLs 8.00
Total Contract Amount $ 1,990,247.00
ECP Adjustment per M.4.2.6 (see table below) (6,800,000.00)
Sub-Total Incl. ECP Adjustment $ (4,809,753.00)
Data Rights Adjustment per M.4.2.5 - 0
Transportation Cost Adjustment for FOB Origin CLINS per M.4.2.3 - 0
| Total Evaluated Cost/Price | $ (4,809,753.00) | |||
| Engineering Change Proposal (ECP) Modification Adjustment per M.4.2.6 | ||||
| $ 45,450,000.00 | ||||
| Proposed Price | Adjustment per RFP Section M.4.2.6.3 |
| Tier 1: | $ 180.00 | $0.00 |
| Tier 1+ 2 | $ 196.00 | $ 2,720,000.00 |
| Tier 1+2+3 | $ 212.00 | $ 4,760,000.00 |
| Tier 1+2+3+4 | $ 224.00 | $ 6,120,000.00 |
| Tier 1+2+3+4+5 | $ 228.00 | $ 6,800,000.00 |
| Total ECP Adjustment: | $ 6,800,000.00 | |
| Note: Adjustments to the Total Evaluated Cost/Price may be required for HUBZone per RFP Section I, FAR 52.219-4 |
Updated 1 December 2015
Attachment 21
First Ordering Year Offeror:
| CLIN | Description | CLIN Contract Type | Work Task # | Quantity | EA/LO | Unit Price | Extended Price | CLIN Total Price |
| Tier 1 SLEP Repower Modification and OCCM | ||||||||
| 1001 | First Ordering Year - SLEP Repower mod and option ECP's | FFP | N/A | 2 | EA | $ 26.00 | ||
| SLEP Repower Modification | $ 1.00 | $ 2.00 |
| Tier 2 ECPs | SLEP ECP NSWC-V-5213, Engine Operating Station (EOS) (2-ton) & Pilot House (4-ton) Air Conditioning Units | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-6017, House (16-Ton) Air Conditioning Unit | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7686, Gun Mount, Ballistic Plating and Ammo/Armor Stowage | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7691, Remote Motor Controllers | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| Tier 3 ECPs | SLEP ECP NSWC-V-7684, Forward Anchor Winches and Aft Controls | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-7688, Galley Mess Equipment and Arrangement | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7689, Dry Storage and Refrigeration Equipment | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7693, Bow Thruster Compartment Bilge / Ballast Valves | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| Tier 4 ECPs | SLEP ECP NSWC-V-7687, Passive Force Protection Device Power Supply. | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-7690, Head Refurbishment | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7692, Seawater Flush System | N/A | 2 | EA | $ 1.00 | $ 2.00 |
Tier 5 ECPs SLEP ECP TACV-9154, Army Watercraft Module Berthing (AWM-B) Integration Kit N/A 2 EA $ 1.00 $ 2.00
| 1002 | First Ordering Year - OCCM (Work Tasks 1-35) | FFP | 2 | LO | 70.00 | ||||
| Towing Services | 1 | $ 1.00 | $ 2.00 | ||||||
| Arrival Tests and Inspections | 2 | $ 1.00 | $ 2.00 | ||||||
| Drydocking | 3 | $ 1.00 | $ 2.00 | ||||||
| Load Line Certificate | 4 | $ 1.00 | $ 2.00 | ||||||
| Potable Water Tanks Cleaning and Painting | 5 | $ 1.00 | $ 2.00 | ||||||
| Tiller Arms Inspection and Repairs | 6 | $ 1.00 | $ 2.00 | ||||||
| Ballast Tanks Cleaning and Painting | 7 | $ 1.00 | $ 2.00 | ||||||
| AFFF Storage Tank Cleaning, Painting and Repairs | 8 | $ 1.00 | $ 2.00 | ||||||
| Stern Tube Bearings/Strut Bearings Replacements | 9 | $ 1.00 | $ 2.00 | ||||||
| Propeller Shafts Mechanical Seals Repairs | 10 | $ 1.00 | $ 2.00 | ||||||
| Rudders Repairs | 11 | $ 1.00 | $ 2.00 | ||||||
| Sludge and Dirty Oil Tanks Cleaning and Painting | 12 | $ 1.00 | $ 2.00 | ||||||
| Engine Room Exhaust Ventilation Ducts Repairs, Cleaning and Painting | 13 | $ 1.00 | $ 2.00 | ||||||
| Rudder Posts Packing Replacement | 14 | $ 1.00 | $ 2.00 | ||||||
| Hull Zincs Replacements | 15 | $ 1.00 | $ 2.00 | ||||||
| Sea Valves, Sea Strainers and Sea Chests Repairs | 16 | $ 1.00 | $ 2.00 | ||||||
| Anchors, Chains and Chain Lockers Cleaning and Painting | 17 | $ 1.00 | $ 2.00 | ||||||
| Fuel Tanks Cleaning/Inspection | 18 | $ 1.00 | $ 2.00 | ||||||
| Tank Level Indicating System Repairs | 19 | $ 1.00 | $ 2.00 | ||||||
| Shaft Alignment and Bearings Wear Inspection | 20 | $ 1.00 | $ 2.00 | ||||||
| Steering System Repairs | 21 | $ 1.00 | $ 2.00 | ||||||
| Bow Thruster Repairs | 22 | $ 1.00 | $ 2.00 | ||||||
| Sewage Treatment System Servicing | 23 | $ 1.00 | $ 2.00 | ||||||
| Hull Cleaning and Painting (Underwater Areas and External Hull) | 24 | $ 1.00 | $ 2.00 | ||||||
| Hull Cleaning and Painting (Main Deck and Above, External Areas) | 25 | $ 1.00 | $ 2.00 | ||||||
| Watertight Doors, Hatches and Scuttles Repairs | 26 | $ 1.00 | $ 2.00 | ||||||
| Fire Suppression System Servicing | 27 | $ 1.00 | $ 2.00 | ||||||
| Compressed Air System Servicing | 28 | $ 1.00 | $ 2.00 | ||||||
| Main and Emergency Switchboard Meters Calibration | 29 | $ 1.00 | $ 2.00 | ||||||
| Davit Inspection, Repairs and Certification | 30 | $ 1.00 | $ 2.00 | ||||||
| Bow Ramp Repairs and Ramp Dog Replacements | 31 | $ 1.00 | $ 2.00 | ||||||
| Emergency Generator Compartment and Focsle's Cleaning and Painting | 32 | $ 1.00 | $ 2.00 | ||||||
| Engine Room, Tunnel, Steering Gear Room, and Bow Thruster Room Bilge Cleaning and Painting | 33 | $ 1.00 | $ 2.00 | ||||||
| Engine Room, Tunnel, Steering Gear Room, and Bow Thruster Room Bulkhead, O/H and Machinery Surfaces Cleaning and Painting | 34 | $ 1.00 | $ 2.00 | ||||||
| Work Completion Tests and Requirements | 35 | $ 1.00 | $ 2.00 | ||||||
| 1003 | First Ordering Year - OCCM Vessel 1 (Work Tasks 36 - 40) | CPFF | 1 | LO | 5.00 | ||||
| Ultrasonic Testing | 36 | $ 1.00 | $ 1.00 | ||||||
| Welding | 37 | $ 1.00 | $ 1.00 | ||||||
| Plate Renewal and Structural Repairs | 38 | $ 1.00 | $ 1.00 | ||||||
| Ballast Tanks Zincs Renewal | 39 | $ 1.00 | $ 1.00 | ||||||
| Deckhouse Window Repairs | 40 | $ 1.00 | $ 1.00 | ||||||
| 1004 | First Ordering Year - OCCM Vessel 2 (Work Tasks 36 - 40) | CPFF | 1 | LO | 5.00 | ||||
| Ultrasonic Testing | 36 | $ 1.00 | $ 1.00 | ||||||
| Welding | 37 | $ 1.00 | $ 1.00 | ||||||
| Plate Renewal and Structural Repairs | 38 | $ 1.00 | $ 1.00 | ||||||
| Ballast Tanks Zincs Renewal | 39 | $ 1.00 | $ 1.00 | ||||||
| Deckhouse Window Repairs | 40 | $ 1.00 | $ 1.00 | ||||||
| 1005 | First Ordering Year - OCCM (Work Task 41) | FFP | 41 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | |
| 1006 | First Ordering Year - OCCM (Work Task 42) | FFP | 42 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | |
| 1007 | First Ordering Year - OCCM (Work Task 43) | FFP | 43 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | |
| 1008 | First Ordering Year - OCCM (Work Tasks 7.8 thru 7.9) | FFP | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | ||
| 1009 | First Ordering Year - Training | FFP | N/A | 1 | LO | $ 1.00 | $ 1.00 | 1.00 | |
| 1010 | First Ordering Year - Logistics Fielding | FFP | N/A | 2 | LO | $ 1.00 | $ 2.00 | 2.00 | |
| 1011 | First Ordering Year - Government Testing / Contr Test Support | FFP | N/A | 1 | LO | 2.00 | |||
| Vessel 1 (C.14 and C.18) | $ 1.00 | $ 1.00 | |||||||
| Vessel 2 (C.14) | $ 1.00 | $ 1.00 | |||||||
| 1012 | First Ordering Year - Travel | CNF | N/A | 1 | LO | $ 38,000.00 | $ 38,000.00 | 38,000.00 | |
| 1013 | First Ordering Year - Over and Above Vessel 1 | Fee Percentage: | CPFF | N/A | 1 | LO | $ 488,000.00 | $ 488,000.00 | 488,000.00 |
| 1014 | First Ordering Year - Over and Above Vessel 2 | Fee Percentage: | CPFF | N/A | 1 | LO | $ 488,000.00 | $ 488,000.00 | 488,000.00 |
| 1015 | First Ordering Year - MITD Engine Set | FFP | N/A | 1 | EA | $ 1.00 | $ 1.00 | 1.00 |
Year 1 Proposed Total: $ 1,014,120.00
| Summary of Tier 1-5 Totals to be used in the ECP Adjustment | ||
| Tier 1 | SLEP Repower Modification (Found Within CLIN 1001) and OCCM (CLINS 1002-1008) | $ 90.00 |
| Tier 2 | ECPs Identified as Tier 2 Within CLIN 1001 | $ 8.00 |
| Tier 3 | ECPs Identified as Tier 3 Within CLIN 1001 | $ 8.00 |
| Tier 4 | ECPs Identified as Tier 4 Within CLIN 1001 | $ 6.00 |
| Tier 5 | ECPs Identified as Tier 5 Within CLIN 1001 | $ 2.00 |
Solicitation W56HZV-15-R-0069 Pricing Evaluation Worksheet Attachment 21
Second Ordering Year Offeror:
| CLIN | Description | CLIN Contract Type | Work Task # | Quantity | EA/LO | Unit Price | Extended Price | CLIN Total Price |
| Tier 1 SLEP Repower Modification and OCCM | ||||||||
| 2001 | Second Ordering Year - SLEP Repower mod and option ECP's | FFP | N/A | 2 | EA | $ 26.00 | ||
| SLEP Repower Modification | $ 1.00 | $ 2.00 |
| Tier 2 ECPs | SLEP ECP NSWC-V-5213 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-6017 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7686 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7691 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| Tier 3 ECPs | SLEP ECP NSWC-V-7684 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-7688 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7689 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7693 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| Tier 4 ECPs | SLEP ECP NSWC-V-7687 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-7690 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7692 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
Tier 5 ECPs SLEP ECP TACV-9154 N/A 2 EA $ 1.00 $ 2.00
| 2002 | Second Ordering Year - OCCM (Work Tasks 1-35) | FFP | 2 | LO | 70.00 | ||||
| Towing Services | 1 | $ 1.00 | $ 2.00 | ||||||
| Arrival Tests and Inspections | 2 | $ 1.00 | $ 2.00 | ||||||
| Drydocking | 3 | $ 1.00 | $ 2.00 | ||||||
| Load Line Certificate | 4 | $ 1.00 | $ 2.00 | ||||||
| Potable Water Tanks Cleaning and Painting | 5 | $ 1.00 | $ 2.00 | ||||||
| Tiller Arms Inspection and Repairs | 6 | $ 1.00 | $ 2.00 | ||||||
| Ballast Tanks Cleaning and Painting | 7 | $ 1.00 | $ 2.00 | ||||||
| AFFF Storage Tank Cleaning, Painting and Repairs | 8 | $ 1.00 | $ 2.00 | ||||||
| Stern Tube Bearings/Strut Bearings Replacements | 9 | $ 1.00 | $ 2.00 | ||||||
| Propeller Shafts Mechanical Seals Repairs | 10 | $ 1.00 | $ 2.00 | ||||||
| Rudders Repairs | 11 | $ 1.00 | $ 2.00 | ||||||
| Sludge and Dirty Oil Tanks Cleaning and Painting | 12 | $ 1.00 | $ 2.00 | ||||||
| Engine Room Exhaust Ventilation Ducts Repairs, Cleaning and Painting | 13 | $ 1.00 | $ 2.00 | ||||||
| Rudder Posts Packing Replacement | 14 | $ 1.00 | $ 2.00 | ||||||
| Hull Zincs Replacements | 15 | $ 1.00 | $ 2.00 | ||||||
| Sea Valves, Sea Strainers and Sea Chests Repairs | 16 | $ 1.00 | $ 2.00 | ||||||
| Anchors, Chains and Chain Lockers Cleaning and Painting | 17 | $ 1.00 | $ 2.00 | ||||||
| Fuel Tanks Cleaning/Inspection | 18 | $ 1.00 | $ 2.00 | ||||||
| Tank Level Indicating System Repairs | 19 | $ 1.00 | $ 2.00 | ||||||
| Shaft Alignment and Bearings Wear Inspection | 20 | $ 1.00 | $ 2.00 | ||||||
| Steering System Repairs | 21 | $ 1.00 | $ 2.00 | ||||||
| Bow Thruster Repairs | 22 | $ 1.00 | $ 2.00 | ||||||
| Sewage Treatment System Servicing | 23 | $ 1.00 | $ 2.00 | ||||||
| Hull Cleaning and Painting (Underwater Areas and External Hull) | 24 | $ 1.00 | $ 2.00 | ||||||
| Hull Cleaning and Painting (Main Deck and Above, External Areas) | 25 | $ 1.00 | $ 2.00 | ||||||
| Watertight Doors, Hatches and Scuttles Repairs | 26 | $ 1.00 | $ 2.00 | ||||||
| Fire Suppression System Servicing | 27 | $ 1.00 | $ 2.00 | ||||||
| Compressed Air System Servicing | 28 | $ 1.00 | $ 2.00 | ||||||
| Main and Emergency Switchboard Meters Calibration | 29 | $ 1.00 | $ 2.00 | ||||||
| Davit Inspection, Repairs and Certification | 30 | $ 1.00 | $ 2.00 | ||||||
| Bow Ramp Repairs and Ramp Dog Replacements | 31 | $ 1.00 | $ 2.00 | ||||||
| Emergency Generator Compartment and Focsle's Cleaning and Painting | 32 | $ 1.00 | $ 2.00 | ||||||
| Engine Room, Tunnel, Steering Gear Room, and Bow Thruster Room Bilge Cleaning and Painting | 33 | $ 1.00 | $ 2.00 | ||||||
| Engine Room, Tunnel, Steering Gear Room, and Bow Thruster Room Bulkhead, Overhead and Machinery Surfaces Cleaning and Painting | 34 | $ 1.00 | $ 2.00 | ||||||
| Work Completion Tests and Requirements | 35 | $ 1.00 | $ 2.00 | ||||||
| 2003 | Second Ordering Year - OCCM Vessel 1 (Work Tasks 36 -40) | CPFF | 1 | LO | 5.00 | ||||
| Ultrasonic Testing | 36 | $ 1.00 | $ 1.00 | ||||||
| Welding | 37 | $ 1.00 | $ 1.00 | ||||||
| Plate Renewal and Structural Repairs | 38 | $ 1.00 | $ 1.00 | ||||||
| Ballast Tanks Zincs Renewal | 39 | $ 1.00 | $ 1.00 | ||||||
| Deckhouse Window Repairs | 40 | $ 1.00 | $ 1.00 | ||||||
| 2004 | Second Ordering Year - OCCM Vessel 2 (Work Tasks 36 -40) | CPFF | 1 | LO | 5.00 | ||||
| Ultrasonic Testing | 36 | $ 1.00 | $ 1.00 | ||||||
| Welding | 37 | $ 1.00 | $ 1.00 | ||||||
| Plate Renewal and Structural Repairs | 38 | $ 1.00 | $ 1.00 | ||||||
| Ballast Tanks Zincs Renewal | 39 | $ 1.00 | $ 1.00 | ||||||
| Deckhouse Window Repairs | 40 | $ 1.00 | $ 1.00 | ||||||
| 2005 | Second Ordering Year - OCCM (Work Task 41) | FFP | 41 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | |
| 2006 | Second Ordering Year - OCCM (Work Task 42) | FFP | 42 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | |
| 2007 | Second Ordering Year - OCCM (Work Task 43) | FFP | 43 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | |
| 2008 | Second Ordering Year - OCCM (Work Task 7.8 thru 7.9) | FFP | 7.8 - 7.9 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | |
| 2009 | Second Ordering Year - Logistics Fielding | FFP | N/A | 2 | LO | $ 1.00 | $ 2.00 | 2.00 | |
| 2010 | Second Ordering Year - Contractor Testing Support | FFP | N/A | 2 | LO | $ 1.00 | $ 2.00 | 2.00 | |
| 2011 | Second Ordering Year - Over and Above Vessel 1 | Fee Percentage: | CPFF | N/A | 1 | LO | $ 488,000.00 | $ 488,000.00 | 488,000.00 |
| 2012 | Second Ordering Year - Over and Above Vessel 2 | Fee Percentage: | CPFF | N/A | 1 | LO | $ 488,000.00 | $ 488,000.00 | 488,000.00 |
| 2013 | Second Ordering Year - MITD Engines | FFP | N/A | 1 | EA | $ 1.00 | $ 1.00 | 1.00 |
Year 2 Proposed Total: $ 976,119.00
| Tier 1-5 Totals to be used in the ECP Adjustment | ||
| Tier 1 | SLEP Repower Modification (Found Within CLIN 2001) and OCCM (CLINS 2002-2008) | $ 90.00 |
| Tier 2 | ECPs Identified as Tier 2 Within CLIN 2001 | $ 8.00 |
| Tier 3 | ECPs Identified as Tier 3 Within CLIN 2001 | $ 8.00 |
| Tier 4 | ECPs Identified as Tier 4 Within CLIN 2001 | $ 6.00 |
| Tier 5 | ECPs Identified as Tier 5 Within CLIN 2001 | $ 2.00 |
Solicitation W56HZV-15-R-0069 Pricing Evaluation Worksheet Attachment 21
CDRLs Offeror: 0
| CLIN | Description | CLIN Contract Type | Quantity | EA/LO | Unit Price | Per Solicitation |
| 3001 | Contract Data Requirements List | |||||
| A001 | Condition Found Report (CFR) | 1 | LO | NSP | ||
| A002 | Warranty Performance Report | 1 | LO | NSP | ||
| A003 | Scientific and Technical Report | 1 | LO | NSP | ||
| A004 | Corrosion Prevention and Control Plan | 1 | LO | NSP | ||
| A005 | Certificate of Compliance | 1 | LO | NSP | ||
| A006 | Technical Data Package (TDP) | FFP | 1 | LO | $ 1.00 | |
| A007 | Acceptance Test Report (ATR) | 1 | LO | NSP | ||
| A008 | Shipboard Industrial Test Procedure | 1 | LO | NSP | ||
| A009 | Conference Agenda | 1 | LO | NSP | ||
| A010 | Record of Meeting Minutes | 1 | LO | NSP | ||
| A011 | Integrated Program Management Report (IPMR) | 1 | LO | NSP | ||
| A012 | Performance and Cost Report | 1 | LO | NSP | ||
| A013 | Design Review Information Package (DRIP) | 1 | LO | NSP | ||
| A014 | Contractor's Configuration Management Plan | 1 | LO | NSP | ||
| A015 | Engineering Change Proposal (ECP) | 1 | LO | NSP | ||
| A016 | Notice of Revision (NOR) | 1 | LO | NSP | ||
| A017 | Engineering Release Record (ERR) | 1 | LO | NSP | ||
| A018 | Physical Configuration Audit (PCA) Plan | 1 | LO | NSP | ||
| A019 | System Safety Hazard Analysis Report (SSHA) | 1 | LO | NSP | ||
| A020 | Safety Assessment Report (SAR) | 1 | LO | NSP | ||
| A021 | Hazard Materials Management Program (HMMP) Report NAS 411 | 1 | LO | NSP | ||
| A022 | Logistics Product Data | 1 | LO | NSP | ||
| A023 | Maintenance Allocation Chart (MAC) | 1 | LO | NSP | ||
| A024 | Level of Repair Analysis (LORA) | 1 | LO | NSP | ||
| A025 | Unexercised Option Quantity - Newly Developed TM's | FFP | 1 | LO | $ 1.00 | |
| A026 | Unexercised Option Quantity - Revised TM's | FFP | 1 | LO | $ 1.00 | |
| A027 | Unexercised Option Quantity - Change Package TM's | FFP | 1 | LO | $ 1.00 | |
| A028 | Technical Manual Validation Plan | 1 | LO | NSP | ||
| A029 | Validation Report | 1 | LO | NSP | ||
| A030 | Supply | 1 | LO | NSP | ||
| A031 | Technical Report-Study/Services | 1 | LO | NSP | ||
| A032 | Provisioning Performance Schedule | 1 | LO | NSP | ||
| A033 | Provisioning Parts List (PPL) | 1 | LO | NSP | ||
| A034 | Engineering Data For Provisioning (EDFP) | 1 | LO | NSP | ||
| A035 | Logistics Product Data | 1 | LO | NSP | ||
| A036 | Source Data | 1 | LO | NSP | ||
| A037 | Training Materials | FFP | 1 | LO | $ 1.00 | |
| A038 | Training Materials | FFP | 1 | LO | $ 1.00 | |
| A039 | Commercial Off The Shelf (COTS) Manuals | 1 | LO | NSP | ||
| A040 | Technical Report - Study Services | 1 | LO | NSP | ||
| A041 | Inspection and Test Plan | 1 | LO | NSP | ||
| A042 | Craft Acceptance Test Schedule | 1 | LO | NSP | ||
| A043 | Qualification Test Report (QTR) | 1 | LO | NSP | ||
| A044 | Test Change Proposal (TCP) | 1 | LO | NSP | ||
| A045 | Logistics Product Data | 1 | LO | NSP | ||
| A046 | Failure Analysis and Corrective Action Report (FACAR) | 1 | LO | NSP | ||
| A047 | Product Quality Deficiency Report (PQDR) | 1 | LO | NSP | ||
| A048 | Certification / Data Report | 1 | LO | NSP | ||
| A049 | Quality Inspection Test, Demonstration and Evaluation Report | 1 | LO | NSP | ||
| A050 | Unexercised Option Quantity - Certificate of Compliance | FFP | 1 | LO | $ 1.00 | |
| A051 | Unexercised Option Quantity - Technical Data Package (TDP) | FFP | 1 | LO | $ 1.00 | |
| A052 | Special Packaging Instruction (SPI) | 1 | LO | NSP | ||
| A053 | Packaging Test Report | 1 | LO | NSP | ||
| A054 | Proposed Spare Parts List | 1 | LO | NSP | ||
| A055 | Modification Work Order | 1 | LO | NSP |
| 4001 | Contractor Manpower Reporting | 1 | LO | NSP |
| Total CDRLs | $ 8.00 |
Solicitation W56HZV-15-R-0069 Pricing Evaluation Worksheet Attachment 21
File details come from the government source that posted it. Updated .